ML20207K799

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/88-20 on 880801-0910 & Notice of Violation
ML20207K799
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 10/06/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20207K801 List:
References
NUDOCS 8810170027
Download: ML20207K799 (2)


See also: IR 05000267/1988020

Text

.

'

.

. .

OCT

61999

-

'In Reply Refer To:

Docket:

50-267/88-20

Public Service Company of Colorado

ATTN:

Robert O. Williams, Jr.

Vice President, Nuclear Operations

2420 West 26th Avenue, Suite 15c

Denver, Colorado

80211

Gentlemen:

This refers to the inspection conducted by Messrs. R. E. Farrell and P. W.

Michaud of this office during the period August 1-September 10, 1988, of

activities authorized by NRC Operating License DPR-34 for Fort St. Vrain

Nuclear Generating Station, and to the discussion of our findings with you and

other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included licensee action on previously

identified inspection findings, operational safety verification, licensee

event report review, monthly maintenance observations, monthly surveillance

observations, engineered safety feature walkdown, radiological protection, and

monthly security observations. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspectors.

The inspection findings

are documented in the anclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC recuirements.

Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Your response sFould be based on the specifics contained in tha

Notice of Violation enclosed with this letter.

l

The response directed by this letter and the accompanying Notice is not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

h

hY

RIV: SRI

RI M

PE:FSV

PS/B 7

D

M

dREFarrell/ncfPWHichaud

RPMullikin

TFWesterman

allan

f 08/20/SS

Ok'2tVy^8

q / /88

[hf/88

W/) /88

21

81/2f/ft

ot hilPt

ih

p M 88E $ 7

E

-

-

__ _

_- ___-

'

.

. .

.

Public Service Company of Colorado

-2-

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

L. J. Callan, Director

Division of Reactor Project

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-267/88-20

cc w/ enclosures:

C. Fuller, Manager

Nuclear Production Division

Fort St. Vrain Nuclear Generating Station

16805 WCR 19 1/2

Platteville, Colorado 80651

P. Tomlinson, Manager

Quality Assurance Division

Fort St. Vrain Nuclear Generating Station

16805 WCR 19 1/2

Plattesille, Colorado 50651

Colorado Radiation Control Program Director

Colorado Public Utilities Commission

bec to DMB (IE01)

bec distrib. by RIV:

  • DRP

R. D. Martin, RA

i

  • RRI

G. F. Sandborn, EC

  • SectionChief(DRP/B)

Lisa Shea, FE/ALF

  • RPSB-DRSS
  • RlY File
  • RSTS OPERATOR
  • Project Engineer DRP/B
  • MIS System
  • K. Heitner,

A Project Manager

  • DRS
  • w/766

..