Forwards Insp Rept 50-382/86-13 on 860601-30 & Notices of Violation & Deviation.Efforts to Upgrade Station Mod Program,To Address Procedures & Drawings,Must Be Done on Priority Basis
ML20207J476
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/24/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Muench G
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20207J480 List:
References
NUDOCS 8607290141
Download: ML20207J476 (3)


See also: IR 05000382/1986013

Text

a

,

t

JUL 2 41986

In Reply Refer To:

Docket: 50-382/86-13

Louisiana Power & Light Company

ATTN:

G. W. Muench, Director

Nuclear Operations

317 Baronne Street

P. O. Box 60340

New Orleans, Louisiana 70160

Gentlemen:

This refers to the inspection conducted by Messrs. J. G. Luehman, H. F. Bundy,

and T. R. Staker of this office during the period June 1-30, 1986, of activities

authorized by NRC Operating License NPF-38 for Waterford Steam Electric Station,

Unit 3, and to the discussion of our findings with Mr. R. P. Barkhurst and other

members of your staff at the conclusion of the inspection.

Areas examined during the inspection included plant status, Licensee Event

Report (LER) followup, monthly surveillance, routine inspection, licensee

followup on previously identified items, monthly maintenance, potential generic

problems, license conditions, and IE Bulletins.

Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspectors. These

findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of Section 2.201

of the NRC's Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Your response should be based on the specifics contained in the Notice of

Violation enclosed with this letter.

The timely and accurate processing of station modifications at your facility has

been an identified concern for some time. The failure to update drawings and

procedures has already led to one group of events in which unplanned radiological

releases having minor environmental and radiation exposure consequences occurred.

The new example of a failure to properly update plant drawings discussed in the

attached NRC inspection report points toward inadequacies in the actions your

staff previously committed. to implementing in order to address the original NRC

concerns.

Efforts to upgrade the facility's station modification program must,

on a priority basis, address procedures and drawings that support recently

completed and future modifications.

Also, during this inspection, it was found that certain of your activities

appeared to deviate from a commitment made to the NRC. This item and reference

to the commitment is identified in the enclosed Notice of Deviation. You are

requested to respond to this deviation in writing. Your response should be

based on the specifics contained in the Notice of Deviation enclosed with this

letter.

d

RIV:RRI

N / RIV:RRI U f RP8/C

C:RPB/C

C:RPB

/p/ol

Constable

JGagli

o

JLuehman/rl 4TStaker7 /z3/86 [ diBundy

}'

7 /z3/86

7 / n/86

7/D

7 /23/86

8607290141 860724

i

ADOCK0500g2

PDR

- - - -

e

.

4

Louisiana Power & Light Company

-2-

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 7 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

iOriginal Signed by

U, E. GAGLIARDO't

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures:

Appendix A - Notice of Violation

Appendix B - Notice of Deviation

Appendix C - NRC Inspection Report

50-382/86-13

cc w/ enclosures:

Louisiana Power & Light Company

ATTN:

R. P. Barkhurst, Plant fianager

P. O. Box B

Killona, Louisiana 70066

Louisiana Power & Light Company

ATTN:

G. E. Wuller, Onsite

Licensing Coordinator

P. O. Box B

Killona, Louisiana 70066

.

cc:

Middle South Services

ATTil: fir. R. T. Lally

P. O. Box 6100

New Orleans, Louisiana 70161

Louisiana Power & Light Company

ATTN:

K. W. Cook, fluclear Support

and Licensing Manager

317 Baronne Street

P. O. Box 60340

fiew Orleans, Louisiana 70160

Louisiana Radiation Control Program Director

bec:

(seenextpage)

.

k

Louisiana Power & Light Company

-3-

bec to DMB (IE01)

bec' distrib. by RIV

  • RPB

RSB

'* Resident Inspector

R. D. Martin, RA

. Section Chief (RPB/C)

-DRSP

  • EP&RPB ~

~

  • RIV File
  • MIS System
  • RSTS Operator

D. Crutchfield, NRR

  • H.

Bundy

D. Powers

  • 766'

4

l

l

t

m

.

.

.

.

. .

.