Forwards SER Accepting Util 831214 Submittal of Basis for Continued Plant Operation W/Permanent Removal of Thermal Sleeves from RCS Nozzles
ML20207E748
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 12/30/1986
From: Hood D
Office of Nuclear Reactor Regulation
To: Tucker H
DUKE POWER CO.
Shared Package
ML20207E753 List:
References
NUDOCS 8701050014
Download: ML20207E748 (2)


Text

_

~

~Becket Nos'.: 50-369' and 50-370

~ Mr. H. B. Tucker, Vice President DEC 3 01986 Nuclear Production Department Duke Power Company 422 South Church Street Charlotte, North Carolina 2824?

Dear Mr. Tucker:

Subject:

-Reactor Coolant System Thermal Sleeves - McGuire Nuclear Station, Units-1 and 2 Beginning in mid-1982, loose reactor coolant system thermal sleeves or sleeves with cracked attachment welds were found in several operating Westinghouse plants including the McGuire Station. By your letter of December 14, 1983, 1

evaluations by you and Westinghouse provided a basis for the continued oper-ation of !!cGuire Units 1 and 2 without thermal sleeves installed in the reactor coolant system nozzles. The staff has completed review of these evaluations.

A copy of our safety evaluation is enclosed.

As noted in the enclosure, we conclude that it is acceptable for McGuire Units 1 and 2 to operate with the reactor coolant systen thermal sleeves permanently removed. Our acceptance reccgnizes that the McGuire Station Technical Speci-fication 3/4 3.5.2 requires reporting of ECCS.actuations and injections, and

~

the usage factor of each nozzle whenever its value exceeds 0.70.

This action completes Operating License NPF-17 (linit 2) condition 2.C(4),

Thennal Sleeves.

Sincerely, N I SOcck 50$0069 -

6N Darl Hood, Project Manager P

PDR PWR Project Directorate #4 Division of Pl!R Licensing-A

Enclosure:

Safety Evaluation Report cc: See next page istribu'tfon:

cket y BJYoungblood Shou nnC FDn ACRS (10)

GBagchi Local PDR OGC-Bethesda RBall6rd PRC System JPartlow PWR#4 Rdg BGrires MDuncan EJordan DHood NThompson f

D.htf 1

PWR#4/DPWR-A PWR#

LlR-A PWR N 'R-A

<$ cod DHood/mac iTo BJY l

12/ g /86 12/fl/86 12/p 26 s

O t

't

.I s

' F r. h. B. lucker J'

/

Duke Power Conpany licGuire Nuclear Station i

CC:

5 Mr. A.V. Carr, Esq.

Dr. John M. Barry Duke Power Con;pany Department of Environmental Health P. O. Box 33189 Mecklehburg County 422 South Church Street 1200 Blythe Boulevard Charlotte, North Carolina 28242 Charlotte, North Carolina 28203 s

\\

County Manager of Mecklenburg County i

720 East Fourth Street Charlotte, North Carolina 28202 Chairman, North Carolina Utilities Commission Mr.. Robert Gill Dobbs Building

'i Duke Power Company 430 North Salisbury Street Nuclear Production Department Raleigh, North Carolina 27602 P. O. Box 33189 Charlotte, North Carolina 28242 Mr. Dayne H. Brown, Chief Radiation Protection Branch J. Michael McGarry, III, Esq.

Division of Facility Services Bishop, Liberman, Cook, Purcell Cepartnent of Human Resources and Reynolds 701 Barbour Drive 1200 Seventeenth Street, N.W.

Raleigh, North Carolina 27603-2008 Washington, D. C.

20036 Senior P.esident Inspector c/o U.S. Nuclear Regulatory Commission Route 4, Box 529 Hunterville, North Carolina 28078 Regional Administrator, Region II U.S. Nuclear Regulatory Commission, 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 1

L. L. Williams Area Ibnager, Mid-South Area ESSD Projects Westinghouse Electric Corporation MNC West Tower - Bay 239 P. O. Box 355 Pittsburgh, Pennsylvania 15230 t