Monthly Operating Rept for Mar 1987
ML20206R685
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/31/1987
From: Watson R, Westmoreland J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
HO-872010(O), NUDOCS 8704220216
Download: ML20206R685 (6)


Text

.

OPERATING DATA REPORT DOCKET NO. 050-400 DATE 4/6/87 COMPLETED BY J. H. WESTMORELAND TELEPHONE (919) 362-2597 OPERATING STATUS

1. Unit Name:

Shearon Harris Unit 1

2. Reporting Period: March 1987 Notes:
3. Licensed Thermal Power (MWt): 2775 Power Ascension Testing in
4. Nameplate Rating (Cross (MWe):

950 Progress.

5. Design Electrical Rating (Net-MWe): 900
6. Maximum Dependable Capacity (Gross-MWe): 950
7. Maximum Dependable Capacity (Net-MWe): 900
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Cive Reasons: N/A
9. Power Level To Which Restricted, If Any (Net-MWe): None
10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
11. Hours ~in Report Period 744 1706 1706
12. Number Of Hours Reactor Was Critical 331.27 1134.27 1134.27
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 265.35 943.35 943.35
15. Unit Reserve Shutdown Hours 0

0 0

' 16. Cross Thermal Energy Generated (MWH) 342663.66 997734.6 997734.6

17. Cross Electrical Energy Generated (HWH) 89933 242133 242133

- 18. Net Electrical Energy Generated (MWH) 63132 182018 182018

19. Unit Service Factor N/A N/A N/A
20. Unit Availability Factor N/A N/A N/A
21. Unit Capacity Factor (Using MDC Net)

N/A N/A N/A

22. Unit Capacity Factor (Using DER Net)

N/A N/A N/A

23. Unit Forced Outage Rate N/A N/A N/A
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 12/30/86 1/3/87 INITIAL ELECTRICITY 1/11/87 1/19/87 COMMERCIAL OPERATION 4/25/87 N/A 4

s 8704220216 870331 PDR ADOCK 05000400 MEM/DATAREPORT/1/OS2 f

,,,,,,,,e.

,v--r~,,-m

-w,--e v---~,,-,-,e------,,---o,,-----


m---

n, - - ~ ~, - - - -

~e-ww-v

-wv,

~

=

CPIL 00,-

PLANT PERFORMANCE DATA SYSTEM APPENDIX B - AVERACE DAILY POWER LEVEL HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY J. H. WESTMORELAND TELEPHONE (919) 362-2597 MWrch 1987 DAY AVC. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1

-33 17

-29 2

163 18

-23 3

329 19

-18

'4 335 20

-18 5

324 21

-18 6

264 22

-18 7

-31 23

-20 8

-29 24

-28 9

-35 25

-35 10 16 26

-38 11 168 27 242 12 139 28 309 13 214 29 358 14

-29 30 158 15

-29 31 74 16

-29 k

MEM/DATAREPORT/2/OS2 r,--

---,,..,,----,,,,--.n,

-_--,,.--nm,-e-,,--

,n,-,--

UNIT SHUTDOWNS Af0 POWER REDUCTION DOCXET NO.: 050-400 UNIT NAME: Harris i

DATE: 4/6/87 CODPLETED BY: -J. H. Westmoreland REPORT MONTH: March 1967 TELEPHONE: (919) 362-2597 i.

+ cn S No.

Date oy f

Licensee Cause & Corrective f

g Action to ej S

fee Event e

R j-

{"p Report #

y jg Prevent Recurrence e

a 87-008 3/6/87 S

87 B

5 N/A CH VALVES Unit was removed from grid to repair and test Aux.

Feedwater Check Valves due l

to leakage. Repairs and f

tests completed and unit was returned to service, i

87-009 3/11/87 F

14.57 B

3 87-12 HA INSTRU Turbine / Reactor Trip due to rotor position alarm validity testing. Test procedure was revised and unit was returned to service.

1 2

3 4

F: Forced Reason:

Method:

Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data 1

B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee j

C-Refueling 3-Automatic Scram.

Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5

l G-Operational Error (Explain)

Exhibit 1-Same Source H-Other (Explain)

MEM/DATAREPORT/OS2 l

l, '

I UNIT SHUTDOWNS AIO POWER REDUCTION DOCKET NO.: 050-400 i

UNIT NANE: Harris DATE: 4/6/87 CODFLETED BY:

J. H. Westmoreland-REPORT NONTH: March 1987 TELEPHONE: (919) 362-2597 i

b j

oft

+

No.

Date 8{

{j Licensee E

g ej k

+1e Event k

. Cause & Corrective i

Action to y

j-j I"j Report #

j j

Prevent Recurrence 87-010 3/13/87 F

318.75 A

2 87-013 HH VALVES Nanual Reactor Trip j

initiated due to approaching j

of steam flow / feed flow.

mismatch limit. Feedwater i

regulating valves for all 3

}

Steam Generators experienced oscillations from their controllers. The Controller Signal Gains were adjusted and unit returned to service.87-011 3/30/87 F

16.38 A

5 N/A HH PIPEXX Unit shutdown to repair flow

]

control valves drain piping and Install additional pipe supports to prevent any j

further pipe breaks i

l 1

2 3

4 F: Forced Reason:

Method:

i S: Scheduled A-Equipment Failure (Explain) 1-Manual ~

Exhibit G-Instructions for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee

  • l C-Refueling 3-Automatic Scram.

Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5

I G-Operational Error (Explain)

Exhibit 1-Same Source l

H-Other (Explain) 4 3

e MEM/DATAREPORT/OS2

. 1d

.q 9 '

5 UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.: 050-400 UNIT NAME: Harris DATE: 4/6/87.

COMPLETED BY:

J. H. Westmoreland REPORT MONTH: March 1987

' TELEPHONE: (919) 362-2597 L

oE No.

Date oj g {,E Licensee

[e,

Cause & Corrective

%j f2c Event R

Action to e

g E

y-E

I " j Report #

]>- [

jg Prevent Recurrence g

g 87-012 3/31/87 F

18.22 A

3 87-017 HA VALVES Reactor Trip due to steam flow / feed flow mismatch.

Feedwater Regulating Valves started oscillations which produced feedwater transients that in turn tripped feedwater pumps.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5

G-Operational Error (Explain)

Exhibit I-Same Source H-Other (Explain) 0 t

MEN /DATAREPORT/OS2

CD&L Carolina Power & Light Company HARRIS NUCLEAR PROJECT P. O. Box 165 New Hill, North Carolina 27562 APR 141987 File Number: SHF/10-15505 Letter Number: HO-872010 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, D.C.

20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO. 1 DOCKET No. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specifications 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of March 1987.

Yours very truly,

/

R. A. Watson Vice President Harris Nuclear Project MWH:kgo Enclosure cc:

Dr. J. Nelson Grace (NRC)

Messrs.

J. M. Taylor (NRC)

C. F. Maxwell (NRC-SHNPP)

R. C. Oehl (DOE)

[6N I l MEM/H0-8720100/ PACE 1/OS2 W.,

.n

,,_,.~,..--.--------e,


n-

-.-~~,~--,--+-n,.

-, - - -,