ML20206C891

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-413/86-15 & 50-414/86-16 on 860226-0325 & Notice of Violation
ML20206C891
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 06/06/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20206C894 List:
References
NUDOCS 8606190589
Download: ML20206C891 (2)


See also: IR 05000413/1986015

Text

OSS'c.'sA

s s

. <

.

JUN 0 61986

Duke Poyer Company

ATTN:/ Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT: REPORT NOS. 50-413/86-15 AND 50-414/86-16

On February 26 - March 25, 1986, NRC inspected activities authorized by NRC

License Nos. NPF-35 and NPF-48 for your Catawba facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments. The violations, references to pertinent requirements, and elements to be

included in your response are presented in the enclosed Notice of Violation.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC's Public Document Room.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

DRICtNAL $tttsim wo

DAVID M. VERRELLI

f9V Luis A. Reyes, Acting Director

0 Division of Reactor Projects

Enclosures: (See page 2) l

l

l

l

K PD

o l

1

j

3

~EE Ol

. . - .. ..

. - --

.  %

[

,

l. ..

!

Duke Power Company 2

.

M0$ $

)

'

Enclosures:

1. Notice of Violation

2. Inspection Report Nos. 50-413/86-15

and 50-414/86-16

.

Ac w/encls:

/R. L. Dick, Vice President - Construction

l!--

-

VJ. W. Hampton, Station Manager

bec w/encls:

/K. N. Jabbour, NRR

J RC Resident Inspector

/B. Uryc

/ Document Control Desk

/ State of South Carolina

l

i

i-

4

N

l

!

RII p , RII

ger:b1m VBrownlee

! 4/f/86 y/ { /86

. .- , . .,. - - . - . . - _ - . - . - . . - - - . , - . - , . _ - . .