Forwards Insp Repts 50-413/86-08 & 50-414/86-10 on 860218-21.No Violation or Deviation Noted.Corrective Actions & Date of Completion for Exercise Weaknesses Noted Requested within 30 Days of Ltr Date
ML20205M793
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/07/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20205M795 List:
References
NUDOCS 8604150380
Download: ML20205M793 (2)


See also: IR 05000413/1986008

Text

-. _ _ - -

4he

'

gpg Q 7 366

.

.

Duke Power Company ,

ATTN: Mr. H. B. Tucker, Vice President l

Nuclear Production Department

l

422 South Church Street

Charlotte, NC 28242 {

Gentlemen:

SUBJECT: REPORT NOS. 50-413/86-08 AND 50-414/86-10

'

On February 18-21, 1986, NRC inspected activities authorized by NRC Operating

License Nos. NPF-35 and NPF-48 for your Catawba facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

j identified in the enclosed inspection report.

I

l Areas examined during the inspection are identified in the report. Within these

l

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Your attention is directed to the exercise weaknesses identified in the report

enclosed herein. Please advise us within 30 days of the date of this letter

actions you plan to take showing the estimated date of completion regarding the

subject findings.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC's Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Virgil L. Brownlee, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-413/86-08

and 50-414/86-10

cc w/ encl: (See page 2)

8604150380 860407

PDR ADOCK 05000413

G PDR

1

I 2:50/

h

i

\*

,

Duke Power Company 2

.

b

'

cc w/ enc 1:

el/*R. L. Dick, Vice President -

Construction

,t/J. W. Hampton, Station Manager

bec w/ enc 1:

,v/ .KN. Jabbour, NRR

~

v/NRC Resident Inspector

Document Control Desk

State of South Carolina

RII ) RII Rt R RII RII

~{ dl0 ')k b

ningha :Jw DCollins

.(b

ACug/86

TDecker DC lins CBurger VBrownlee

3/qfv 3/pg/86 3/3//86 3 6 3/'7/86 3/ -7/86

-j -

q.

h