ML20205Q890
| ML20205Q890 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 11/03/1988 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20205Q895 | List: |
| References | |
| NUDOCS 8811090390 | |
| Download: ML20205Q890 (2) | |
See also: IR 05000324/1988036
Text
ra
-
- - - _ - --
.J
h
5
))dSeur
.-
.NOV 0
E88
.
A
? ;.g
Docket Nos. 50-325
LicenseNos.DPR-71,50-324
OPR-62
'
Carolina Power and Light Company
<
ATIN:
Mr. E. E. Utley
.
'
Senior Executive Vice President
-Power Supply and Engineering-
'
and Construction-
P. O. Box 1551
r
.
Raleigh, NC 27602
l
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-325/88-36 AND 50-324/88-36
-
,
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
Rich C. Chou on September 12-16
1988
Ihe ins)ection included a review of
activities authorized for your brunsw.ick facili;y.
At the conclusion of the
l
'
inspection,in the enclosed Inspection Report.the findings were discussed with
identified
Areas examined during the inspection are identified in the report.
Within
I
!
these areas, the inspection consisted of selective examinations of procedures
!
s
!
and representative records, interviews with personnel, and observation of
i
!
activities in progress.
[
J
4
Within the scope of the inspection, no violations or deviations were
[
l
identified.
'
Your attention is invited to the unresolved items identified in the Inspection
8
Report.
These matters will be pursued during future inspections.
l
.
4
!
In accordance with Section 2.790 of the NRC's "Rules of Practice " Part 2,
'
Title 10, Code of Federal Regulations, a copy of this letter and i,s enclosure
1
t
!
will be placed in the NRC Public Document Room.
l
,
l
Should you have any questions concerning this letter, pleasa cent u t us.
'
Sincerely,
f
Ok
I
t
ay~
i
Alan R. Herdt, Chief
I
'
Engineerin0 ranch
i
B
i
Division o. Reactor Safety
i
.
,
,
l
Enclosure:
(Seepage 2)
!
i
l
$0V*E88!R 88ss8gu
\\\\
"=
2a,
i
-
NOV 03 $88
'
'
3
'
-
.
. Carolina Power and Light Company
2
Enclosure:
NRC Inspection Report
cc w/ encl:
P. W. Howe, Vice President
BrunswickNuclearProject
J. L. Harness, Plant General Manager
State of North Carolina
bec w/ encl:
NRC Resident Inspector
DRS, Technical Assistant
Document Control Desk
RII
.
RII
' '
'
RC h
er
B ake
Fr d ickson
10h {/88
/le/88
ff///88