ML20207G740

From kanterella
Jump to navigation Jump to search

Amend 95 to License NPF-5,changing Wording of Action Statement a.4 of Tech Spec 3.7.1.2 to State Provision of Tech Spec 3.0.4 Not Applicable to Standby Svc Water Sys
ML20207G740
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/18/1988
From: Matthews D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20207G744 List:
References
NFP-05-A-095, NFP-5-A-95, TAC-64562, NUDOCS 8808240219
Download: ML20207G740 (4)


Text

  1. $'
  • lo,,

UNITED $TATES NUCLE AR REGULATORY COMMISSION g

5 t

WASHINGTON, D, C. 20555

%.....)

GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTH0 PITY OF GEORGIA CITY OF DALTON, GEORGIA 2

DOCKET NO. 50-366 EDWIN I. HATCH NUCLEAR PLANT _ UNIT _NO. 2 2_

AMENDHENT TO FACllITY OPERATING LICENSE Amendment No.

95 License No. NPF-5 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment to the Edwin 1. Hatch Nuclear Plant, Unit 2 (the facility) Facility Operating License No NPF-5 filed by Georgia Power Company, acting for itself, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia, (the licensee) dated January 27, 1987, complies with the standards and requitements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the i

provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendmnt will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

)

6808240219 000018 PDR ADOCK 05000366 O

PNV

r 2.

Accordingly, the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-5 is hereby amended to read as follows:

(2)_ Technical Sg cifications The Technical Specifications contained in. Appendices A and B, as revised through Amendment No. 95, are hereby incorporated in the license.

The itcantu shall operate the facility in accordance with the Technical Specifications.

3.-

This license amendxit is ef%tive as of its date of issuance and shall be implemented wit?'r 4 6ays cf issuance, FOR THE NUCLEAR REGULATORY COHHISSION l

Original Signed By:

Dav'd B. Matthews, Director Project Directorate 11-3 i

Division of Reactor Projects-l/IT

Attachment:

Changes to the lechnical Specifications i-Date of issuance:

August 18, 1988

)

i l

l 1

l 0FFICIALRECORDCOPYcPtg:1-3 LA; if-3 SB OGCcw e 011-3 AD/0R /II H

LCrocker:pw traig DNatthews Gla as i

/88 S/9/88

$G 88

/6h88 y/g/88

/88

ATTACHMENT TO LICENSE AMENDMENT NO. 95 FACILITY _0PERATING LICENSE NO. NPF-5 00CKET NO. 50-366 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.

The revised page is identified by amendment number and contains a vertical line indicating the area of change.

Remove Page insert Page 3/47-4 3r

  • 7-4 e

,.,.n-,..,

.,v,,-..

-,,- -.., - +

r,.,-_.

_.., -,e-

PLANT SYSTEMS LIIIITING CONDITION FOR OPERATION (Continued)

ACTION (Conti.1ued) 4 With tne standby

  • Service water subsystem inoperable, operation may continue and-the provisions of Specification 3.0.4 are not applicable; restore the subsystem to operable status within 60 days and provide Hatch

. Unit.1 service water cooling to the 18 Diesel generator by verifying OPERABILITY of the Hatch -

Unit 1 service water cooling source per Hatch Unit 1 technical specifications within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

Otherwise, declare the 18 diesel generator inoperable and take the ACTION required by Specification 3.8.1.1.

5.

With water level less than specified in 3.7.1.2.a or 3.7.1.2.b, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUT 00VN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, b.

In CONDITION 4 or 5:

1.

With up to three plant service water pumps or one plant service water loop inoperable, or 2.

With two plant service water pumps and the standby service water subsystem inoperable, restore both plant service water loops with at least one pump in each loop and the standby service water subsystem to OPERABLE status within 7 days or declare the core spray system, the LPCI system and the associated diesel generators ir. operable and take the ACTION required by Specifications 3.5.3.1, 3.5.3.2 and 3.8.1.2.

Sl!RVEILLANCE REQUIREMENTS 4.7.1.2 The plant service water syst)m and the standby service water subsystem shall be demonstrated OPERABLE:

By verifying that the water level in the pump well of the intake a.

structure is greater than or equal to 60.7 feet MSL** and the river level

  • would correspond to a level in the pump well of the intake structure of greater than or equal to 60.7 feet.

~

1.

At least once per 14 days when the level in the pump well af the intake structure is above 61.7 feet MSL, and 2.

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the level in the pumt well of the intake structure is less than or equal to 61.7 feet MSL.

"Only pump well monitoring is required if a temporary weir is not in place.

    • Note the throttling requirements of Specification 3.7.1.2.a.2 HATCH - UNIT 2 3/4 7-4 Amendment No. 95

. _ _ _