ML20207F583

From kanterella
Jump to navigation Jump to search
Forwards App to SALP Rept 50-483/86-02 for June 1985 - May 1986,correcting Rept Based on 860924 Meeting & Util 861024 Comments
ML20207F583
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/31/1986
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20207F586 List:
References
NUDOCS 8701060142
Download: ML20207F583 (2)


See also: IR 05000483/1986002

Text

P

i-

pb

..

.DEC a 1988

Docket No. 50-483

Union Electric Company

ATTN: Mr. Donald F. Schnell

Vice President - Nuclear

Post Office Box 149 - Mail Code 400

St. Louis, M0 63166

Gentlemen:

This refers to the NRC's Systematic Assessment of Licensee Performance (SALP)

6 Board Report for the Callaway Plant, our meeting of September 24, 1986,

which discussed the contents of the report, and your written comments dated

October 24, 1986, relative to the report.

We have thoroughly reviewed and evaluated the context of your comments and have

reached the conclusions presented in the Appendix to this letter.

Based on our in-depth discussions during the meeting on September 24, 1986,

and further reiterated in your letter of response, certain portions of the

SALP Bond Report have been modified as described in the attached Errata

Sheet. Corrected page(s) are included herein to update your copy of the SALP

Board Report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter with the

referenced attachments, will be placed in the NRC's Public Document Room.

No reply to this letter is required; however, should you have questions on

the basis of conclusions reached by NRC, or if you need clarification on the

changes made to the SALP Report, please let us know and we will be pleased

to discuss them with you.

Sincerely,

8701060142 861231 T'

PDR "

O ADOCK 05000483 '*

.- n. h.

PDR

James G. Keppler

Regional Administrator

Attachments:

1. Appendix to SALP 6 Board

Report No. 50-483/86002 d/

2. Errata Sheet

3. Corrected Page(s) to SALP Report

[i

4. Licensee response ltr dtd 10/24/86 g/ 5'rg/p

See Attached Distribution ' t

R I RI RIII RIII

eys

Forney/Jp

wo

Warnick

RI @II m

//.22E.

2)y >

JMcCormick-Barger K 1r W.

N6Felgs

I2ls:(s s 'V9l% iA/arlcc *h' ' ' Y

-

.

..

Union Electric Company 2 DEU 311986

Distribution

cc w/ attachments:

A. P. Neuhalfen, Manager Quality

Assurance

S. E. Miltenberger, General Manager,

Nuclear Operations

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Resident Inspector, Wolf Creek

K. Drey

Chris R. Rogers, P.E.

Utility Division, Missouri

Public Service Commission

SNUPPS

J. M. Taylor, Director, IE

H. R. Denton, NRR

Regional Administrators

RI, RII, RIV, RV

L. W. Zech, Chairman

- J. K. Asselstine, Commissioner

F. M. Bernthal, Commissioner

T. M. Roberts, Commissioner

K. M. Carr, Commissioner

NRR Project Manager

NRR Division Director

J. A. Axelrad, IE

M. Johnson, IE SALP Coordinator

RIII PRR

Rill SGA~

State Liaison Officer, State

of. Illinois

INP0

!

I

- - _ . _ , _ . . . . , . _ _ _ _ _ . . _ . _ . . _ _ . _ . . - - _ . _ _

.