Forwards Updated Listing of Correspondence to Which NRC Response Expected.Acks Recent Efforts to Complete Licensing Action on Submittals Re Mods to Vacuum Breakers on Mark I Containments & Refueling Interlock Surveillances
ML20209C765
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/20/1987
From: Gucwa L
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
SL-2311, NUDOCS 8704290070
Download: ML20209C765 (5)


Text

Georgim Fbwer Company 333 Piedmont Avenue o

Atlanta Georgia 30308 Telephone 404 526-6526 Mailing Address:

Fbst Office Box 4545 Atlanta, Georgia 30302 h

Georgia Power L T. Gucwa tv southen etttic system Manager Nuclear Safety and Licensing SL-2311 1195C X7GJi_7-H200 April 20, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D. C.

20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 PLANT HATCH UNITS 1, 2 OUTSTANDING SUBMITTALS LIST Gentlemen:

Enclosed please find an updated listing of those items of correspondence with the NRC to which a written response is expected.

The enclosure is tabulated chronologically by Georgia Power Company's submittal date.

Georgia Power is prepared to discuss modifications to this status report and will promptly address any questions you may have regarding these licensing issues.

Georgia Power Company acknowledges and appreciates the recent NRC efforts to complete licensing action on our submittals related to modifications to vacuum breakers on Mark I containments and refueling interlock surveillances.

If you have any questions in this regard, please contact this office at any time.

Sincerely, c#'f" 6 L. T. Gucwa MJB/lc

Enclosure:

[

0 I

1: Outstanding Licensing Issues Hith Submittal At NRC 8704290070 870420 PDR ADOCK 05000321 P

PDR 1

]

.I GeorgiaPower b U. S. Nuclear Regulatory Commission ATTN: Document Control Desk April 20, 1987 Page Two c: Georaia Power Comoany U. S. Nuclear Reaulatory Commission Mr. J. P. O'Reilly Dr. J. N. Grace, Regional Administrator Mr. J. T. Beckham, Jr.

Mr. P. Holmes-Ray, Senior Resident GO-NORMS Inspector - Hatch Mr. L. P. Crocker, Licensing Project Manager - Hatch 1195C 700775

Georgia Power d ENCLOSURE OUTSTANDING LICENSING ISSUES HITH SUBMITTAL AT NRC LETTER HATCH DAIE ILNII SUBJECT Key 0-APPROVAL OF ITEM REQUIRED FOR UPCOMING O'JTAGE C-NRC ACTION COMPLETE ON ITEM SINCE LAST REPORT N-ITEM ADDED SINCE LAST REPORT 09/12/84 321 PROPOSED TECHNICAL SPECIFICATIONS - OPERABILITY DEFINITION 01/10/85 366 REQUEST TO RESCIND CONFIRMATORY ORDER ON REACTOR COOLANT SYSTEM STAINLESS STEEL PIPE 05/13/85 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEISMIC SPECTRA BROADENING 06/03/85 321,366 REQUEST FOR ADDITIONAL INFORMATION GENERIC LETTER 83 SALEM EVENT - SCRAM BREAKER FAILURE 06/25/85 321,366 PROPOSED CHANGES TO IST PROGRAM 01/06/86 366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

i DELETE REQUIREMENT FOR HYDROGEN RECOMBINERS 01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - 45 SECONDS ON SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVE CLOSURE TIME 01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

SHIFT OVERTIME REQUIREMENTS 01/07/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

AUTOMATIC ISOLATION OF PURGE AND VENT ON HIGH RADIATION SIGNAL (THI ITEM) 02/17/86 331,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

REORGANIZATION - RESPONSIBILITY FOR RADIOLOGICAL ENVIRONMENTAL MONITORING, MET TOWER LOCATION, QA RECORDS, DELETE EPDD, ETS PROCEDURE APPROVAL, PRB/ SRB COMPOSITION AND QUORUM, AUDIT REQUIREMENTS 1195C E-1 4/20/87 SL-2311

'*"?

Georgia Power b ENCLOSURE OUTSTANDING LICENSING ISSUES HITH SUBMITTAL AT NRC LETTER HATCH D

UNIT SUBJECT EE 02/28/86 321,366 PROPOSED LICENSE EXTENSION TO 40 YEARS FROM OPERATING LICENSE VICE CONSTRUCTION PERMIT 03/13/86 321,366 C

REQUEST FOR ADDITIONAL INFORMATION - MODIFICATION OF VACUUM BREAKERS ON MARK 1 CONTAINMENTS -

GENERIC LETTER 83-08 03/27/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

EQUALIZING REACTOR PROTECTION SYSTEM SPECIFICATIONS BETHEEN UNITS 03/31/86 321,366 PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS -

EMERGENCY POWER - DIESEL GENERATOR TESTING -

GENERIC LETTER 84-15 04/04/86 366 PROPOSED DELETION OF BUILDING SETTLEMENT TECHNICAL SPECIFICATIONS HITH INCORPORATION OF SETTLEMENT CRITERIA FROM OUR 12/1/78 LETTER INTO PLANT PROCEDURES 06/20/86 321,366 CHANGE TO TECHNICAL SPECIFICATIONS - SINGLE LOOP OPERATION AND JET PUMP SURVEILLANCE 08/25/86 321,366 CHANGE TO RHCU LEAKAGE DETECTION TECHNICAL SPECIFICATIONS - HIGH TEMPERATURE ISOLATION l

09/09/86 321,366 CHANGE TO TECHNICAL SPECIFICATIONS - RIVER LEVEL 09/09/86 321 C

PROPOSED TECHNICAL SPECIFICATION CHANGE I

I REFUELING INTERLOCK SURVEILLANCE 10/24/86 321,366 PROPOSED TECHNICAL SPECIFICATION CHANGE FOR FIRE PROTECTION COMPLIANCE ADD REQUIREMENT OF PERFORMING EVERY THIRD TEST OF EQUIPMENT l

CONTROLLED FROM REMOTE SHUTDOHN PANELS FROM SAID PANELS 10/27/86 321,366 PROPOSED REVISION TO TECHNICAL SPECIFICATIONS -

DELETION OF ORGANIZATIONAL FIGURES, REALIGNMENT OF HNP STRUCTURE 1195C E-2 4/20/87 SL-2311 rwm l

Georgia Power d ENCLOSURE OUTSTANDING LICENSING ISSUES HITH SUBMITTAL AT NRC LETTER HATCH ILATE ILNJT SUBJECT 11/06/86 321 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION -

COMMENTS REGARDING IGSCC INSPECTION AND REPAIR -

UT SUBCONTRACTORS 11/14/86 321 INSERVICE INSPECTION RELIEF REQUEST TO CLOSE OUT FIRST 10 YEAR ISI INTERVAL 11/14/86 321,366

RESPONSE

TO VERBAL REQUEST FOR ADDITIONAL INFORMATION - CABLE TRAY SUPPORTS 12/23/86 321,366 DETAILED CONTROL ROOM DESIGN REVIEH 02/06/87 321 0

PROPOSED ATHS TECHNICAL SPECIFICATIONS - BORON CONCENTRATION IN STANDBY LIQUID CONTROL 02/13/87 321,366 0

PROPOSED AMENDMENT TO TECHNICAL SPECIFICATIONS -

LEAD TEST ASSEMBLIES - SCRAM TIME, MCPR, MAPLHGR 02/13/87 321,366 REQUEST TO REVISE REPORTING REQUIREMENT TECHNICAL SPECIFICATIONS TO FIT LICENSEE EVENT REPORT REQUIREMENTS 02/20/87 321 0

INSERVICE INSPECTION PLAN FOR NEXT HNP-1 OUTAGE -

AUSTENETIC STAINLESS STEEL 03/04/87 321,366 0

PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

APPENDIX J VALVES 03/04/87 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEISMIC S0IL ANALYSIS 03/04/87 321,366 0

CHANGES TO TECHNICAL SPECIFICATIONS - NUCLEAR HYDR 0 03/13/87 321,366 N

STATEMENT OF POSITION - NUCLEAR HYDRO - APPEAL LETTER 03/27/87 321,366 N

PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

CORE SPRAY DELTA P

(BREAK DETECTION)

INSTRUMENTATION 1195C E-3 4/20/87 SL-2311 700775