Advises That Since Issuance of Insp Rept 50-412/86-17,two Open Items Identified in Insp Rept 50-412/86-09 Adequately Addressed by S&W.Confirmatory Ltr Requested Prior to Fuel Loading Re Completion of Listed S&W Confirmation Programs
ML20206C047
Person / Time
Site: Beaver Valley
Issue date: 04/08/1987
From: Rubenstein L
Office of Nuclear Reactor Regulation
To: Carey J
DUQUESNE LIGHT CO.
References
TAC-62939, NUDOCS 8704100143
Download: ML20206C047 (6)


See also: IR 05000412/1986017

Text

..

--

-

-

-

-

.

.

_ . _ _

..

b.,

s

'o

UNITED STATES

.

8

~ , ,

NUCLEAR REGULATORY COMMISSION

o

.

,

5

t

WASHINGTON, D. C. 20555 -

'

\\*****/

'

.

April 8, 1987

+

8

.

Docket No. :

50-412

,

Mr. J. J. Carey, Vice President

!

Duquesne Light Company

i

Nuclear Group

-

'

P. O. Box 4

.Shippingport PA 15077

,

,

,

I

Dear Mr. Carey:

.

SUBJECT: BEAVER VALLEY POWER STATION - UNIT NO. 2 (BV-?.) ENGINEERING

ASSURANCE PROGRAM (EAP) (TAC 62939)

4

At the time our Inspection Report 50-412/86-17 dated August 13, 1986 was

prepared, two items from our previous inspection as documented in Inspection

,

Report 50-412/86-09 dated June 17, 1986 remained open. Since the issuance

'

,

of report 50-412/86-17, Stone and Webster Engineering Corporation (SWEC)

has adequately addressed these items as described below.

1.

Item 4.3 of Inspection Report 50-412/86-09 concerned the interface between

the Stress Design Group and the Power Division pf SWEC. This item has been

incorporated in EA action item (AI) P-12.

This AI has been resolved to our

satisfaction and is considered closed as will be iridicated in Section 17.5.4

of Supplement 5 of the safety evaluation report (SSER 5).

2.

Item 4.8 of Inspection Report 50-412/86-09 indicated that the recircul.ating

spray system (RSS) cooler support design should be analyzed. This item was

addressed by EA in Al M-26. AI M-26 has been satisfactorily resolved by SWEC

'

and is considered closed by NRC. This item will be dicussed in Section 17.5.4 of

the SSER 5.

1

!

Inspection Report 50-412/86-17, in a number of areas, indicated that NRC would

J

monitor or follow-up on certain items that were under active review by SWEC.

This has been accomplished and these items will be addressed in the staff's

'

SSER 5.

.

We consider that all of these NRC follow-up items have been satisfactorily

resolved. However, we request a confirmatory letter, prior to fuel loading,

i

regarding the completion of the following SWEC confirmation programs,

l

1) 2BVM-117, "Confimation Program of Key Documents", and 2) 2BVM-122,

" Engineering Confirmation Update Program." Confirmation is also requested to

1

indicate that the Internally Generated Missile and Seismically Induced Safe.ty/

Non-Safety Interaction assessments of the " Hazards Analysis Program Audit"

(SWEC EA Audit No. 50) have been fully implemented,

e704100143 870408

f

PDR

ADOCK 05000412

i

G

PDR

i

. ..

.

.

.-

.

_ _ , , _ _ _ . _

_ _ _ . _ . _ _ _ . _ _ _ _ _ _ _ . _ _ . . _ _ _ . - . . _ _ _ _ . _ . . _ _ , _

. , _ _ _ _ _ _

- _ . _

_

_ _

__ ___ _ _ _ _ _ - _ _ _ _ _ _ _ _ _

..

.

Mr. J. J. Carey

-2-

.

In addition, we also request confirmation that the corrective actions in response

to Action Items P-13 and P-15 of SWEC Engineering Assurance Audit No. 52 have

been completed. The Action Item P-13 corrective action concerned the SWEC

!

review of the stress data packages for the six Westinghouse designed systems

I

to assure the validity of the input data, e.g., temperatures, pressures, etc.

i

The corrective action for Action Item P-15 involved the SWEC verification of

i

design inputs to instrument tubing design calculations.

The following Engineering Assurance Action Items (Als) were resolved based on

<

a commitment to submit proposed FSAR changes to the NRC. The Als in this

category are: C01, C03, C06, C07 C22, C45. E03, E04, E05, E08 E09, M01, M02,

M03, P07, P10, S01, 503, 507, 512 of EA Audit No. 52 and Item 1.3 of Audit

1

No. 44. With the exception of FSAR changes resulting from finding C01, all of

the proposed FSAR changes have been submitted in FSAR amendments 13, and 15.

Proposed FSAR changes constitute open licensing issues to be resolved between

the Duquesne Light Company and the NRC as part of the norwal licensing process .

Sincerely,

.

h.

-i

c

_o_

-

Lester S.

ubinstein, Director

Project Dtrectorate # 2

Division of PWR Licensing - A

Office of Nuclear Reactor Regulation

cc: See next page

-

.

o

9

e

e

.

.

. . , -

- . - -

-

,-

, - -

, , , , _ - - - -

. - - - - . - , , -

- . - - - -

,,,-,,-a,

, , ,

w

+, - - , - - - - - - - - - - - - -

-

, , .

. .

i

Mr. J. J. Carey

,

Duquesne Light Company

B2 aver Valley 2 Power Station

'

l

.

cc:

Gerald Charnoff, Esq.

Mr. R. E. Martin, Manager

Jay E. Silberg, Esq.

Regulatory Affairs

Shaw, Pittman, Potts & Trowbridge

Duquesne Light Company

2300 N Street, N.W.

Beaver Valley Two Proiect

Washington, DC 20037

P. O. Box 328-

Shippingport, Pennsylvania 15077

Mr. C. W. Ewing, Quality Assurance

Pennsylvania Office of Consumer

Manager

. Advocate

Ouality Assurance Department

ATTN: Michael Bardee

Duquesne Light Company

1425 Strawberry Square

P. O. Box 186

Harrisburg, Pennsylvania 17120

-

Shippingport, Pennsylvania 15077

John D. Burrows, P.E.

.

Director, Pennsylvania Emergency

Director of Utilities

Management Agency

State of Ohio

Room B-151

Public Utilities Commission

Transportation & Safety Building

180 East Broad Street

Harrisburg, Pennsylvania 17120

-Columbus, Ohio 43266-0573

Mr. T. J. Lex

Bureau of Radiation Protection

Westinghouse Electric Corporation

PA Department of Environmental

Power Systems

Resources

i

P. O. Box 355

ATTN:

R. Janati

Pittsburgh, Pennsylvania 15230

P.O. Box 2063

Harrisburg, Pennsylvania 17120

Mr. P. RaySircar

'

.

Stone & Webster Engineering Corporation

BVPS-2' Records Management Supervisor

P. O. Box 2325

Duquesne Light Company

Boston, Massachusetts 0?107

Post Office Box 4

Shippingport, Pennsylvania 15077

Mr. J. Beall

'

U. S. NRC

John A. Lee, Esq.

'

P. O. 181

Duquesne Light Company

Shippingport, Pennsylvania 15077

1 0xford Centre

301 Grant Street

Mr. Thomas E. Murley, Regional Admin.

Pittsburgh, Pennsylvania 15279

U. S. NRC, Region I

631 Park Avenue

King of Prussia, Pennsylvania 15229

,

I

e

. . , .

_ _ _ _ . _ . .

, _ . _ . .

. , , , . . ,

._

- _ - . . _ , - . . -

_ - - , ,

y

-,

.

-

-

r_

'

.:

s

,

Mr. J. J. Carey

-3-

.

4

Distribution

<

Ty .-

Local PDR

OAB Reading

DQAYT Reading

JMTaylor, IE

BKGrimes. IE

HJMiller, IE

EVImbro IE

HBWang, IE-

LSRubenstein, NRR

PSTam, NRR

PKEapen, RI

LETripp, RI

  • See previous concurrences
  • 0AB:DQAVT:IE *0AB:DQAVT:IE *DD:00AVT:IE tD:DOAVT:IE

PADZ:N

HBWang:Je

EVImbro

HJMiller

BKGrimes

PSTam

/

3/ /87

3/ /87

3/ /87

4/ /87

4Q/8

c.

0

R

,LSRubenstein

4/ P/87

. -

-

-

- -

- - -

-

- -

-

-

.

.

-

-

I

. - - .

.

,

_Mr. J. J. Carey

-3-

Distribution

DCS 016

PDR

Local PDR

QAB Reading

DQAVT~ Reading

'

JMTaylor,IE

IE

BKGrimes,

HJMiller,IE

EVImbro, IE

HBWang, IE

LSRubenstein,NRR-

PSTam NRR

,

PKEape,n, RI

LETripp, RI

.

  • See previous concurrences
  • QAB:DQAVT:IE *QAB:DQAVT:IE *DD:DQAVT:IE

)

.E

PADZ:NRR

HBWang:je

EVImbro

HJMiller

K rimes

PSTam

3/ /87

3/ /87

3/ /87

4/td87-

4/ /87

D:PADZ:NRR

LSRubenstein

4/ /87

,

..

..

' Distribution

DCS 016

PDR

Local PDR

QAB Reading

~DQAVT Reading

JMTaylor, IE

-Mter6HTcROB=:r-

~BKGrimes, IE

HJMiller, IE

'

EVImbro, IE

HBWang, IE4

PSTam, NRR

PKEapen, RI

LETripp, RI

LSRubenstein, NRR~

,

!

!

i

!

/T

l

VT:IE

QAB:DQAVT:IE

(Miller (DQAVT:IE

D:DQAVT:IE

PADZ:NRR

H8 ang

EVImbro

BKGrimes

PSTam

s

3/5/87

3/4 /87

3/)]/87

3/ /87

3/ /87

l

D:PADZ:NRR

LSRubenstein

3/ /87

,

.

.. ..

..

_.

- _ -

. . - -

-

.-

, _ . -

.

. _ -

-

- --