ML20209A393

From kanterella
Jump to navigation Jump to search
3 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance
ML20209A393
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/22/2020
From:
Dominion Energy Nuclear Connecticut
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20209A356 List:
References
20-223
Download: ML20209A393 (3)


Text

Millstone Power Station Unit 3 Safety Analysis Report Chapter 17: Quality Assurance

Table of Contents tion Title Page QUALITY ASSURANCE PROGRAM TOPICAL REPORT ................. 17.1-1

QUALITY ASSURANCE PROGRAM TOPICAL REPORT omprehensive Quality Assurance Program (QAP) has been developed to assure conformance h established regulatory requirements, set forth by the Nuclear Regulatory Commission, and epted industry standards. The participants in the QAP assure that the design, procurement, struction, testing, operation, maintenance, repair, and modification of nuclear power plants are ormed in a safe and effective manner.

QAPD Topical Report complies with the requirements set forth in Appendix B of 10 CFR 50, along with applicable sections of the Safety Analysis Report (SAR) for each license lication, and is responsive to NUREG-0800, which describes the information presented in the lity Assurance Section of the SARs for nuclear power plants.

s QAPD is also established, maintained, and executed with regard to Radioactive Material nsport Packages as allowed by 10 CFR 71.101(f).

QAPD Topical Report is submitted periodically to the NRC in accordance with CFR 50.54(a).