In Reply Refer To:
Docket:
50-285/88-40
Omaha Public Power District
ATTN:
Kenneth J. Morris, Division Manager
Nuclear Operations
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
This refers to the inspection conducted by Mr. L. D. Gilbert of this office
during the period October 24-28, 1988, of activities authorized by NRC Operating
License DPR-40 for Fort Calhoun Station, and to the discussion of our findings
with Mr. W. G. Gates and other members of your staff at the conclusion of the
inspection. .
Areas examined during the inspection included welding and nondestructive
examination activities. Within these areas, the inspection consisted of
selective examinatica of procedures and representative records, interviews with
personnel, and observations by the NRC inspector.
The inspection findings are
documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Odginal Signed ny
W. B. Scaeli
C J: Callan, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Apper::lix B - NRC Inspection Report
50-285/88-40
cc w/enclos res:
(see next pag
D:DRPth
'
RIV:RI
C:HQPS
D:
LGilbeft/cjg
IBarne
JLFilhoand
LJCallan
o/# /88
// / 2_ /88
a / 2./88
gg/g/88
'
8811150029 881109
/
ges
AcacK05oogt}5
_ . _ _ _ ._ _ _ _ _ - . _ _ _ _ _ _ - _ _ _ _
[
- .;
- .;
.
Omaha Public Power District
-2-
cc w/ enclosures:
'
Fort Calhoun Station
ATTN:
W. G. Gates, Manager.
,
P.O. Box 399
.
,
Fort Calhoun, Nebraska 68023
-
Harry H. Voigt Esq.
,
LeBoeuf, Lamb. Leiby & MacRae
l
1333 New Hampshire Avenue, NW
Washington, D. C.
20036
j
.
Nebraska Radiation Control Program Director
7
bectoDMB(IE01)
(
,
bec distrib. by RIV
,
F
- R.D. Martin, RA
- RPB-DRSS
- Section Chief (DRP/B)
- MIS System
- RIY File
- DRP
- RSTS Operator
- Project Engineer, DRP/B
Lisa Shea, RM/ALF
[
- DRS
- RRI
- L. Gilbert
- I. Barnes
i
- w/766
I
h
.
[
t
r
.
I
E
i
i
i
f
!
I
I
i
!
t
i
k