Responds to Denying Util 880812 Request to Revise Tech Spec 3.3-3 to Reflect Proposed Changes in Actuation Logic for NSSS Scheduled for Jan 1989.Justification for Change & No Significant Hazards Analysis Encl
ML20207L266
Person / Time
Site: Catawba  
Issue date: 10/06/1988
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20207L269 List:
References
NUDOCS 8810170264
Download: ML20207L266 (3)


Text

.-

ll l

~

Duke her Company flu R han PO Box 3319f nce1 % ident CharVtre, N C 28242 Nuclear ProJxtion

(?O4)373 till DUKEPOWER l

October 6, 1988 l

l l

Document Control Desk j

j U. S. Nuclear Regulatory Commission j

Washington, D. C. 20555 j

j

Subject:

Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 7

Technical Specification Amendment Nuclear Service Water System Actuation Logic i

i

Dear Sir:

j This letter is in response to the August 12, 1988 letter from Mr. D. B. Matthews, NRC/NRR, which denied a Technical Specification amendment request submitted on

[

d j

August 9, 1988. Attached is a revision to the previous proposed amendment to the Technical Specifications for Facility Operating License Nos. NPF-35 and NPF-52 f

1 for Catawba Units 1 and 2.

The request involves changing Technical Specification Table 3.3-3 to reflect a proposed change in the actuation logic for the Nuclear i

Service Water System. This modification is now currently scheduled to be 1

implemented in January, 1989.

I i

i It is also requested that the Technical Specification amendment allow a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> waiver of compliance (per pit) with the Nuclear Service Water Action Statement j

requirements to allow for the implementation of this modification.

Per the

{

4 August 12, 1988 denial letter, the discussion now addresses the safety significance of allowing a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> waiver of compliance with the Action j

St.etement.

i t

t j

The attachment contains the proposed change and a discussion of the justification l

and a No Significant liazards Analysis. The analysis is included pursuant to 10 l

1 CFR 50.91 and it has been concluded that the propnsed amendment does not involve j

significant hazards considerations.

4 This proposal involves a previously submitted amendment request to Catawba's i

Technical Specifications. Tharefore, no additional license fees are required.

l

+

l

)

Pursuant to 10 CFR 50.91 (b) (1) the appropriate South Carolina State Official is f

being provided a copy of this amendment request.

l f

1

{

Very truly yours l

I 4

j llal B. Tucker t

1 pt l

Ew0/35/les go17g 5i A

3 8 l Attachnents p

1 i

U. S. Nuclear Regulatory Commission l

October 6, 1988 l

Page Two

(

xc:

Dr. J. Nelson Grace, Regional Administrator U. S. Nucicar Regulatory Commission l

Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Heyward Shealy, Chief Bureau of Radiological Health l

South Carolina Department of Health &

l Environmental Control l

2600 Bull Street Columbia, South Carolina 29201 American Nuclear Insurers c/o Dottie Sherman, ANI Library The Exchange, Suite 245 270 Farmington Avenue Farmington, CT 06032 M&M Nuclear Consultants 1221 Avenue of the Americas New York, New York 10020 INPO Records Center Suite 1500 1100 Circic 75 Parkway Atlanca, Georgia 30339 1

Mr. W. T. Orders

(

NBC Resident Inspector j

Catawba Nuclear Station

)

I

l 4

4 l

Proposed Technical Specification Changes a

i!

3 J

l 1

4 l

1 i

)

1 1

l I

I j

t I

l

)

4 1

a t

r I

1 I

i

)

]

1 J

4 4

)

I j

1 I

1 1

s i

.t 1

,1 t

<