Responds to Denying Util 880812 Request to Revise Tech Spec 3.3-3 to Reflect Proposed Changes in Actuation Logic for NSSS Scheduled for Jan 1989.Justification for Change & No Significant Hazards Analysis Encl
ML20207L266
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 10/06/1988
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20207L269 List:
References
NUDOCS 8810170264
Download: ML20207L266 (3)


Text

.- - . _ . -

. ~ .

ll l Duke her Company flu R han l PO Box 3319f nce1 % ident l

  • CharVtre, N C 28242 Nuclear ProJxtion

(?O4)373 till DUKEPOWER l

October 6, 1988 l

l l Document Control Desk j j U. S. Nuclear Regulatory Commission j j Washington, D. C. 20555 j

Subject:

Catawba Nuclear Station, Units 1 and 2 7

Docket Nos. 50-413 and 50-414

Technical Specification Amendment  !

' Nuclear Service Water System Actuation Logic i i

Dear Sir:

j This letter is in response to the August 12, 1988 letter from Mr. D. B. Matthews, d

NRC/NRR, which denied a Technical Specification amendment request submitted on [

j August 9, 1988. Attached is a revision to the previous proposed amendment to the

, Technical Specifications for Facility Operating License Nos. NPF-35 and NPF-52 f; 1 for Catawba Units 1 and 2. The request involves changing Technical Specification i Table 3.3-3 to reflect a proposed change in the actuation logic for the Nuclear

Service Water System. This modification is now currently scheduled to be 1 implemented in January, 1989.

I i It is also requested that the Technical Specification amendment allow a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> i

! waiver of compliance (per pit) with the Nuclear Service Water Action Statement  !

j requirements to allow for the implementation of this modification. Per the {

4 August 12, 1988 denial letter, the discussion now addresses the safety

! significance of allowing a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> waiver of compliance with the Action j St .etement . i t t j The attachment contains the proposed change and a discussion of the justification l and a No Significant liazards Analysis. The analysis is included pursuant to 10 l 1 CFR 50.91 and it has been concluded that the propnsed amendment does not involve  !

j significant hazards considerations.  ;

4 i This proposal involves a previously submitted amendment request to Catawba's

! Technical Specifications. Tharefore, no additional license fees are required. l

+

l

) Pursuant to 10 CFR 50.91 (b) (1) the appropriate South Carolina State Official is f 1 being provided a copy of this amendment request.

l f

{ Very truly yours l

I

, I 4

j llal B. Tucker t l

1 pt Ew0/35/les Attachnents go17g p

A 3 5i 8

l l

l l

1 i

U. S. Nuclear Regulatory Commission l October 6, 1988 l Page Two

(

xc: Dr. J. Nelson Grace, Regional Administrator U. S. Nucicar Regulatory Commission l

Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Heyward Shealy, Chief Bureau of Radiological Health l

South Carolina Department of Health &

l Environmental Control l

2600 Bull Street Columbia, South Carolina 29201 American Nuclear Insurers c/o Dottie Sherman, ANI Library .

The Exchange, Suite 245 270 Farmington Avenue Farmington, CT 06032 M&M Nuclear Consultants 1221 Avenue of the Americas New York, New York 10020 INPO Records Center Suite 1500 1100 Circic 75 Parkway Atlanca, Georgia 30339 1

Mr. W. T. Orders '

( NBC Resident Inspector j Catawba Nuclear Station '

)

I

l 4

4 Attachment 1 l Proposed Technical Specification Changes a

i!

3 J

l 1

4 l

1 i

)

l 1 1 I l I -

j t

, I l

)

4 1

a t

r I

I 1

i  !

)

]

1 J

4 4

)

I 1

I j

1 1

s i

l

.t 1

,1 t

<