Text
a
,
t
JUL 2 41986
In Reply Refer To:
Docket: 50-382/86-13
Louisiana Power & Light Company
ATTN:
G. W. Muench, Director
Nuclear Operations
317 Baronne Street
P. O. Box 60340
New Orleans, Louisiana 70160
Gentlemen:
This refers to the inspection conducted by Messrs. J. G. Luehman, H. F. Bundy,
and T. R. Staker of this office during the period June 1-30, 1986, of activities
authorized by NRC Operating License NPF-38 for Waterford Steam Electric Station,
Unit 3, and to the discussion of our findings with Mr. R. P. Barkhurst and other
members of your staff at the conclusion of the inspection.
Areas examined during the inspection included plant status, Licensee Event
Report (LER) followup, monthly surveillance, routine inspection, licensee
followup on previously identified items, monthly maintenance, potential generic
problems, license conditions, and IE Bulletins.
Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspectors. These
findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of Section 2.201
of the NRC's Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
The timely and accurate processing of station modifications at your facility has
been an identified concern for some time. The failure to update drawings and
procedures has already led to one group of events in which unplanned radiological
releases having minor environmental and radiation exposure consequences occurred.
The new example of a failure to properly update plant drawings discussed in the
attached NRC inspection report points toward inadequacies in the actions your
staff previously committed. to implementing in order to address the original NRC
concerns.
Efforts to upgrade the facility's station modification program must,
on a priority basis, address procedures and drawings that support recently
completed and future modifications.
Also, during this inspection, it was found that certain of your activities
appeared to deviate from a commitment made to the NRC. This item and reference
to the commitment is identified in the enclosed Notice of Deviation. You are
requested to respond to this deviation in writing. Your response should be
based on the specifics contained in the Notice of Deviation enclosed with this
letter.
d
RIV:RRI
N / RIV:RRI U f RP8/C
C:RPB/C
C:RPB
/p/ol
Constable
JGagli
o
JLuehman/rl 4TStaker7 /z3/86 [ diBundy
}'
7 /z3/86
7 / n/86
7/D
7 /23/86
8607290141 860724
i
ADOCK0500g2
- - - -
e
.
4
Louisiana Power & Light Company
-2-
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 7 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
iOriginal Signed by
U, E. GAGLIARDO't
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
Appendix A - Notice of Violation
Appendix B - Notice of Deviation
Appendix C - NRC Inspection Report
50-382/86-13
cc w/ enclosures:
Louisiana Power & Light Company
ATTN:
R. P. Barkhurst, Plant fianager
P. O. Box B
Killona, Louisiana 70066
Louisiana Power & Light Company
ATTN:
G. E. Wuller, Onsite
Licensing Coordinator
P. O. Box B
Killona, Louisiana 70066
.
cc:
Middle South Services
ATTil: fir. R. T. Lally
P. O. Box 6100
New Orleans, Louisiana 70161
Louisiana Power & Light Company
ATTN:
K. W. Cook, fluclear Support
and Licensing Manager
317 Baronne Street
P. O. Box 60340
fiew Orleans, Louisiana 70160
Louisiana Radiation Control Program Director
bec:
(seenextpage)
.
k
Louisiana Power & Light Company
-3-
bec to DMB (IE01)
bec' distrib. by RIV
- RPB
RSB
'* Resident Inspector
R. D. Martin, RA
. Section Chief (RPB/C)
-DRSP
- EP&RPB ~
~
- RIV File
- MIS System
- RSTS Operator
D. Crutchfield, NRR
- H.
Bundy
D. Powers
- 766'
4
l
l
t
m
.
.
.
.
. .
.