ML20206K006

From kanterella
Jump to navigation Jump to search

Forwards Rev 3 to Updated Probabilistic Seismic Hazard Analysis for Paducah Gaseous Diffusion Plant,Paducah,Ky, for NRC Approval.Without Encl
ML20206K006
Person / Time
Site: Paducah Gaseous Diffusion Plant
Issue date: 05/04/1999
From: Toelle S
UNITED STATES ENRICHMENT CORP. (USEC)
To: Paperiello C
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
GDP-99-0075, GDP-99-75, TAC-L32054, NUDOCS 9905130048
Download: ML20206K006 (2)


Text

j r

y i

1 s'

' y ;-

I;USEC A as.6. un.rer comp.ar.

May 4,1999 '

' ODP 99-0075 1

1 Dr. Carl J. Paperiello -

{

Director, Office of Nuclear Material Safety and Safeguards Attention: Document Control Desk i

United States Nuclear Regulatory Commission -

j Washington,'D.C. 20555-0001 Paducah Gaseous Diffusion Plant 4

Docket No. 70-7001

) Compliance Plan Issue 36 - Transmittal of Revision 3 of the Updated Seismic Hazard -

Analysis for NRC Approval (TAC No. L32054)

Dear Dr. Paperiello:

s The purpose of this letter is to transmit the following document for NRC approval:

" Updated Probabilistic Seismic Hazard Analysis for the Paducah Gaseous Diffusion Plant, Paducah, Kentucky" Final Report, (Revision 3), Risk Engineering, Inc., April 26,1999.

In a letter dated March 11,1999 (Reference 1), the NRC requested additional information to i

complete its review of the seismic hazard re-analysis performed by Risk Engineering, Inc. (REI) that was submitted to the NRC on September 18,1998 (Reference 2). The enclosed Revision 3 of the seismic risk analysis includes the previously submitted response (Reference 3) to NRC's October 21,1998 request for additional information (Reference 4) and completes USEC's response to the j

NRC's March 11,1999 questions.

.{

p 1

. Should you have further questions related to this subject, please contact me at (301) 564-3250.

There are no new commitments contained in this submittal.

Sincerely, 1

n S. A L' j

i Steven A. Toelle -

L p

Nuclear Regulatory Assurance and Policy Manager

.Q.

PDR ADOCK 070070014

- uoL0 1

!9905130048 990504' 7

L i

C PDR 1 16903 Rockledge Drive, Bethesda MD. 20817-1818 -

Telephone 301564-3200 Fax 301 $64-3201 http://www.usec.com :

0 g

Offices in Livermore, CA Paducah, KY.i Portsmouth, OH - Washington, DC ?

~

m A

a

%f f,

. Dr. Carl J. Paperiello lMaf 4,1999; f '

GDP 99-0075, Page 2 :

References:

1.

- Letter from Melanie Galloway (NRC) to Mr. James N.-.Adkins (USEC),,

"Paducah Gaseous Diffusion Plant: Seismic Hazard Analysis (TAC No.

L32054)," U.S. Nuclear; Regulatory Commission, Docket No.:70-7001;,

March 11,1999.'

Letter from Steven A. Toelle (USEC) to Dr. Carl J. Paphriello (NRC),-

2.

" Compliance Plan Issue 36 - Transmittal of Revision 2.of the Updated.

Seismic Risk Analysis for NRC Approval,". Letter No.- GDP 98-0197,

September 18,1998.

3.

Letter from' Steven A. Toelle (USEC) to Dr. Carl J. Paperiello (NRC),

j

~ " Compliance Plan Issue 36 - Response to NRC Request for Additional

- Information - Updated Seismic Hazard Analysis (TAC No. L32054)," Letter

- No.' GDP 98-0250, November 10,1998.

4.

Letter from Mr. Robert C. Pierson (NRC) to Steven A. Toelle (USEC),-

"Paducah Gaseous Diffusion Plant Seismic Hazard Analysis," U.S. Nuclear Regulatory Commission, Docket No. 70-7001, October 21,1998.

j

Enclosure:

" Updated Probabilistic Seismic Hazard Analysis for the Paducah Gaseous Diffusion Plant, Paducah, Kentucky" Final Report, (Revision 3), Risk Engineering, Inc.,

April 26,1999.

q cc:

Mr. Robert C. Pierson, NRC-HQ (w/o)

NRC Region 111 Office (w/o) i NRC Resident Inspector, PGDP (w/o)-

NRC Resident Inspector, PORTS (w/o)

Mr. Randall M. DeVault, DOE (w/o)

)

E

(

1

+

.4 l

k y

a r

t j

J

.c V.-

.,.,