Responds to Generic Ltr 87-06, Periodic Verification of Leak Tight Integrity of Pressure Isolation Valves. Tech Spec 3/4.4.6 Requires Periodic Leak Rate Testing of Pressure Isolation Valves
ML20206A078
Person / Time
Site: Seabrook 
Issue date: 04/02/1987
From: George Thomas
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-87-06, GL-87-6, NYN-87043, NUDOCS 8704070409
Download: ML20206A078 (1)


Text

-

GeorgeS. M vie.n.aswW-Nuch Roduc#on Nrw Hampshire Yankee Division NYN-87043 April 2, 1987 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk

References:

a)

Facility Operating License No. NPF-56, Docket No. 50-443

~

b) USNRC Generic Letter 87-06, " Periodic Verification of Leak Tight Integrity of Pressure Isolation Valves".

Subject:

Response to Generic Letter 87-06 Gentlemen:

The subject Generic Letter requires that licensees submit a list of all pressure isolation valves in their plant, and describe the periodic tests performed to assure the integrity of these valves. Alternatively, a licensee may submit a statement that current plant Technical Specifications require leak rate testing of all pressure isolation valves.

Seabrook Station Technical Specifications require periodic leak rate testing of pressure isolation valves. A list of Reactor Coolant System Pressure Isolation Valves is provided as Technical Specification Table 3.4-1.

The testing requirements for these valves are outlined in Technical Specification 3/4.4.6.

Should you have any questions or require further information regarding this matter, please contact Mr. Richard Belanger at (603) 474-9574, extension 4048.

Very truly yours, Geor S. Thomas 8704070409 870402 PDR ADOCK 05000443 I