APR 0 81987
Docket No.
50-219
License No. DPR-16
GPU Nuclear Corporation
ATTN: Mr. P. B. Fiedler
Vice President and Director
Oyster Creek Nuclear Generating Station
P. O. Box 388
Forked River, New Jersey 08731
Gentlemen:
Subject:
Inspection Report No. 50-219/87-04
This
refers to the
routine safety
inspection by Messrs.
W.
Bateman,
J. Wechselberger, and W.
Baunack during the period of January 16 through
March 8,1987 at the Oyster Creek Nuclear Generating Station.
The inspections
consisted of document reviews, interviews, and observations of activities as
documented in the enclosed inspection report. The findings were discussed with
you and other members .of your staff at the conclusion of the inspection.
Within the scope of this inspection, no violations were identified.
We acknowledge receipt of the December 19, 1986 response to Violation B cited
in the Notice of Violation (Appendix A) to Inspection Report 50-219/86-12.
In
the response it was stated the cause of the violation was identified as a con-
tractor at the Oyster Creek site performing incomplete work. As discussed in
the Enforcement Conference held September 12, 1986, it was the NRC's position
l
that, in addition to the contractor control problem, there was an equally
'
significant problem involving a failure of GPUN to assure the quality of the
work.
In the stated corrective action it appears this problem is recognized
and is being addressed. Your overall corrective actions will be verified in a
future NRC inspection.
Your cooperation with us in these matters is appreciate.i.
Sincerely,
Eigina1 Signed By:
~
Philip J. Polk, Acting Chief
Projects Branch No. 1
Division of Reactor Projects
Enclosure: NRC Region I Report No. 50-219/87-04
8704140329 870408
ADOCK 05000219
G
AL RECORD COPY
IR OYC 87-04 - 0001.0.0
1 \\
04/01/87
j 0l
. -
. - _ -
_
-
. _ _ - _ _ . __
-- ___-----_
l
,
,
u
, g
GPU Nuclear Corporation
2
03 199
cc w/ encl:
BWR Licensing Manager
Licensing Manager, Oyster Creek
Public Document Room (PDR)
>
local Public Document Room (LPDR)
l
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
]
State of New Jersey
i
bec w/ encl:
!
Region I Docket Room (with concurrences)
!
Management Assistant, DRMA (w/o encis)
DRP Section Chief
DR3 Director
i
DRSS Director
j
PA0 (2 copies - See Paragraph 19)
D. Holody, RI (See Paragraph 6)'
'
J. Stolz, NRR (See Paragraph 13)
W. Jones, IE (See Paragraph lu)
.
RI:DRP
RI:DRP
RI:DRP
gU
Bateman/mjd
Blough
Polk
4/d'/87
4/@/87
4/ /87
0FFICIAL RECORD COPY
IR OYC 87-04 - 0002.0.0
04/01/87
.
~vr,-,
,
,
- - , - -
- , - , , - , -
--
, - - - ,
,,.
m-
.,,r--,
w
--,-
v -- - - - -
,
-