Forwards Insp Rept 50-443/86-30 on 860609-13.No Violations Noted.Items Requiring Corrective Actions Categorized in Paragraph 6,according to Whether Actions Must Be Completed Prior to Fuel Load or Full Power License
ML20207E687
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 07/16/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrison R
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20207E691 List:
References
NUDOCS 8607220400
Download: ML20207E687 (2)


See also: IR 05000443/1986030

Text

_

.

JUL 161986

Docket No. 50-443

Public Service of New Hampshire

ATTN: Mr. Robert J. Harrison

President and Chief Executive Officer

P. O. Box 330

Manchester, New Hampshire 03105

Gentlemen:

Subject:

Inspection Report No. 50-443/86-30

This report forwards the findings of the Emergency Plan Implementation

Appraisal followup, which was conducted June 9-13, 1986, by Mr. W. Lazarus and

others of this office at Seabrook Nuclear Power Station, Seabrook, New

Hampshire.

Areas examined during this inspection are described in the NRC Region I

Inspection Report enclosed with this letter.

The inspectors conducted selec-

tive examinations of procedures, representative records, facilities and

equipment, interviews with personnel, and observations of the inspectors.

Within the scope of this inspection, ao violations were identified and no

response to this letter is necessary.

Items requiring corrective actions are

categorized in Paragraph 6 of this report, as to whether they must be com-

pleted prior to fuel load or full-power license.

Your cooperation with us ~in this matter is appreciated.

Sincerely,

l

Oririnal SIE;M L'7:

k

a i

e

T

684f91sionofRadiationSafety

U

and Safeguards

Enclosure: NRC Region I Inspection Report No. 50-443/86-30

0FFICIAL RECORD COPY

,

8607220400 860716

{DR

ADOCK 05000443

PDR

Ihh

' I

- _ _ _ _

.

.

Public Sers e of New Hampshire

2

cc w/ enc 1:

John DeVincentis, Director, Engineering and Licensing

William B. Derrickson, Senior Vice President

Warren Hall, Operational Services Supervisor

Donald E. Moody, Station Manager - Seabrook Station

Gerald F. Mcdonald, Construction QA Manager

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire

bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

FEMA RI

K. Abraham, PA0

RI:DRSS

RI:DRS

RI:

S

'

Thomas /f

Lazar

Bellapy

Of'/ /8

06/

8

Oy/jf/86

7

sr,

'l

s'lW t//f

f

0FFICIAL RECORD COPY

IR 581 86-30 - 0002.0.0

06/27/86