ML20206K107
| ML20206K107 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 11/18/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20206K110 | List: |
| References | |
| NUDOCS 8811290271 | |
| Download: ML20206K107 (2) | |
See also: IR 05000313/1988032
Text
-
-
- -
,
o
,
,
,
'
,
,
.
'
,
l'} - .
.I'
.
,
M i8'ses
~
'
,
L
In Rep'lyl Refer To:
Dockets:. 50-313/88-32:
'
50-368/88-32
Arkansas Power & Light Company
ATTN: Mr. Gene Campbell'
Vice. President, Nuclear
Operations
P. O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Messrs. W. D. Johnson and
R. C. Haag of this office during the period September 16 through October 23,
1988, of activities authorized by NRC Operating Licenses OPR-51 and NPF-6 for
Arkansas Nuclear One, Units.1 and 2, and to.the discussion of our findings with
Mr. S. M. Quennoz, and other members of your staff at-the conclusion of the
inspection.
Areas examined during the inspection included maintenance, surveillance,
operational. safety verification, followup on licensee event reports, and
followup of events.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the inspectors.
The findings are documented in the enclosed
inspection report.
4
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
h[-
N
(
'
[, ,
RIV:RI
' SRI
C:P5A
J:
i
BHaa
.WDJohnson
DDChamberlain
LJ0hJlan
Y/
11/l /88
11/jf/88
11//j /88
11/q/88
!
!
!
.
8911290271 001110
!
ADOCK 05000313
l
0
PNU
_
_ _ _ - _ _ _ _ _ _ - - - _ . . _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _
.
o.
,
Ar' kansas Power & Light Company
2-
-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Origin 31 S'ined By:
A.B. BEACH
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-313/88-32
4
50-368/88-32
cc w/ enclosures:
Arkansas Nuclear One
ATTN:
J. M. Levine, Director
Site Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RRI
Robert D. Martin, RA
RPSB-DRSS
- SectionChief(DRP/A)
- Lisa Shea, RM/ALF
- RIV File
- DRP
- MIS System
'
- RSTS Operator
- Project Engineer, DRP/A
- C. Harbuck, NRO Projec'; Manager (MS:
130-18)
- DRS
- w/766
,
- , - - - - - , , - . - - - - -
- - - - , ,
,,,_,,,,,,,w-
-
-