P&YaA
. * ,
,
,
DEC 2 21986
Docket Nos. 50-321, 50-366
9eorgia Power Company
VATTN:
Mr. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NOS. 50-321/86-36 AND 50-366/86-36)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
P. Holmes-Ray on October 18 - November 21, 1986.
The inspection included a
review of activities authorized for your Hatch facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities appeared to violat'e NRC
requirements. The violation, references to pertinent requirements, and elements
to be included in your response are described in the enclosed Notice of
Violation.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
ORIGINAL CIGNED BY
MGL L. BROWNLEE
8701080496 861222
DR
/4 DOCK 0500
1
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosures:
(See page 2)
I
t
TE01
.,. .,
.
3
.,
Georgia Power Company
2
DEC 2 21986
Enclosures:
1.
2.
NRC Inspection Report
,pc w/encls:
VJ. P. O'Reilly, Senior Vice President
/ Nuclear Operations
t/ . T. Beckham,.Vice President, Plant Hatch
H. C. Nix, Site Operations General
/ Manager
s/A. Fraser, Acting Site QA Supervisor
,~/L. Gucwa, Manager, Nuclear Safety
N
and Licensing
bec w/encis:
RC Resident. Inspector
ugh S. Jordan, Executive Secretary
. Document Control Desk
State of Georgia
RII
RII
$<
4*
Rrrbteau:er
FCantrell
12/g/86
12/ly86
/