Forwards Safety Insp Repts 50-456/86-60 & 50-457/86-50 on 861027-1211.No Violation or Deviation Noted
ML20207N214
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 01/08/1987
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20207N215 List:
References
NUDOCS 8701140054
Download: ML20207N214 (2)


See also: IR 05000456/1986060

Text

{{#Wiki_filter:--. ,c'

       4
                                               dhH 0 8 ggg7
          Docket No. 50-456
          Docket No. 50-457
          Commonwealth Edison Company
          ATTN:   Mr. Cordell Reed
                  Vice President
          Post' Office Box 767
          Chicago, IL 60690
          Gentlemen:
          This refers to the routine safety inspection conducted by Mr. A. Dunlop, Jr.
          of this office, on October 27 through December 11, 1986, of activities at the
          Braidwood Station, Units 1 and 2, authorized by NRC Operating License No. NPF-59
          and Construction Permit No. CPPR-133 and to the discussion of our findings with
          Mr.  P.'L. Barnes at the conclusion of the inspection.
          The enclosed copy of our inspection report identifies areas examined during
          the inspection. Within these areas, the inspection consisted of a selective
          examination of procedures and representative records, observations, and
          interviews with personnel.
          No violations or deviations with NRC requirements were identified during the
          course of this inspection.
          In accordance with 10 CFR 2.790 of_the Commission's regulations, a copy of
          this letter and the enclosed inspection report will be placed in the NRC's
         .Public Document Room.
          We will-gladly discuss any questions you have concerning this inspection.
                                                    Sincerely,
                                           Originaf Signed By C. W. Hehl
                                                    Charles W. Hehl, Chief
                                                    Operations Branch
          Enclosure: Inspection Reports
                No. 50-456/86060(DRS);
                No. 50-457/86050(DRS)
          See Attached Distribution
            e+                                   d
          R II                  RI             RII              R4I
               CAh                Ch/g           4-
                                                                 4
          Dunlop/nma            Ring           Lik e           H ahl
                                        '
                                                                 } V\                  \\
           8701140054 870108                                     II
            DR    ADOCK 0500       6
                                                                                       [[f

r-

 -. ,
      Commonwealth Edison Company.           2 M 0 8 IWI

r

      Distribution
      cc w/ enclosure:
      D. L. Farrar, Director
         of Nuclear. Licensing
      M. Wallace, Project Manager
      D. Shamblin, Construction
         Superintendent
      E. E. Fitzpatrick, Station
         Manager
      P. L. Barnes, Regulatory
         Assurance Supervisor
      DCS/RSB(RIDS)
      Licensing Fee Management Branch-
       Resident Inspector, RIII
         Braidwood
       Resident Inspector, RIII Byron
       Phyllis Dunton, Attorney
         General's Office Environmental
         Control Division
       D. W. Cassel, Jr. , Esq.
       J. W. McCaffrey, Chief, Public
          Utilities Division
       H. S. Taylor, Quality Assurance
          Division
       E. Chan, ELD
       J. Moore, ELD
       G. Berry, ELD
       J. Stevens, NRR
       The Honorable Herbert Grossman, ASLB
       The Honorable A. Dixon Ca11ihan, ASLB
       .The Honorable Richard F. Cole, ASLB

}}