ML20207E942
| ML20207E942 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 12/22/1986 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | Muller D Office of Nuclear Reactor Regulation |
| References | |
| GL-83-08, GL-83-28, GL-83-8, GL-84-15, SL-1725, NUDOCS 8701050233 | |
| Download: ML20207E942 (4) | |
Text
Georgia Fow!r Company 333 Piedmont Avenue Atlanta, Georgia 30308 Telephone 404 526-6526 Maihng Address:
F%t Office Box 4545 Atlanta. Georgia 30302 Georgia Power L. T. Gucws the souttwn electnc systern Manager Nuclear Safety and Licensing SL-1725 0411C December 22, 1986 Director of Nuclear Reactor Regulation Attention: Mr. D. Muller, Project Director BWR Project Directorate No. 2 Division of Boiling Water Reactor Licensing U. S. Nuclear Regulatory Comission Washington, D. C.
20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 OUTSTANDING SUBMITTALS LIST
- Gentlemen:
Enclosed please find an updated listing of those items of The correspondence with the NRC to which a written response is expected.
enclosure is tabulated chronologically by Georgia Power Company's Georgid Power is prepared to discuss modifications to submittal date.
this status report and will promptly address any questions you might have regarding these licensing issues.
recent NRC Georgia Power Company acknowledges and appreciates the efforts to complete licensing action on our submittals related to:
Recirculation Pump Trip Technical Specifications, Analog Trip Transmitter System Technical Specifications, PCIS Technical Specifications, and Fire Protection Technical Specifications.
If you have further questions, please contact this office at any time.
Sincerely, 8701050233 861222 a
PDR ADOCK 05000321 L. T. Gucwa P
PDR MJBlackwood/lc Enclosure c: Geor{ia Power Company Nuclear Regulatory Commission Dr. J. N. Grace, Regional Administrator Mr. i. P. O'Reilly Mr. J. T. Beckham, Jr.
Mr. P. Holmes-Ray, Senior Resident
- l Mr. H. C. Nix, Jr.
Inspector - Hatch 0
GO-NORMS o
Pcga No.
1 12/13/06 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC ENCLOSURE TO SL-1725 LETTER UNIT SUBJECT DATE O APPROVAL OF ITEM REQUIRED FOR UPCOMING OUTASE C NRC ACTION COMPLETE ON ITEM SINCE LAST REPORT N ITEM ADDED CINCE LAST REPORT 10/03/78 321 PROPOSED TECHNICAL SPECIFICATIONS - CHANGE PSW. DIESEL REOUIREMENTS TO REFLECT SWING STATUS OF D/G 1B 09/12/84 321 PROPOSED TECHNICAL SPECIFICATIONS - OPERABILITY DEFINITION 01/10/85 366 REQUEST TO RESCIND CONFIRMATORY ORDER ON REACTOR COOLANT SYSTEM STAINLESS STEEL PIPE 05/13/03 321.366 REQUEST FCR ADDITIONAL INFORMATION - SEISMIC SPECTRA BROADENING 06/03/05 321,366 REOUEST FOR ADDITIONAL INFORMATION GENERIC LETTER 83 SALEM EVENT - SCRAM BREAKER FAILURE 06/2G/85 321,366 PROPOSED CHANGES TO INSERVICE TESTING PROGRAM 01/06/86 366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - DELETE REOUIREMENT FOR HYDROGEN RECOMBINERS 01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - 45 SECONDS ON SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVE CLOSURE TIME 01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - SHIFT OVERTIME REQUIREMENTS 01/07/06 321,066 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - AUTOMATIC ISOLATION OF PURGE AND YENT ON HIGH RADIATION SIGNAL 02/17/06 321,3i6 PROPOSED CHANGE TO TECHNICAL GFECIFICATIONS - REORGANIZATION
- RESPONSIDILITY FOR 9ADIOLOGICAL ENVIRONMENTAL MONITORING.
ENVIRONMENTAL, TECHNICAL SPECIFICATIONS, MET TOWER LOCATION, QA RECORDS. DELETE EoDD. ETS PROCEDURE APPROVAL 02/2G/96 321.366 PROPOSED LICENSE EXTENSION TO 40 YEARS FROM OPERATING LICENSE VICE CONSTRUCTION PERMIT 03/13/06 321,066 REQUEST FOR ADDITIONAL INFORMATION - MODIFICATION OF VACUUM BREAKERS ON MARK 1 CONTAINMENTS - GENERIC LETTER 83--08 03/27/06 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - EOUALIZING REACTOR PROTECTION SYSTEM SPECIFICATIONS BETWEEN UNITS
Prge No.
2 12/13/06 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC ENCLOSURE TO SL-1725 LETTER UNIT SUBJECT DATE 03/31/86 321,366 PROPOSED CHANGES TO TECHNICAL SFECIFICATIONS - EMERGENCY POWER - DIESEL GENERATOR TESTING - GENERIC LETTER 84-15 04/04/G6 366 PROPOSED DELETION OF BUILDING SETTLEMENT TECHNICAL SPECIFICATIONS WITH INCCRFORATION OF SETTLEMENT CRITERIA FROM OUR 12/1/79 LETTER INTO FLANT PROCEEUPES 05/16/86 321,366 PROPOSED TECHNICAL SPECIFICATIONS - PLANT REVIEW EOARD AND SAFETY REVIEW BOARD COMPOSITION AND OUORUM, AUDIT REQUIREMENTS, MANAGEMENT REF'ORTING RELATIONSHIPS 05/16/G6 321,366 EXEMPTION REQUESTS - AFFENDIX R 06/20/86 321,366 CHANGE TO TECHNICAL SPECIFICATIONS - SINGLE LOOP OPERATION AND JET PUMP SURVEILLANCE 07/10/96 366 C PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - ANTICIPATED TRANSIENT WITHOUT GCRAM RECIRCULATION FUMP TRIP 07/18/S6 366 C TECHNICAL SPECIFICATIONS FOR ANALOG TRANOMITTER TRIP SYSTEM 07/10/G6 366 C REVISION TO PCIS TABLE TECHNICAL SPECIFICATION 07/25/06 321.366 C CHANOE TO TECHNICAL SPECIFICATIONS - DELETION OF FIRE FROTECTION TECHNICAL SFECIFICATIONS AND LICENSE CONDITIONS DUE TC INCORPORATION IN FIRE HAZARDS ANALYSIS 07/20/06 366 FRACTURE MECHANICS ANALYSIS OF FEEDWATER NOZZLES - REQUEST FOR SCHEDULE FOR REPLACCNENT OF CONTROLLER OR NEW ANALYSES 00/19/06 366 CHANGE TO TECHNICAL SPECIFICATION - BATTERY LEVEL FROFILE 00/21/G6 321,366 GENERIC LETTER 83 CALEM ATW3 ITEMS 3.1.1.
Z.1.2, 3.2.1, 3.2.2, 4.3.1 00/25/86 321,366 CHANGE TO RWCU LEAKAGE DETECTION TECHNICAL SPECIFICATIONS 09/09/06 ~,21,366 CHANGE TO TECHNICAL SFECIFICATIONE -- RIVER LEVEL.
09/09/G6 321 PROPOSED TECHNICAL GFECIFICATION CHANGE - REFUELING INTERLOCK SURVEILLANCE 10/24/S6 321,366 FROPOSED TECHNICAL SPECIFICATION CHANGE FOR FIRE FROTECTION COMFLIANCE - ADD REQUIREMENT OF FERFORMING EVEFY THIRD TEST OF EQUIPMENT CON' TROLLED FROM REMOTE SHUTDOWN PANELT FROM SAID PANELS idh
?w
- g. -
Pcga No.
3 12/13/06 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC ENCLOSURE TO SL-1725 LETTER UNIT SUBJECT DATE 10/27/86 321,366 PROPOSED REVISION TO TECHNICAL SPECIFICATIONS - DELET. TON OF ORGANIZATIONAL FIGURES, REALIGNMENT OF HNP STRUCTURE 11/06/86 321 N RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION - COMMENTS REGARDING IGSCC INSPECTION AND REPAIR - UT SUBCONTRACTORS 11/10/96 321,366 N PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - CONTROL ROOM PRESSURIZATION INSTRUMENTATION 11/14/86 321 N INSERVICE INSPECTION RELIEF REQUEST TO CLOSE OUT FIRST 10 YEAR ISI INTERVAL - DUE DY 12/31 11/14/86 321,366 N RESPONSE TO VERBAL REQUEST FOR ADDIT,IONAL INFORMATION -
CABLE TRAY SUPPORTS 11/20/86 321,366 N PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - SNUBBER OPERABILITY I