ML20205J520
| ML20205J520 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 03/23/1987 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Novak T Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8704010332 | |
| Download: ML20205J520 (28) | |
Text
fd',h n
MAR 2 31997 MEMORANDUM FOR:
Thomas M. Novak, Acting Director, Division of PWR Licensing-A, NRR FROM:
Charles E. Norelius, Director, Division of Reactor Projects.
Region III
SUBJECT:
COMMONWEALTH EDIS0N COMPANY, BRAIDWOOD UNIT 1, STATUS OF PREPAREDNESS FOR LOW POWER LICENSING This is the eighth memorandum forwarded to you in accordance with IE MC 94300 to provide information on the preparedness for low power licensing of Braidwood Unit 1.
The enclosures include the items requiring inspection and resolution before a finding of readiness for low power operation can be endorsed by Region III. The classification of these items is consistent with the categories used by Commonwealth Edison.
Braidwood 1 received a Fuel Loading and Precritical Testing license on October 17, 1986.
Fuel loading began on October 25, 1986 and was cortpleted on November 3, 1986.
The ASLB hearing was completed on December 9, 1986. A final ASLB decision is not expected until April 1987.
Should you have any questions concerning this matter, please contact me or Mr. W. S. Little of my staff.
Charles E. Norelius, Director Division of Reactor Projects
Enclosures:
1.
Outstanding Items Including Enforcement and Unresolved Items 2.
Preoperational and Precritical Testing 3.
Construction Status 4.
Status of Inspections Required by MC 2513 and 2514 (Summary)
See Attached Distribution 0704010332 070323 PDR ADOCK 05000456 G
POR YE4
}pC Rip RI,
RIII )
(Y' RI!!
RI QQ' (e/pp j
Q%
Pe Li
'e Paperiello l0 nd Norel s
4 h a
)[:c/$ 7 a 2/ M i
]T.0/
s I'!AR 2 3 195, Thomas M. Novak g
Distribution cc w/ enclosures:
J. Taylor, IE J. Partlow, IE J. Stevens, NRR A. Davis, RIII J. Hind, RIII C. Paperiello, RIII E. Greenman, RI!!
N. Chrissotimos, RIII J. Harrison, RIII C. Hehl, RIII C. Williams, RIII W. Little, R!!!
W. Axelson, RIII W. Shafer, RIII D. Danielson, RIII F. Jablonski, RI!!
T. Burdick, R!!!
M. Phillips, RIII G. Wright, RIII R. Gardner, RI!!
J. Creed, RIII W. Snell, RIII M. Schumacher, RI!!
R. Greger, RIII P. Pelke, RI!!
SRI, Braidwood
. =
6 9
i ENCLOSURE 1 1
Outstanding Items Including
)
Enforcement and Unresolved Items i
i The following describes those issues which remain outstanding at Braidwood 1 i
and the milestones by which they must be resolved.
l
- 1. to this enclosure lists 33 items that must be closed prior
{
to initial criticality, i
l
- 2. to this enclosure lists 45 items that must be closed prior to 5% power.
i
- 3. to this enclosure lists 32 items that are not required I
to be closed prior to initial criticality or exceeding 5% power.
l 1
4.
There are currently six open allegations that are assigned to the Region III staff.
It is anticipated that these allegations will j
be inspected prior to February 28, 1987.
i' Allegation Tracking Numbers i
AMS No. 84-A-0021 AMS No. 85-A-0032 AMS No. 86-A-0167 1
AMS No. 86-A-0195 AMS No. 86-A-0199 I
AMS No. 87-A-0019
)
In addition to the above allegations, the Office of Investigations is j
currently investigating four reports of alleged wrongdoing.
I i
i i
4 1
1
)
i
)
i i
o a
v
- 4, a
o o
o o
e s
u o
o o
e v
a a
u u
m 6
e N
O e
H2 N
3 Ch l W Re w
e e
a N
y
@ O M
'Oa o
JW UN 4
I O
7 N
C o
W o
77 OO w
44 3
w id T E J
U7 m
W 4
w C
W@
aW a
a W
a a i aw a>
a a
J a
a O
W JJ W
04 O
O W
O O
3 J
U OO g
7@
20 7
3 a
G M
4 W
II M4 y
y Y
Y Y
4 E
W 7
3 O
O M
tw a
wu 3
m 3
kw m ed 3
M M@
Wa O
o o
30 J
4
&O 77 J
t
&2 ww O
e O
E 7
OW g
7>
O O
W W
W>
7 m
W4 O
O W
W
@ 7 w
7 9
e kkO pc
=
O W
Ww 4
3 ON U@
J 4
7 W
77w mW J
e o
do 04J JO 4
O m
Fa 4
7 W
wa bJT W
O 4
03 40W 7
7
.8 @
N TF A
w 4
d D>w W
W B>
=71 m
O 7
4 JCW W
D W
UT 400
.9 7
0 4
a 3>
U 2
4 m
2
=
=
w m
w m
w Z
4 U
WW OTW W
O O
O O
W O
UJ O
O
?>>
U O
J c
O O
J O
32 n
O 4 @4 4
O 4
C O
Y O
W O
C4 O
O M 3 2
w B
1 3
4 1
3 OU T
B 77 J
O O
O O
T O
W@
O T
O O
OW4 m
=
7 w
w 6
w ak w
&J w
w wT3 w
U 4
W 4
4 O
4 37 4
4 4
e 4
>UW w
4 G
2 3
G m
@W G
Om T
N 4
Y w
k 2
2 T
D 7F V
F3 e
D
&>4 J
WW W
2 W17 7
0 7
7 JU w
a4 O
T O
OM J3 033 w
w W3 TN k
77 O
7 3
4>
4 W
004 W
O e
U
@W 7@
70 m
O 4
JT 3
J
( W@
W O
W T
O a
W aw TO U
W k
y ww C4 W
k W3I 4
m FM J
w JO@
- b E
k O
UB D
% 4w E
F W
U U
UW 40 h
I J
NT C
3A W
X 2T k
4 @C e
w 33 2
W WGa ww k
7 OM 4
T 4 T T
FU G
3 O
a W
WF O
M W
CW W
O E>d MW w
e uw 4
U Un Un
> a omb w
2 M
O WH w
W c
74 U
T*
J a
J7 A
FOB NW 3
4 0
4 WO O
to OEp M 3 WW W
e T
T U e 7
W W
Uw 7
m 7 =
W 40 kO W
J W
wJ W
4J wk O
W W
>WS W4 J OF F
O 20 CJ J
GU w
a UZ7 m>
>4 0
w 3
w
>4 w
4 O
MW O
M WwO DB W
W e F
Uk V>
Ua 4
4 JJU
'A Tw d
V>
E E
T d? l
?
UM u
MA J
1
?'
J I Om WT T
44 W
O W
J3 I W
47 T
JZ O
Y W
07*
JE
- t Ju a
U a Wu a
JM 2
ww w
w a
UQO i
O w
3 O
O O
3 0
Ek WT S
E E
D 5
2 E
O CB 3
3 3
3 3
3 3
7 N
w w
MW G #
4 4
4 4
4 4
4 a
00 l
N k
WW 7>
ko
>2 2@
F F
U N
N N
N w
4 WJ W
WW JT J
JT aM J
I 3 J
&J b4 34 De ne SM W
kN tw w
V3 T@
Zo 14 Co T@
J
@c Uk
- O Uo UN US am Oc 4
W@
4@
M O V"
VN EW
@w k
OO E
M N
k 4
J M
M w
w N
D o
o o
o o
O o
O 9
1 0
1 0
D N
A h
e e
A wO ed o
4?
o@
o@
MW 4
M O
CA c
ot et or or o
o 9
2/
4
- N
@N C
O 3
5 TM TH Ed EH T
r
's a i
SA No No
%o i
No B4 l
W@
4 C%
b%
D%
b 4
4 1 kW pf D2 1
Sk BN 44 w%
4 to do do tw 4
4
\\
(
O PAGE 2
WEGION !!! TRAC 4ING SYSTEM 03/19/87 ddAIDwood - ATTACHwENT 1 To ENCLosuaE 1 3/1e/e7 Eb STILL OPEN $04T of STATUS KEYI H 6
~
ITEM wESOLUTION
~
b ITE= 80./
INSPECTOR /
ITEd TYPE /
FACILITV NAME LICENSEE INTERI4 INSPECT 04 CLOSEOUT RLSpoNSE uud MODULE h:3.
HdIEF DESCRIPTION DESIGNATED No. INSPECTION ASSIGNED REPORT No.
b 456/N6037-01 HOLTZMAN OPE
- ITEM daAIDdOOO I RECS 79501 STATUS d Eb LICENSLE NILL ESTAHLISM CONTROL LIMITS ON QC CHARTS AND FOR RCT Mh0$1 NOLTIMAN PEMFOR*ANCE TESTS 6
4%/+460 J T-04 HOLTZMAN 0P6* ITEM 8RA10wo00 1 RECS 84525 STATUS d LICENSEE WILL CHECK H-3 AND ISOTOPIC GAwwA ANALYSES AND M6051 HOLT /wAN
. ANALYZE ASPIMED *ESL S AMPLE F OR N-J ANO ISOToaIC GAmwAS AN0 NEPORT RESULTS 10 REGION 3.
6, 456/80037-05 HOLTZMAN OPEN ITEM H* Alum 000 1 RECS gb 79502 STATUS 8 LICENSEE To HAVE MRSS Sfsit" 0'ERAHLE FOR THE ROUTINE M6051 HOLTZaAN COLLECTION OF REACTOR COOLANT SAwpLES.
4, 456/ekO33-10 VANDEL OPEd ITEM BRAIOw000 1 VANGEL 41301 STATUS 8
~
J MAINTENANCE TRAINING PR06 Raw NOT DEVELOPE 0.
~
b 456/4003M-11 VANDEL OPE
- ITEM BRA!0dOOD 1 VAN 0EL 61301 STATUS 4 GP LACK OF SUPERWISION 4 C00R0! NATION or MAINTENANCE TRAINING.
456/M604J-01 DUNLOP OPQt ITEM ts R A IO m 03D 1 DJNLOP 70322 STATUS 8 LSW PUNP Flow CAPACITV.
6 N
456/80045-01 BNL OPEN ITEM 84A10dO30 1 MotwES 4,
42700 STATUS d HUMAN FACTORS PERSONNEL SHOULO REVIEd PATH T45EN ef OPERATORS TO EXECUTE SAFE SMUT 00=N PROCEDURE 0*STRUCTIONS SUCH As evac C
OUCTwodM PIPE Supp0 HTS ANO PLANNED EMERGENCY LIGHTING SHOULO HE CAREFULLY CONSIDEMED.
C c
l
(
(
TO O
O O
O O
O O
O O
O O
O O
O O
O O
3 J
J v
o a
e 0
C k2 3
S a.
@O M
Oi o
JW US 7
O
=
T OO 3
kW J
U7 V
4 C
W3 W
L k
aw 1
W
@V J
V U
U 2
7@
O W
W w4 Y
W W
G T
F O
=
1>
G" U W
Wi O
77 7
ww w
J e
e GP O
1*
7 7
4 e
O O
O
>M 7
W 7
N>
G O
O W>
W d
dw M
7 W4 3
7 FO 4
4 B7 7
m e
M 7 N
70
=
O 20 k
- 4 ww 4
W QU 7
U U@
0 W J T
7 ww F
U J
7 O
JO C
U 4
C7 3
U T
U 4
ku
- A O
2 4
7 X
W O
E w
O M
@e 3
4 7
At 7
w I
w TL M
V T
k T
M W
W 7
O 4
3 J
J d
F w
k u
W
,7 i e 4
7 4
m n
T n
m m
> s M
O m
T@
H U
=
7 7
W O
4 -
'O du
=
V O
C O
a O
7 a
2 (
O r
o
@ T C
t) 0 w
O O
=
0
> 3 0
O 0
O m
O O
O O
V 3 O
A7 C
k O
J G
w 1
4 3
0 1
a 7 3 E
7W D
OW i
O J
O O
7 3
O C =
0 30 0
3 w
a
=
w w
O w
=
T=
M 74 M
O w
U 4
4 4
4 4
L 4
au 4
C2 1 4
4 M
4 2
3 3
4 m
r T T
00 2
Mk G
=
k 2
W V
W V
T it W
J' 4
I k@
D 3
U7 1
7 4
w 7
>O WO O
O 4
E 3
W4 J1 M
a W
=>
JW O
W 3
Je
.J 4 00 a
i W
tw 4 J U
J T
U w
.3 8 U3 0
3 7
m k
wk wY W>
O w
ww kw Y
W 7
4 M 2 w@
HQ 3 e w
7 13 W
7 W
W U
UT 24
>O Z
7 O
O O
W
=
MO NT C
W G
H J3 JO Y
3 7 Z
M O
47
- 47 kW TW M **
O Y
Mwa w3 dw 3D G
E a i K
WJN w@
MW w
W W
wa-J>
T r
a T
w O
J 77 I Ta 4@
CF J
7 t
w tw w@
3 ww O
3 O
@N 4
OF B
m3 WW F
4 W
O e T
2 3
O o
E OU T
as 7
W Q3 W
W D
2 4 W
>>t d
w-W 04 W
WI W4 J
(" N 7E WO
@4 Tk WL w
T O i t w
&4 TJ w
7 w
2M DW W
W
- T O
OJ e OW
@O W9 A
Tw T
s d
l F
7 wo%
?
w?
?
WU
?
U3 OF WT W
O 7
P-W w
TOU d
T4 W
UW W
"T Jr
>Z 1
2 32 a
1
&Uw 11 a
n@
Ja U
M O
3 0
)
O O
O 7>
WT 2
t E
2 2
T C
O@
3 3
3 3
3 3
3 7
MW 4
4 4
4 4
4 4
6 OO 7>
7%
HO V7 4 @
4@
7 I
U w
w I
K WJ W
eW I
d f
W I
r Y
N N
TJ aJ l T
I 14 1
3 4 i
FM IM
=
V3 Je JC Jo O
O JN JN Up 20
?>
J C@
CD 40 wo DN It I4 a
i IM I4 K
4 2
C k
4 d
N N
N n
N 4
4 3
o e
o o
o o
O I
I I
e i
I 4
3 f
f D
C C
~
RC eW t 4
4 4
4 4
f C
O@ l e
o o
o o
o o
+
n E E l C
C D
2 C
C C
C O u E
E r
T I
Z 2
Wm t
I la i N
l i
N I
i N
N l
N 04 l
l W@
l 4
l 4
4 O
I GT l
n d l l
D l
ht i
MG 1
4 4
4 1
4 4
1 4
i 4
m O
O PAGE dtGION III T4AC<!NG SYSTLu 03/Iq/87 6W=!0 000 - ATTACHMENT I TO ENCLUbudE 1 3/19/MT STILL OPEN SORT HY STATUS MEY! d S
ITEM WESOLUTION b
ITEM NO./
INSPECT 04/
ITEM TYPE /
FACILITY NAwE LTCENSEE INTERIM INSPECT 04 CLOSE0VT RESPONSE Uut MODULE No.
H41EF DESCRIPTION DESIGNATED No. INSPECTION ASSIGNE0 REPORT No.
S 456/H6u5/-01 00NLOP VIOLATION SEVERITY LEVEL 6 eRAIUwo30 1 OUNLOP 70326 STATUS H D
INADEQUATE CoaRECTIVE ACTION TO DEFICIENCIES.
b
+56/96052-06 OuNLOP OPEd ITEM 8dA!0wo33 1 OUNLOP 70326 STATUS B TLaTIN6 0F SI CHECM VALVES THAT FAILE0 OURINu 5I-13.
gh 456/H6055-01 PLOSKI gr RRAIUw000 1 EPS Eb
!d THE TSC MuST eE EQJIvscu
's 0=N APERTuME CAW 3 HEADER /PRINTEM AND THE ISC'S E*tav-
'TfLATION SYSTEM Gk MusT HE OPERATIONAL.
4 456/36055-02 PLOSKI opta 1 t 9R410w000 1 EPS STATUS 6 OQ ALL STRETCHEPS MUST HE POSITIONtu 6, =
d'CEDU44LLY g,
SPECIFIED LOCATIONS.
456/46060-01 DUNLOP UNNESOLVED ITEM dWAIOw000 1 OUNLOP 70322 STATUS B LICENSE EVALUATION INTO HOW ACCEpiANCE CRITEWIA wAS MEET en FUH THE 1H CS PuaP OURING THE INJECTION PMASL.
~
b 456/86063-01 TAYLoa VIOLATION SEVERITY LEVEL 4 HRAIUe010 1 TAYLod STATUS 8 IMPROPEN EVALUATION OF UNSATISFACTORY SudvEILLaNCES.
ep 456/870xx-01 LAFRLNIFRE
~
3RAIDWO30 1 EPS O
jA tj STATUS 8 Q
(w ALEwr DECLaatu OUE TO LOSS or om --
FOR LCa SYSTEM Lus5 0F COOLING MODE Fod RMd RHR-LLW INOPERAm.
()
456/87002-01 HELAN6ER VIOLATION SEVEd!TY LEVEL 4 HMAIDWOOO 1 0
81070 STATUS 6 FAILudE TO CONTROL ACCESS TO A VITAL AREA L
(
(
i
O O
DAGE 4
REGION III TRACMINo SYSTEM 03/18/87 MdAID=u00 - ATTACHMENT 1 TO ENCLOhudE 1 3/18/H7 Gb STILL OPEN SORT dY STATUS MEY: e
~
ITEM dESOLUTION ITEM No./
INSPECTOR /
ITE4 TYPE /
FACILITY NAME LICENSEE INTERIM INSPECT 04 CLOSEOUT 4LSp0NSE 00E MODULE No.
HalEF OESCd!PTION DESIGNATED No. INSPECTION ASS 16NEO REPORT NO.
1 en 456/M6001-LL CECO LICLNSEE EVENT HEPORT uRAI0dOOO 1 TONGUE STATUS d EVENT OATE: 10/21/H6 REPORT DATE: 11/17/n6 iVPE:
REV.s gp INIEWRuPTto CONTINUOUS FIRt WATCMES.
46063 TON 60L O
45$/H*004-PP RUSKIN 10CtH21 DEPO 4T BWAludo00 1 955 STATUS 8 PU2 KIN FINE DAwpEWS FAIL TO CLOSE e6045 noL*ES e
SLL LTd DATED 11/06/84 D
456/HS00/-vP CECO 10CFR21 REPORT BRAIDdOOO 1 OUNLop STATUS 8 DEFECTIVE AIRLINE CMECW VALVES IN MAIN STEAM ISOLATION 86052 OUNLOp Ep VALVE ACTUATodS.
SEE CECO LTW dV40N 85-0426 DATED 03/21/85. SEE CECO SUPPLEMENTARY REdPONSE DATED 4/19/hS. SEE WYRON LER 45*/85027 Ep 455/85002-EE CECO 10CtRSO.5S(E) REP 0wT BRAIDw000 1 GAVULA gg 01/31/H6 STATUS B mELOING ON CERTAIN SAFETY-HELATED ASwE SECTION III TANKS ANJ MEAT LXCHANGERS 00 NOT "EET OHA=INGS. SPECIFICATIONS.
O ANJ IN S0aE CASES. CODE REQUIREMENTS.
DATE REPodTED: 01/22/85 INTERIMI 2/21/85. 4/22/85. 07/24/85. 11/01/u5 hp FINAL HEP 0HT:
1/29/86 456/80000-05 SER CHAP 6 OPE 4 ITEM dRAIDWOOD 1 OANIEL509 STATUS 8 UPuRADE 0 ESSENTIAL SERVICE WATER SYSTEM LINES TO AND FROW Gb CONT AIN4ENT F AN C00LEWS TO QUALITY GROUP n. OEedIS SCREEN A00E0 86019 TO MINIFL0m PONGL SYSTEM SUPPLY DJCT -
SLCTIONS o.2.4 PAGE 6-20.
ALSO UPGaADE FAN COOLFR COILS TO Gi uuALITY 6HOUP 9 PAGE 3-2.
4sr 456/80000-17 SER CHAP 3 OPEa ITEM oRAIOW000 1 NORTON STATUS d H00!FIto CATEGORY ! MANMOLL COVERS - StCTION 3.S.3 Gd SUPPLEMENT 1 PAGE 3-13 REPLACE MANMOLE COVEHS.
(?
C
O O
O O
O O
O O
O O
O O
O O
o o
o 4
J 0
V v.
4 4
k O
C k2 N
3 T
O D-
)
W 3.
e N
@O I
m Oa o
.J taJ UM O
t Nm 7
O N
T me n
- > 9 4 OO O O =*
3
== W W
GJ
.J U2 W
3 taJ
& *= W J C
.as C.e 3
D 3
O 4 G **
/.
a.
O F
G J D-G 3 W
A@
7 0
7 74U m
7@
O k
O 30FO
>* 4 t-O k
2 3
O O
e 1 e-a
== U O
3Tm aW B O =*
GJ a o
OOO e- @
t
.J % ~
77 t
J@t
- e e O
k e
O Z
OW J
W e-
- aJ J
W4 O
o-o
@7 3
1 2O J
d me O
U@
7 AV
> to 74 JO 4W T
.)
J W
J O
W laJ B
>J J
UI C
W **
3 J
e >-
aO
-e>-
3 7
> T l
- 3 T7 7
4
-e 2a 24
- N O
-e 2
O w
4U V
O aW O
.J OO U
0 T
O
>A e
O N >-
O O o-O
.J 4 r O -* &aJ e
e a
=
i **
i J
t 1 =* @
O
@ tm O
4 *- C O
W
.J.*
3O
>e 34 2
>=
U 4
4
- TW 4 >-
==
4 7>
>= e-O T 3 **
La T
O >-
4 TOk w **
3a W@
7 D-2 I W7
@W O
4 'b t4 ft O ~=
me N taa
.J G
e-o >-
_J @ e O taJ uJ
- r Z J if a 2
1 3 *-e
>e 4 a 3
1 W "3 k
- i,sl J@
4 tal T Y
W 23 73 4 Ok
- =
1A OO F
r 7
47 Bs
- N>
NT O
O tal a
m >-
.r e-o e-O 4
~W 6-2O OMI Nk e N>
a C*
3YU M4O m LaJ k
ou o@u g
3 W
2 U
A2 YI e
- = 3 =*
N@
W3 taJ U O W taJ e
3 WW 7
2 =e T
W
>- T &
13 taJ 3 >-
uJ
@ >.J 24WO k er O3
>J4
=* O W Im T e-o-k he aJ 4
@ TW 2
3@
W UU M@
W taJ = >=
A tH E
Od i E
%3
.333?
O>
d 'Y W
TT taJ
- 3W J */l Z W
_J T
>- I a aa 1
W4 D 3t/!u @
U O
O Vw E P-taJ T 11 2
T O
O@
3 3
3 Z
N e-e n-e* W N e 4
4 4
a OO a D-D-
>- O t-2 4@
4@
Z T
U r
I w.J W
LaJ W U
U 1 J aJ I >*
@3 T
U >-
2O W
W 4@
- O 1
4 I
l a
4 O
t I
I C
N T
O I
e 9
3 O
O C
i i
(O
- W 3
O O
O C@
c O
O i
e 1
Z?
D C
O 3
O I
T T
Ww I3 N
i N
I N
O4 WW I
l t
I e
4 Y
- - ul I l
D Qr
>* 2 4
0 4
4
Y C)
PAGF 1
WEGION I!! TRACWINt, Syb7EM 03/10/87 dwAIDaht)J - ATTACHMENT 2 To ENCLOsuaF I 3/19/H/
STILL OPEN S0di of STATUS KEY: C 49 ITEM wESOLUTION Ep ITEM No./
INSPFCT04/
ITEN TYPE /
FACILITV NAME LICENSEE INTEQIM INSPECT 04 CLOSE007
(;
RLSensSE out MUuutE No.
H41EF DESCw!PT!oN DESIGNATED NO. INSPECTION ASSI6NED REPORT NO.
V
~
La 456/H*099-07 MCG4FbOH OtVIATION
'sQA!0g000 I wESTHEwG 92706C STATUS C LICENSEE FAILEO TO PRSvluE ADEQUATE DESluN FUa SAFETY RELATED Cp PUsta $YSTE45 ks 456/h*009-01 SCHULE VIOLATION SEVfw!TY LEVEL 4 84AIUwo00 I JACOHSON 06/01/M4 42706H STATUS C FAILUaE TO ESTAHLISH CLEARANCE CRITE41A AND ESTAHLISH MEASURES Gw TO IDENTIFY NONCONF0441NG CONDITIONS WITH RE6ARD To CLEAaANCES.
D 45$/H404*-01 CAT TEAM VIULATION SEVERITY LEVEL 4 BR*!Uwp00 1 JAC0H50N STATUS C A NUusER UF VEN004 PROCURED TANKS AN) MEAT EACHANGERS HAD g,
HttN ACCEPTEU AND INSTALLE0 w!TH wELOS NOT IN ACC04 DANCE WITH RtCUIwtmENTS OF THE VENDOR OHAw!N65 (SECTION IV.d.10.81 b
456/H40 4-os CAT TLAM VIOLATION SEVERITY LEJEL 4 dRAIDw000 l JACONSON STATUS C D
NCH 39. ISSJta IN AP41L 19/9, IDENTIFIED mELO DEFICIENCIES IN EttCTRICAL STduTS AND HANGENS.
InE SUPP0dTINS 00CJuENTATION ATTACHED TO TnE NCR IDENTIFIED THAT 40s OF THE = ELDS mE4E b
UNaCCEPTAoLE.
THE CuwdECTIVt ACTION ALOCK ON TME NCR WAS MAHnED "N/A" AND CONTAINEO A STATEMENT IDENTIrYING THE WELDS AS ACCEPTAHLE.
THERE WAS NO DOCU*ENTATION SuaP09 TING THIS b
C0d4ECTIVE ACTION STATEMENT ON TmE NCR (SECTION VIII.s.I.n).
AS6/A5004-03 OUNLUP OPEN ITEM 8AAI0wo00 1 00NLop 703413 STATUS C IUtNTIFY PREOPERATIONAL TST TO SATISFY REGULATORY GUIDE 86027 OUNLop b
1 108 SECTION C.2.A(H).
H6052 00NLOP b
456/H50%J-06 NAwSEY opt *4 ITEM HWAIUw000 I ULIE 64703 STATUS C FIHE StAL INSTALLATION:
t.
A.
CONTROL OF w!xEO PDRTIONS.
H.
FIRE SEAL DIwENSION3.
C.
CAdLE DENSITY IN FlaE SEALS.
O O
l
(
_t) '
O PAGE 7
REGION III TRAC 4ING SYSTEM 03/18/A7 BRAIDe000 - ATTACMMENT 2 TO ENCLO5URE 1 3/IM/87 b
STILL OPEN SORT HY STATUS KEY: C b
ITEM RESOLUTION b
TTEM No./
INSPECTOR /
ITEM TYPE /
FACILITY NAMt LICENSEE INTERIM INSPECTOR CLOSEOUT Resp 0NSE Out M000LE NO.
ndIEF DESCRIPTION DESIGNATED NO. INSPECTION ASSIGNED REPORT NO.
456/MS053-07 HAMSFY OPEd ITEM HRAID*000 I ULIE 64703 STATUS C D
FAILURE To INSTALL NEw HOSE STATION AND MOSE REEL.
D 456/HS053-08 RAMSEY OPtd ITEM BRAIUdO30 1 ULIE 64703 STATUS C CodTROL VALVES INSIDE CONTAINMENT IN FIRE HOSE STATION en STANDPIPE SYSTEM NOT UL APPHovE0.
456/Hn002-09 GILL OPEd ITEM HRAI0w000 I FRv5 STATUS C COMPLETE INSTALLATION. PROCEuuRES AN3 TwAININS ON USF OF 86026 GILL b
POST-ACCIDENT EFFLUENT SAMPLING SYSTEM PER NU4EG-0T37 ITEM 2.F.1.2.
456/n6002-19 GILL OPEd ITEM ORA 10w030 1 HOLMES STATUS C ts EVALUATE ACCESS TO FILTtR HOUSING FIRE PROTECTION DELUGE ISULATION VALVES.
b
= _ _
456/H6013-01 JAC04 SON OPEN ITEM HRAIUdO30 1 JACOMSON STATUS C Gk REINSPECTION OF HVAC SHOP =ELOS FOR 3ROKEN SILICON WRONZE b
456/86017-01 OESTMANN OPEd ITEM 8RAIOwo00 1 RECS ROS21 STATUS C LICENSEE IS TO INSTALL 3 ADDITIONAL aid SAMPLES IN THE 86037 HOLTZMAN GL FIELD WY SA P0wER.
R6051 HOLTZMAN b
456/N6020-01 MUFFETT OPEd ITEM BRAIDWO30 1 MJFFETT STATUS C STATUS OF TEN 00N GALLERY wATtR SEEPAGE.
O L,
0
(
C
O O
PAGE 3
REGION III TRACKING SydTEw 03/1A/87 NdAIO4000 - ATTACHMENT 2 TO ENCLOSudE I 3/IA/47 (p
STILL OPEN SO47 of STATUS <EY! C
~
b ITEM dESOLUTION (o
ITEM No./
INSPECTOR /
ITEM TYPE /
FACILITY N4ut LICENSEE INTERIM INSPECT 04 CLOSEOUT RtsPomSt OUE MODULE NO.
udIEF DESCRIPTION DESIGNATED No. INSPECTION ASSIGNED REPORT NO.
G 4S5/66021-10 PLOSKI OPE'd ITEM HRAIOw000 1 EPS STATUS C Eb P410a TO EXCEEDING $6 RATED power. THE EOF auST HE C0*PLETED SPECIFICALLY, THE FOLLoalNG MUST 4E COMPLETEut HAN0 LING LooISTIC5 AND ANALYSIS OF FILLO *0NITOMINS SA*PLES AT THE EOF gp quSTS nE PROCE004ALIZE0 ANJ CONSISTENT w!TH THE EwERGENCY PLAN 8 A HOSTE4 or TRAINED IN0!v! DUALS MUST 6E DEVELOPE 0 Fod THE loo!5 TICS AND ANALYSIS OF FIELD MONITORINS SAwPLFS AT THE EOF 8 6,
ANO A COPY OF THE APP 40VED daA10do0D TECMNICAL SPECIFICATIONS MU5T HE AVAILAHLE IN TML EOF.
(SECTION 4.1 1.4)
_~_
b 456/H0021-11 PLOSkI opt
- ITEM MRAIUWO30 1 EPS STATUS C 6
PRIOR TO EXCEEDING SA RATE 0 POWER, THE CCC MUST HE P40VIDED w!TN THE FOLL0w!Ns ITEMSa A COPY OF THE APPROVED dRAIOw000 SraTION TEC*NICAL SPECIFICATIONS 8 A REFERENCL MANUAL OF gh COMPUTER POINT !OENTIFIERS FOR THE POINT TREN3 AND POINT HISTO 4Y PHUGRA*S HELEVANT TO THE HWAIOw000 STATIONI ANO CODIES Or APPROP41 ATE daAIowo00 STATION LAYOUT.
PLID*S AND ELECTdICAL g
SYdTE=S DIAGWAMS.
(SECTION 4.1.1.5) b 436/86021-27 PLOSMI OPE'* ITEM dRA!0w000 I EPS STATUS C price TO EMCLEDING 5A P0wER. THE APPLICANT MOST ENSURE THAT CONT 40L ROOM PROCEDU4ES YIELDING OFF-SITE P4H'S awe IN PLACE ANJ APPROPWIATE PERSONNtL ARE TRAINE0 ON THE PHOCEDURES 50 THAT ALL R4010LO6! CAL ACCIDENTS INCLUDING UNMONIT04E0 RELEASES Ib AN0/OR THE UNAVAILABILITY OF SPECIFIC INSTRUMENTATION (E.G.. CONTAIN*ENT WA01ATION LEVELS) AWE CovtdEO.
(5tCTION S.4.2) b 436/shedI-34 PLOSn!
u Pt'*
ITt*
MRAIowo00 I EPS b
STATUS C P4104 TO EXCEEDING SA P0mEd. TnE APDLICANT Musi Co*PLETE DEWELOP*ENT or AND ANY ASSOCIATED THAINING ON inE 4
" COMMUNICATION SEwv1CES PLAN".
(SECTION 5.4.63 L
C C
4
O O
O O
O O
O O
O O
O O
O O
O O
O C
O J
u u
e N
O C
>2 N
3 h
t On A
w e
W E.
M e
e o
e N
@O M
OS 2
o JW h
UT W
e 7
O
=
M 00 3
kW 2
J 07 1
O V
O LO O
J W
aw J
I W
4 a
a 1
2 J
-2 7@
a 4
4 4
4 4
O M4 W
W O
O O
O E
7 0
w 7%
MU o
QW W1 o
t 77 2
ww e
O k
Z
~
W O
7 O
W J
J 1
W 2
m O
W Wp w
w E
W4 F
W
@7 w
7 7
O 70 eO O
ww 7Ja O
U@
04 7
wW
~7 a
O JO
>O O
e w
7 4=
k W
Up J
Z M 4 e
W O
W A
at 3
2 T
ma W
3
- a O
7 4
W OO d o
w W
O S
7 7
A U
U S
4 m
M 7
w W
w O
w w
W w
w Z
Ja W
3 2
W W
W O
2 JN O
w O
O a
O k
O 7
O O
O F-4 e O
w O
W O
O w
O O
4 0
O-N O
O I
O 4
O J
O e
O 2
=
1 T
> e i
T 3
E D
E 7
E w
J O
1 TC O
3 O
O O
O O
E 3
4 0
w w
. C7 4
k 4
4 W
4 W
4 0
4
=
O m
w W
w J
w T
=
w U
(
k
=
4 I
EO 2
m G
7 2
r 2
0 2
m E
I
>#ww E
o m
O 2
T T
T 32>
W a
7 imu 7
W 7
O 4W 3
Z 3
0 1
NSA W
O W
O 1>w U
4
=
W
.W 7
0 0
u 4
2 k
O O
w W
T WO e u
o J
J W
J 7
4 A
O w?O w
W W
70w 7
G 3 Iwp 4
4 w
3 w
w T
7 70-4 2
3 7
W 4
NO C
www>
0 T
4 w
I I
w 3
Jw O
7 k
w=
4Waw Y
T W
J W
O O
N>
1 4ITU W
1 4
2 FW
=
ueO4 7
U e
7 r
2 x
U w
W O
w O
O U
WT T
U W
T W
X w
N@
OOW O
Z U
k W
W w3 WW Ok 7k W
4 7
O Y
U 7
W 7
7 4
k 10 F
w@
Z W
3 W
W W
W W
=
W J
W4 TO>
J W
W J
V e
H J
TH
>L 4W3@
O w
w W e w
Z w
w 4
3@
W O>J T
W W
W r>
+
A Tw w @ 'J T d
w I
?
T WW H
U 1
?
'S
?
A OF MT T>EO Y
4 W
J d
IJ d
M W
=O W
Z JE
>D L@wk Z
E K
>L J
WH a
w i
U
=
3 O
O O
O O
Z>
WT U
U U
U U
U U
O O@
3 3
3 3
3 3
3 7
k w
w NW a e 4
4 4
4 4
4 4
a CC i H
>0
>Z Z@
Z 7
O w
2 W
W w
w kJ W
WW I
E OT J
J It 10 W
7 J H
1J l
JM 30 30 ab am 1
Iw w
@D C
>4 C#
Oc F4 Fo J
I UN 2C J
4@
wo a
Oc Uc
@c I
X o
m m
M 4
1 4
i W
M M
N T
M I
3 m
o o
e o
o o
C I
s e
I I
I I
i O
N w
e T
T T
T 40 eW N
N m
M m
9 4
O O@
O o
o
=
o o
C 9
?Z C
C E
D C
C C
3 C
I T
r E
E E
i WH 7%
N l
N N
N j
N l
N N
34 WV 1
4 C
n C
l D
D 4 Y I
I
- W
{
A A
l l
1@
4 w2 I
4 4
4 4
8 4
4
+
t
-..-y
.m.___._,,.
O' O
PAGE 5
REGION III TdACKING Sv5 TEM 03/IR/d7 ddatowo00 - ATTACHuENT 2 TO ENCLudUdE I 3/IN/M7 b
STILL OPEN SORT HY STATUS KEY: C ITEM RESOLUTION ITtd No./
INSPtCTOR/
ITtM TYPE /
FACILITY NA*E LICENSEE INTER 14 INSPECT 04 CLOSEOUT HLSPONSE OUL MODULE No.
HMIEF DESCRIPTION DESIGNATED No. INSPECTION ASSIGNED REP 0pT No.
456/H6045-04 HNL OPEd ITEM HRAlow000 I HOLMES 42700 STATUS C D
HEPAla PROCEDURE (FOR COLO SHUTOOwN EQUIP *ENTI ONLY A00HESSES CAoLE. No PPOCEDUdE FOR RtPAIRING OTHER vuLNEHARLE COMPONENTS.
h 456/H6045-04 KUd!CKI OPEd ITEM BRAIOw000 1 PSS/ FPS 64704 STATUS C D
INADEQUATt SPw!NKLER PROTECTION FOR OPEN MATCMwAY METwEEN ELEVATIONS 401 FEET ANO 426 FEET IN AUKILIAWY HUILDING AND NO SPHINKLEd SYSTEM wAS INSTALLED TO PROTECT int STAIRWAY AND bp NAfCMaAY ON ELEVATION 346 IN THE AuxlLIAHY e4UILOINS.
~
4S6/H6045-06 KUNICKI UPtN ITEM ddA!Owo00 1 PSS/ FPS 6*704 STATUS C SPHINKLER SYSTEM OHSTRUCTIONS WERE 04 SERVED IN SEVERAL AREAS b
kHIC8 INCLUDE BUT WAS NOT LIMITED TO ELtv4 TION 364 ANO 426 FEET OF THE TUdHINE HUILDING.
b 456/86045-0T KUdICKI OPEN ITEM dRAIOWOOD I PSS/ FPS 64704 STATUS C LACK OF MANUAL HOSE STATIONS IN CAHLE TUNNEL AHEAS INCLUDING VALVE GALLERIES.
b 456/d6045-OH KUNICKI OPEd ITEM BRAIOwo00 I PSS/ FPS 64704 STATUS C D
GAPS IN THE STEEL DIA*0NO PLATE ELEVATION 426 IN TME AUXILIARY uu!LOING SHOULO HE SEALEO.
b 456/86045-13 HOLMF.S UNRtSOLVED ITEM HWAIOWO30 I PSS/ FPS 64704 STATUS C b
RUSKIN PART 21 DAMPERS FAILING TO CLOSE UNDEM AIP Flow CONDITIONS.
456/Nn0,0-0$
PLOSKI OPEd ITEM RRAIOw000 1 EPS STATUS C e
PRIOR TO 54 power. AMEN 0 EAL CONDITION P4 IN dwle 200-IAI CONSISTFNT wITH NUREG-0654 FOR 6ENERAL EMERGLNCY.
C C
C
~
- ~. _ __ _ -. _.
~ --- -
.~
C O
DAGE REGION III TRAC 41NG SydTEM 03/1A/87 dwAIOw000 ATTACMMENT 2 TO ENCLO3URE 1 3/1M/RT Gk STILL OPEN SORT MY STATUS MEY: C
~~
g i
ITEM dESOLUTION i
~
ITte No./
INSPECTOR /
ITEH TYPE /
FACILITY NAME LICENSEE INTERIM INSPECTOR CLOSE00T RESPON5L QUL MODULE NO.
H41EF DESCRIPTION DESIGNATED No. INSPECTION ASSIGNto dEP0ff No.
O 456/60051-01 MOLTZMAN OPEm ITEM HRA10w000 1 RECS r
R3523 STATUS C D
RCT'S TO uEC04E ANSI-QUALIFIED.
b 456/H6051-05 HOLTZMAN OPEN ITEM BRAIOm030 1 RECS 79501 STATUS C i
LICENSEE WC OEPAWTMENT TO NEVIEW SPEC HCT PEMFORMANCE CHECK g
]
PROGRAM IN NEAT AUDIT OF CHEMISTRY.
1 GP 456/en063-02 KR0pp VIOLATION SEVEw!TY LEVEL 5 URAIDWOOD 1
<ROPP STATU5 C i
INADEQUATE REPLACE *ENT FOR AUX FEE 0 DATER 0!ESEL PUMD lp NICAO nATTERIES.
S i
45s/87003-01 00PONT OPEN ITEM 3RAluwo00 1 OUNLOP 7032*
STATUS C VEHIFY TEST RESULTS To duPT-AF-10 RETESTS 415,H105 AND R140 Gk
\\
456/82010-EE CECO 10 Cr.R 50. SS I E ) REPORT 3RAIOW000 1 42-10 JACOHSON e
0e/15/65 STATUS C Followup DUE DATE: 07/01/s3 REVIEW OF BOLTED AND WELDED eLOC< WALL COLUMNS AND TEES BY d40ir SCnULE GJ5 4 NEwdERG FAILED TO FIND INSPECTION DECOR 05 FOR.
H4023 KEY et 1
75J OF 2028 WELDE0 AN) 399 0F H2h BOLTED CONNECTIONS. OF 64034 SCHULZ TNtSE, 113 dELDED AN) 149 HOLTED CONNECTIONS AME STILL ACCESSleLL AND w1LL BE INSPECTED PRIOR TO FUHTNER WORM.
]
DATE REP 0dTE0 11/19/92 1
INTERIM 3 12/30/82, 7/1/63, 5/7/A4, T/3/84, 11/02/H4, 8
01/17/85..
Op FIeat REPORT: 05/1S/35 M
N
+56/a3001-EE CECO COSARO 10CrHSO.S$tEl HEPORT BRAIDWOOO 1 R3-01 JAC0HSON 02/24/83 STATUS C PULLMAN SMEET METAL HVAC INSTALLATION g
i I
INTERIM: 3/1/H3
]
FIWAL:
G i
I GE I (1
b
O' O
PAGE T
REGION III TRAC <1NG SY5 TEM 03/10/87 6dAIudO00 - ATTACHMENT 2 TO ENCLOSUdE 1 3/18/87 Gb STILL OPEN SORT Hf STATUS <EY: C 5
TTEM WESOLUTION GP.
TitM No./
INSPECTOR /
ITEM TYPE /
FACILITY NAME LICENSEE INTERI*
INSPECT 04 CLOSFOUT RLSPONSE OUE M00VLF NO.
H41EF DESCRIPT!oN DESIGNATED No. INSPECTION ASSIGNLO REPO4T No.
,GP 456/43003-tE CECO 10CFRs0.SSIE) REPORT dRA10dOOD 1 R3-03 JACONSON 06/09/H3 STATUS C Followup OUE DATE: 04/16/83 GP AS-du!LT LOCATION OF NSSS.
LICENSEE ISSUE 0 NCR L-469 AND CLASSIFIED AS N3N-REPORT 48LE.
FINAL HEPORT: 4/8/H3
$p
- S6/e=007-PP MEXCEL/ MCI O!V 10CtH21 NEPodi 8RA!0wo00 1 YIN
's STATUS C SAMPLES WECFNTLY TESTED FROM ENERGY AHSORdINu PIPE RESTRAINTS FAdA!CATED of HEACEL/*CI OURING inE PERIOD 3p 19#H-19Tv HAVE HtEN FOUNO To HAVE AVERAGE OfNAMIC CduSH STHENGTH VALUES HELow THE ACCEPTAHLE VALUES.
Stt HEACEL Ltd DATED 11/08/84 b
456/94005-FE CECO 10CEd50.SStEl DEPORT 84AI0dOOD 1 JACONSON Eb 03/01/66 STATUS C AN OVERVIEW OF SOME STRUCTURAL STEEL INSTALLATION TRAVELER PACKAGES HAS REVEALED So=E INCONSISTENCIES Gb DATE REPodTED: 01//3/84 INTERIM 04/07/s4, 10/24/84 03/06/95, 3/3/es Fle4AL HEPORT: 09/16/A6 3
456/n4006-EE CECO loCrR50.SStE) HEPORT BRAIOWOOO 1 JACOHSON D
06/01/MS STATUS C THE 1/4 INCH LINEW PLATE FOR THE AUXILIARY HulLDING VENT FILTER EAHAUST HOUSING. THE CONTAINMENT FAN COOLER H3USING, AND THE 84 Gi INCH OIAMETER RETURN AIN WISED FOR THE CONTAIN=ENT FAN COOLER HOUSING MAY HAVE MEEN INSTALLE0 AS NONSAFETY-RELATED RATHER TH4N SAFETY-RELATED.
Gy nATE REPDHTED: 06/05/84 INTE9!**
T/1d/H4, 10/9/H4. 12/12/H4. 3/21/M5 b
456/H*011-EE CECO 10CPH50.55tE) 4EPOWT HRAIUWOOO 1 YIN STATUS C 64 STEAM GENEPATOR SNUHdENS FAILED TESTING.
'wEv0RT DATE: 6/?8/H4 INTERIM 7/31/84. N/26/84 sa C.
Ci
(
O O
O O
O O
O O
O O
O O
O O
O C
O O
J J
J v
N O
tr 6-2 3
tr Op es a
WF.
\\
4A u m
O&
O J uJ US 2
C me T
OO 2
3
>- W O
J UE
'd 2
O WO T
3 W
a **
O O
I W
U 7
7 T
J 7@
4 O
4 e-o 4 7
k 7
O m.
3 >=
== O ft W Wa
>W 72 eie w e
O 2
O
>=
O w
4 7
W >-
1 04 W4
>- & 7
@7 W ** #
70
>T>W id =*
LL T77 O@
== 0 7 4
_J
- W 2#O2 3
JO W 2 7 46 3
>4 7
W WO e.-
OO r7 D
h
- -Z>M 3
e T
4
> e p-V V
N 7 7 >=
'd W
m A2W3 8 td O
T
\\
tddWOO 3
2 4
O M
ee
> > = E 7 se N O 2
2 J >=
W v
O W
O O
Y ** W tJ O O
O u
O b-O O
4 to TT4 ON&
4
>=
0
?
K O
O W
>= 1 O
2 e-o 1
N B
u J 4 _J B
U k
J Q
4 0
3
&47@
OW
==
m 7
o n.
td W td W we T
M U
4 O
N 4
4
&I@WW 4 >-
e-o 4
2 LJ m
Y T
3 37 T 34 tm G1 7
o I
- T1
@ W td >- W TOU
@ E I t.aJ T uJ Q 7
W >- >- T. W
@ J O
7 4
T J
OI w
4 I
Q. T TJ&
J >-
0 2
N J
OO4a U qA W
O N
4 ed *3 'J W 3 O
2 O*Ne
>e 4 3 OO@@
IT T%e Tm 4 <T &
1NO%
WN 2 I IW4 ta oa
.O
>- o to ei- >- I O
t-O **
=
w 4m e
b e e
N 2
2%
- \\
Y I %
0AT T4 I
7 0
w T e?
O O 4 2YOI4
%A NU C
CL O
Io a
O ce I A
- e 4 0I mO E
W J
N uJ 7
% K.
>- W @ 7 U oJ H -e
>=
T W e-O G
- =* ? %
7 J LJ O N
3 O ** **
D O N -*
3 12 TN&
=
G *- 2 2 W
O >- =* %
T 2 3 P-O
>=
4 e W % b-y a
W N taa % **
OO4 T e W -* O U
w IT O
@ T -* '*'t 6
2
>- ee Y
4 'd T **
dWJJ ee 3 WW I 1 ** W 44 **
F T La C@
J>4 G1 k
aO e
T ad T I o
WI W
T4 2 3
4 a' e taa 4 c
teJ 2 **
o
> a e-e==
Q
=* V O OO>@
T >-
>= to e
F 3 J A
O TJ to td >- tnJ E me 7 **
DB W
T w td 4 T
TWW4 OY77 2td W T e
A l
T =*
L' s e-W ?
6' d -t w ?
?
I43T d d 3 ha O 0%
WY U
4 Z =*
U Z4 ? **
W WIOTI 7@OW JO FI o
1.D O ** a o
W D ** A a
CL e-X 4 >
uJ @ 11 O O
O O **
Z >=
id 2 U
U U
U O
O@
A t-3 3
3 3
7 4 >-
e-N (d 4
4 4
4 CL CO P-a>
>- O
>- 2 4@
7 K
U I
to J W
d 'd i
O T J
>=
CL J O
O I *e
@3 O
O 2
U >-
2O W
W W
4@
== O U
U 7
4 W
4 W
7 T
I 3
W I
W T
Q 0
0 0
0 3
N A
'?
o N
TO eW
--e 4
-e f o
N O
CA c2 or o
o e
9
^Z ?
4N D
r O
O T -*
K
-4 E
I W e-e l
T3 NO Nm N
l N
O4 td V
@4 %
IN O
I e 4 Y I
k d I m
'D to GT I ** 2 4o
- O 4
4
C>
PabE I
atG10N III TRAC 41NG SYSTEw 03/1H/87 Nd A10 000 - ATT ACH4E NT 3 To ENCLO5UdE 1 3/1H/e7 STILL OPEN SoaT uf STAIUS MEY: 0 t,
ITEM wESOLUTION (p
TTEw NO /
INSPE CTOR/
ITEM TYPE /
FACILITV NA*E LICENSEE INTEd!M INSPECTOd CLOSEOUT t>
at SF mst out wooutf No.
HdIEF DESCw!PTION DESIGNATED NO. INS 9ECTION ass!GNtD DEPORT No.
to 456/M10x8-01 PRIVATE CITIZEN 0 pea ITLd 6RAIOwo30 1 aECS STATUS 0 N4C TO COLLECT WATER SA*PLES FR04 HaAIDw00D CITV SELLS ANO e4003 OESTMANN t,
mELLS F40m TMEL"A CORNIN FARM IN w!LWIN6 TON ILL AFTEd BRAIOm000 M6017 OESTwANN ST4 TION IS IN OPERATION Fod 64055 ALPHA, GROSS HETA AND GA44A 86037 n0LTZwAN ANALYSIS AND TRITIUw.
us051 M3LT2aAN ty 456/w*009-0M SCdutz OPE 4 ITt*
sRAIowo00 1 xROPP qw 12/01/84 370558 STATUS 0 TIMELY mRITTEN CONCudaENCE Or VE4 DALLY APPROVE 0 FIELO CHAN3E HEwdESTS.
gy 456/4%00*-01 MCGREGOR UNRLSOLVED ITEM RRAIDw000 1 TONGoE Ek STATUS O GdtASE LEAKING FROM THE JJNCTION HETmELN THE SEARING PLATE B5033
THE NELESSARY HOLTINS,.ATEd ORIPPING FROM TtNDON 241.
8505T TONGUE CECO /CONTdACTOR - G.
- 4. NEwdERG To REWOVE COVENS OF So TENDONS 46031 TONGUE TO DETERMINE PRESENCE OF =ATER.
AS OF 11/29/95, 80 VERTICAL S6065 TON 6UE
()
TENDONS HA0 HEEN EAAMINED ANO =ATER m&S FOUNO IN 10.
CECO MILL Nos EXAMINE ALL VERTICAL TtNDONS.
LTH OF 2/2/97 SLL TO CECO - DESCRIHE0 FINDINGS AND PLAN TO GD TIE IN elTH U-l ISI - CtCO PLANS TO DETENSION AND PULL ONE w!?E FROM 1 VERT, 1 DOME AND 2 now TENDONS TMAT HAVE EAPERIENCED WATER PRESENCE.
456/s5037-01 EPS O P E'8 ITt*
44Alowo00 1 EPS C,
82301 STATUS 0 FOLLomuP 00E DATE: 11/30/e6 NEITMER CONTROL 9004 NOR TSC STAFF SIMULATED A CALL TO TdE NHC OPERATION 5 CtN TER AS A RESULT OF inE ALENT OFCLARATION.
O 436/83037-02 EPS OPEd ITEM BRA!UdOOD 1 EPS te 82301 STATUS D FOLLO=UP OUE DATE: 11/30/86 FodECAST CHANGES IN METEOROLOGICAL CONDITIONS *ERE NOT A0tWUATELY INCORPOaATED INTO TnE OFFSITE PROTECTIVE ACTION L
DECISIONd4 KING PROCESS.
O L
C
'O O
O O
O o
o o
O O
O O
O O
O O
O O
J 4
J J
J e
l i
e i
N O
T WZ N
3 G
=
W G.
N WO m
G1 o
JW 04 Z
O w
T y
k CO 4
3 kW T
O N
O WC 7
27 3
O J
H am m.
4 4 4 J
7 J
W 1
4 2
O TT 7
7 3
U C
3 7@
3 1
Q T
06 O
G 3
O W
T M4 k
k k
W O
3 7
O w
Fw
=U e
SW N
TW we W4 o
oc o
o t
4 4
77 t
EZ O
E ww e
e O
2 J
J w
4 O
3 O
W 2
W w
WW W
O W4 W
7 7
O
@7 V
e O
O J
20 4
w 1
O ww O
=
kW w
Um T
wT W
O ww W
O 2
4 JO WW G
T C
Ow 2
7 4
W ZI W 3-O O
k W
( U wTm 7
A Z
J e
Z
@ )
74N W
W e 4
WW W
e W
T e W74 4W 3
Y 2
30 tr U
T@
Z 4
m J
w 4
=
=
O$
w WU7 w
w w
O>
w 2
=
W 00 2
1 J Y
O 3
O W
O O
OT O
exw O
W O
T 4 U
O O
d O
O Ok O
MT>
O 7
O 07 4
h 3
O 4
O O
2U O
J U
O W
O U4 4
w E
W D
2 i
i a B
@ 2W E
O Y
J 3
T 3
O O
O O
O 40@
3 O
Oh w
w w
h w
w
>=
w ww w
d
=
70 w
U 4
0 4
4 o
4 a
4 WM 4
7 4
0 w
4 T
4&
G E4 m
w OF M
k E
T O
2 W
T RO M
wy e 2
C WO O
F w
OW TN 3
@A 7
W 4
U 1
>Om w
O W
2 1@
Ik?
7 OM
=
2 M
W WW 7w O
74 0
2 w
kB OM O
4&
W w
U 7
4 e
W T
2 2
w k 4 FUo NO w
4 k
OT UwM 7
Wu J
W W
U WJ O
Ta w
J O
3 rJ
=
wW U
U EW w3w k >
N 4
W WT O&T 4
2 T
2 h
o U
w3 1
U k w NO C
W 4
DO WO4 w
C 1
w 7
3 1
W ki VO k
ma 0
"O HOF
=
@T N >
1 O
B ET k
kO m ut e.
==
3
.'T aO JH Y
T 4
I Ja hf w O 3
34 U
T Y
r E4W 7
@ 2 W
\\@
V O
S
(>
bT>
WO m3 WW T
=
T 7
O F
72 7
OT3 I
W 7
&T 10 W
J W
4 W
O W
04 W
D W
W W
4 W4 3
a M G H
@Ww E J 3>
kk w
U w
w w
o w
WO w
- rt w
7 e w
WT 3#
W w
Wa WWW WW MW tw 1 2
3
?
Z t
1 UT E
J T
?
Jt Ob WT J
J W
W W
T W
DW W
Thw W
ww W
WT J3
>I a >
a 2
a E
a Op 300 a
JW Zw U
=
0 0
0 0
0 0
0 7>
WT O
O O
O O
O O
O O@
W 3
3 3
3 3
3 3
7 MW 4
4 4
4 4
4 4
CO Tk HO
>7 1
4@
F Y
U W
w T
WJ l W
WW F
F k
3 Y
O N
3 J G >
GJ 7
2 2
C JD
>=
Iw
=
e3 4
4 4
7 O
20 JC UM 70 Q
2 3
O J
3M Cm 4@
MO C
O O
a 00 E7 I
H 4
l D
N P
i N N
W w
O 3
o y
o o
o m
I o o
3 D
0 0
0 0
0 0
N N
N N
D w
A N
%3 eJ o
o o
a N
N m
3 C@
c o
o o
o c
O E
EZ C
D C
D D
D b
O O
I I
I V
T T
T ww 2%
I i
N i
N I
N
{
N N
64 WW l
D e
D D
E f
4 T I
>d A
I A
1 m
I D
A l
&2 H
M4 4
4 4
4 4
s 4
l 4
O O
o o
o o
o o
o o
o o
o o
o o
'O O.
9 a
o L
v O
C k2 3
ED Ch BaJ M e o
e o
@O m
O CL o
I tas UR 2
C T
k OO T
3
>W W
J VE (L
1 C
O d@
k k
2 a==
4 uf W
U J
T 7@
ka W
- e 4 a
a 3
T 2
O me YH
- U
&W WG
>e i
77 i
w we e
O W
i 2
LS 3
2 Y 4
0 4>
E O
W T we O
W Lal >
U B O
W4 3
M l
@ 7
>+ O a
W l
-d.O 2
OW 2
U i
k u
7 W
i U$
WO O
T 3
2
- ul e
TW B
CL JQ H H 4
k H
I T
C O
4 3
O O
W W
22 2
2 ed Oa F
T
=*
t A
T Y
3 0
3 O
t 2
7>
U H
T 4
4 OJ W
k
- e 4
T W
C
- W T
7 T
{
3 Y
kk U
W O
U 1
2 4
me W
U4 e*
o.e
- e K
e.e
+
Z 2
43 W
N E
W Y
O O
F0 O
O O.W D - O k-O O
-U U
O 16 O
7W O
7 O
O e O
4 e O
O O
4 0
0 00 0
4 o
a>
O Eo O
2 0
4 2
1 0
1 O at E
7 nr >
3 D
O 1
J Q
W O
O T
3 T >e O
O O
E O
4 M
me OF M
C
- UU
- e U
4 4
4 wO 4
gg O q
m4 q -
g q
W 4
4 3
2 B F M
mW 2
- a 2
2U 2
G 4
l to T
W V
taJ k T
O4 2
Id T
J CD Q.
F 2@
1O U
3o 4
e 7
O4 W
U O **
$U O
@ 3 J1
- T CL O **
O 4@
O me F
ka O
- J teJ CL MZ O tak ED O
O W
T T 7 **
- E 3
w 3 >-
T 33 W
2H J
O W
{
W
@ a 7 eaJ W
taa
@ las 4
MO 3T i kf D
@M J
O taJ T
nnJ >
a W
Ok O
43 3
O la.
HO O4
.J J ae A
D **
A 23 U
me 3
T F
A J
2
- J k taJ
_J 3
%O O
T
- Y F4 k
&a J
W taJ T
e=*
OE e O
- e O stt 4 e 7G M =
k 3
7 ww@
ko OW T
T 3W 7
[
CL O
taJ ZOO O2 6
W ua td W
F2 O4 mW
==
7 a
3O G F M
43 (A
Y M
O Id saJ LaJ kG LaJ >
Id IU
&F U
U T I =*
22 1
Om W
WO Q
k>I W **
k O
D@
CL n3 SaJ td 1
O W
T Tk E
5 tas F
G W
G 1
0 aO W
d tm k tal a7 eJ Ow O
WW D
.J >-
saJ JE taJ 4 H
J 8
OCT k
C3 E7 M
22
.J kO et M i
1 7>
>k 4
O
.J O Bas
>=
3 **
O F
T7 3@
uJ inJ k (d 4 WU O >=
4 J3 td =
A T*
T
- 1 W
T "J J E
D E
tak k J
-* 1 eJe ZA Y
>4 0>
taJ T W
Z T
4 ** a d
W2 W
W4 3
4W T
- 4 td W2 JB HI a
3 2
1A@
1 QM 1
2 T.
I6 2 Z
Ka CL
@ >=
U w
O 3
O O
3 O
Zk WT S
O O
O O
O O
O O@
Alt k
3 3
3 3
3 3
3 7
m sn2 G e 4
4 4
4 et 4
4 a
CO k
2W k
>=
kO
>Z M@
4W 7
Y U
V E
T 2
10 W.J taJ WW U
W N
CL O
O ao T J a.J Kt
> >e a
=-e E&
Je E **
@3 TC a **
.J o Oo
>o
>c 2o Uk 20 3N O P.
O#
$M 4>
4A
> me 4@
wC Ye TN Z@
W ce
>N
>- N CL 2 Y
e P.
P.
<t tab 7
.O me N
R N
0 3
o o
o o
o o
O 8
9 9
0 0
9 8
l i
3 11 A
N i
- O eW t e
4 4
O l
C C/ l o o
o o
o o
i c B
Z7 l C
D C
4 D
D O
C I r
r T
T T
10 T
T1 I
i %
N N
N N
W e-*
i b4
- aJ @
t 4
4 4
D D
4.Z I
>- 4 l
D 1
D aT l
- T 4
4 I4 4
4 14 4
O PAGE
+
REGION III TRACKING SYSTEu 03/IH/M7 d4410 000 - ATTACHMENT 3 TO ENCLOSURE I 3/1M/h7 GP STILL OPEN SORT 6Y STATUS KEY: 0 D
ITFM RESOLUTION D
ITEM NU./
INSPECT 04/
ITEM TYPE /
FACILITY NA*E LICENSEE INTERIM INSPECTOR CLOSE007 RESPONSE OUE MODULE No.
H41EF DESCHIPTION DESIGNATED No. INSdECTION ASSIGNED REPORT NO.
6 456/8700M-01 HOLTZMAN OPEa ITEM 8RA104000 I RECS AA525 STATUS O LICENSEE =IL UETE4MINE FE-55 ACTIVITY IN A wESL 59I4E0 SAMoLE ANJ HEPodi dESULT5 TO REGION III.
D 456/d7006-02 HOLTZMAN OPLM ITEd BRAIDwo00 I RECS 79501 STATUS 0 D
LICENSEE TO SEND C09p0 RATE QA/QC OIRECTIVE To HEGION III AND TO DISCUS 5 IMPLEMENTATION SCHEDULE AT THAT TIME.
D 456/86000-11 SER CHAP 7 OPEH ITEM ddAIUw000 1 DUNLOP STATUS 0 g
REMOTE SHUT 00dN CAPAMILITY SECTION 7.4.2.2 PAGE 7-21.
S 436/79001-so BULLETIN BRA 10w030 I wESTHE4G STATUS 0 ISSUE DATE: 02/0H/79 CLOSE0VTI
/ /
FOLL0 dup 00E DATE: 06/0R/79 ENVIRONMENTAL QUALIFICATION OF CLASS IE EQUIPMENT g,
SENT FOR INFO D
456/79001-16 suLLETIN BRAIDWOOO I MUFFETT STATUS O ISSUE DATE: 06/06/79 CLOSEQUT
/ /
FOLLOWUP OUE DATEt 12/09/79 IEu 79-01A - ENVIRONMENTAL QUALIFICATION OF CLASS IE EQUIPMENT D
(UtFICIENCIES IN THE ENVIRONMENTAL QUALIFICATION OF ASCO SOLEN 0ID VALVES)
SENT FOR INFO.
D 456/79001-4H 80LLETIN BRAI0w000 1 wESTHEMG GD STATUS 0 ISSUE DATE: 09/30/80 CLOSEUUTI
/ /
. Followup DUE 0 Aft 03/30/81 IEo 74-01d $UPPLEMENT 2 - LNv!RONMENTAL QUALIFICATION OF CLASS IE EQUIPMENT.
b 456/79001-58 9ULLETIN BRAIOWOOJ I MUFFETT
$6 STATUS 0 ISSUE DATE: 10/2A/NO CLOSE0VT3
/ /
FOLLOWUP DUE DATE8 04/24/RI IEd 79-Old SUPPLEMENT 3 - ENVIRONMENTAL QUALIFICATION OF CLASS IE EQUIPMENT SENT F04 INFO.
EJ t
C
-O O
O O
O O
O O
O O
O O
O O
O O
O O
O o
a e
v 4
e-e N
O C
>2 N
3 C
Ch w
e W 2.
)
N
@O i m
Oa o
JW 2
C
=
T CO 3
>W W
J U2 a
W 3
W W
O WO C
3 3
3 3
aw N
O 2
O O
W Z
O 7
7 7@
a a
T O
0 O
we W
O O
F M
e 2
i O
w 7H wu 2W m
Wa o
4 72 l
C ww e
e W
O Z
Z O
w a
O W
O 4
7 WW W
ed U
4 W4 3
Og "k
7
@ 7 W
W4W W
k 20 w
@> K 7
w w
ww DWO 4
0 4
U@
9 WTJJ D>
J O
7 wW 2>UJ7 4
7 JC w
M WW7 O
k I
WW> sr>
O W
0 W
TJJ BwA e Z
7 Y
PWh
@&O w
4 4
d J43WZ 04 T
J J
~
Jk OIww>o 3
W C
A wawFkIUW G e T
J W
BWD WWWW T
3 7
UW *J aZ
@d O
W 7
4 d
wN FUT@ JOW WNWZ wNW wNE wNA Z
Z w4a13>ZA mw W
U O ' O O
O T.
M 4 O
3>
0 4
O O
W Y
O w
ON W>>
ONJW ON4 ONW ONE 4
O O
JJOOW>>@
O MW O
O J
O 8
T w
B 4
1 JF7erw2a B
4@
t 3
3 4
J 3
O O
32
>@WO O.E O
3 O
O M
I.
w w
sw
==
TWBW wO w
I w =O
==W was w
U 4
-4 4h G4JF>w2 (WWu@
4k2 WWI 4>4 w
4 2
lw m3 WmBT3
@O G30>2 33 Q30 3 30 w
E T
) k TO E3 4 0 WE VOOwN TOM T3@
20 JO W
HUkk
- 2 WTEM WZ W
W e 7
A Z waWO
@N WW BO WW O
3 0.OW WWMWT OF N
07 OW C1 w
JW JJkwkUOM EW JO&N Ji Jk J
O 00 U4 wuJUkk UTWM UM U4 U4 W
7 WWd
( UW w
T1 3
T n
a W
@ @ 'A C 2T 000 3
O W
te m77WHONO7 U T id W
W w
2 WOOWO70 w
ik t
W HaQO24Uwd W14 W
Z O
of 44@@ J Tk
@ >wo
@ u
@w
@w N
TW TEWWUA724T SJ Tk e
TT D
7 N
N 32 M OWWW N402 N4 Nk N3 NO O
Ek 4>
W MWAU
@>>W NO E2 E
w
=O N>@WTWW IW w
U MT o
o w=
k N
Nwo I
@U U>
NOW NO N7 NE N>
a f@
S>WW JZ4AWk wW37 14A TAO T@Q mW w
ov o4W Jo 4 7w
=>OO Wo Wow Wo Y
C UBkwaWT 2
4 2
W W
k k
J U
= J
=
ZwNA>
WW
=TW6
>=U w=4
>=4 i
NW W
WOW W472>
WWW dWZ dWM WWW l
w3 WW WW FZu 73MO Fa7T Jk4 JkZ Jkk ao z 4 J rdww ow an>O zdOWs 40 4W 4m.
W4 w oc wCJJBkWa>4F M O 4wJ UOM 003 U07 3 Th
>k w
W aWTO47 m@
w 3
w W
w
@k j
DW W
4WW 4W3tOJW23 W
WWO7=
2'40 TWJ TW7 A
Tw J 3A J343 J
16 AJ J3w i k ds3 d71 d3 ( 4 l
O>
WT JWO JWW4>3kiw1V JW37W Zrd ZWT ZWT3 JS WD 3 @a 3@IWTtw4@C4 3@ Z>2 WWO We*
WWM4 i
U w
S w SM
WT O
O O
O O
O O
O@
k 3
3 3
3 3
3 j
4 7
MW G e 4
4 4
4 4
4 CO k
k
>O
>2 W
7 Y
U i
WJ W
WW 7J aJ l
Im M
V3 i
i UN FC MC s
l 1
4 W
I T
I l
I I
T I
3 T
T T
I I T
T j
O 8
8 8
I I
I O
N P
R m
D n
m I
AC ed M
o@
c@
o o
l O
O@
o or cD o
o o
o B
27 o
4N fN f
A l
O C
T to tw T
e T
WM I
T1 N
NN No t
N N
N i
@ 4 WA
@N
@N l
4 c
I 4 Y WW 1 n%
l
- n A
1 l
Q T l'
M3 4
do to i
4 4
4 m-
--,.s,
- ++
-wm-w--
- + = ' -
D:
O' PAGE 6
dEGION III TRACKING SYSTEM 03/19/87 ddAID=000 - ATTACH *ENT 3 TO ENCLosuwE 1 3/IH/M7 Gk -
STILL OPEN SORT Hf STATUS KEY: 0 l
ITEM RESOLUTION O
ITEM No./
INSPECTOR /
ITEM TYPE /
FACILITV NAME LICENSEE INTERIM INSPECT 04 CLOSE00T RESPONSE 00E MODULE NO.
HRIEF DESCRIPTION DESIGNATED NO. INSPECTION ASSIGNE0 REPORT NO.
6 A56/M30!*-NM GENERIC LETTER BRAIOw000 1 GREGEd STATUS D ISSJE DATE: 0e/01/85 CLOSE0VT
/ /
$p CoddEWCIAL STORAGE AT PwR HX SITES Or Low LEVEL HA WASTE.
b D
6 4
6.
e 6-6 6
6 6.
C r
4 ENCLOSURE 2 Preoperational and Precritical Testing Preoperational testing is approximately 97% complete. The overall status of the test program is listed below:
Total Preoperational Tests........... 95 Tests Started........................
94 Tests Completed......................
93 Tes ts i n Prog res s....................
1 PED Approved.........................
91 Precritical testing is approximately 33% complete. The overall status of the test program is listed below:
Total Precritical Test Procedures.... 32 Total Precritical Test Executions.... 33 Test Started (includes complete)..... 29 Tests Completed......................
25 Tests in Progress (not complete)..... 4 PED Approved..........................
O Preoperational tests started but not yet complete:
Test No.
Test Title DG-50 Diesel Generator 2A Preoperational tests required for low power operation but not yet started Test No.
Test Title VA-11 Auxiliary Building HVAC Post Core Loading Precritical Test Status Tests Complete-VD-30 Heat Capacity Verification for DG Ventilation NR-80 Precritical Checkout, Post-Accident Neutron Monitor PS-32 Chemistry Criteria for Monitoring Water Quality (Mode 5)
EM-80 Thermal Expansion RD-30 Control Rod Drive Mechanism Checkout IT-33 Incore Thermocouples EM-30A Pipe Vibration (Precritical)
FW-33A Main Feedwater
e o
e l
Tests Complete:
(cont'd)
IT-32A Thermal Power Measurement (Precritical)
PS-32 Chemistry Criteria for Monitoring Water Quality (Mode 3)
RC-30 RTD Bypass Loop Flow Verification RC-33 Reactor Coolant System Leak Test RD-31 Rod Control System Checkout RP-30 Reactor Protection Logic l
RY-30 Pressurizer Sprays, Heaters and Bypass Flow Adjustment Tests in Progress:
FH-31 Post-Core Loading Precritical Test Sequence i
FW-32A Thermal Expansion FW (Precritical)
PI-30 PI System Checkout IC-30 Incore Flux Mapping System Checkout RC-31A Reactor Coolant System Flow Coastdown RD-33 Rod Drop Time Measurement Testing Tests not Started:
l LM-30 Reactor Loose Parts Monitor NR-34C Operational Alignment of Excore Nuclear Instrumentation (Prior to Initial Criticality)
RC-32 Reactor Coolant System Flow Measurement VI-80 Heat Capacity Verification Remote Shutdown Area HVAC l
Status of systems turned over for preoperational testing as of February 28, 1987 i
i Total Complete Systems...... 75 l
Total Systems Accepted...... 75 Partial Systems Accepted.... 00 Status of systems accepted for operation:
Total Complete Systems...... 75 Total Systems Accepted...... 71 l
Partial Systems Accepted.... 00 0
Status of deficiencies as of February 28, 1987 l
There are presently 534 open tracking items against operational modes 1-2.
Required for Mode 2......
213 j.
1......
321 TOTAL 534 i
2 i
1 o
l o
i w
ENCLOSURE 3 Construction Status General As of February 28, 1987, the licensee reported the status of construction as 100% complete. System turnover to the Operations Department is on a system basis and is described in Enclosure (2).
i Specific l
Status of Completion of Major Components:
Concrete installation 100.0 Large bore piping installation 100.0 l
Small bore piping installation 100.0 Large bore hanger installation 100.0
]
Small bore hanger installation 100.0 Cable tray installation 100.0 Cable pulls 98.1 l
4 Conduit 100.0 Terminations 98.1 1
Labor Situation l
There are no anticipated craft availability problems.
4 Critical Path Construction Items Fire protection construction and electrical penetration closures are expected j
to be completed in accordance with License Condition 3(c).
j i
i l
i i
l l
t i
4,.,
.~m
y
,_.~,e
-.,r.
.o.e,-.
....-.,,-,-.--,.w.-,.._,-,.r-_
.m.
,,. -,.___m 1..--,,
,yv.
.c,e
s o
ENCLOSURE 4 Status of Inspections Required by MC 2513 and 2514 All modules in the NRC Region III inspection program have been completed except as noted below:
MC 2513 Percent Reason Not Module #
Title Complete Completed 35744 QA Program - Design Changes and Mods 20 Note 1 35746 QA Program - Procurement Control 20 Note 1 35747 QA Program - Receipt, Storage, and Hand 50 Note 1 35749 QA Program - Tests and Experiments 50 Note 1 40301 Safety Committee Activity Inspection 50 Note 1 64703 Fire Prevention / Protection 75 Note 1 70562 RCS Hydrostatic Test Results Eval 70 Note 1 83524 External Exposure Control and Dosimetry 80 Note 1 83525 Internal Exposure Control and Assessment 75 Note 1 83526 Control of Radioactive Materials and Cont 75 Note 1 83527 Facilities and Equipment 90 Note 1 83528 Maintaining Occupational Exposures 40 Note 1 84522 Solid Wastes 30 Note 1 84523 Liquids and Liquid Wastes 30 Note 1 84524 Gaseous Waste System 30 Note 1 84525 Radiological and Chemical Measurements 90 Note 1 92719 SER Review and Followup 75 Note 1 Note 1:
Inspection activity is scheduled or in progress.
It is estimated that the MC 2513 inspection program is approximately 97%
complete at this time.
e a
r b
MC2514 Percent Reason Not i
Mcdule #
Title Complete Completed i
l 72300 Startup Test Procedure Review 50 Note 1 72301 Startup Test Results 00 Note 1 72302 Startup Test Witnessing 00 Note 1 72400 Overall Startup Test Program 80 Note 1 72572 Low Power Test Procedure Review 00 Note 2 1
72576 Power Ascension Test Procedure Review 00 Note 2
]
72578 Power Ascension Test Procedure Review 00 Note 2 72580 Power Ascension Test Procedure Review 00 Note 2 4
72582 Power Ascension Test Procedure Review 00 Note 2
}
72583 Power Ascension Test Procedure Review-00 Note 2 72592 Initial Criticality Witnessing 00 Note 1 f
72596 Precritical Data Review 00 Note 1 72600 Power Level Plateau Data Review (25%)
00 Note 1 72608 Power Level Plateau Data Review (50%)
00 Note 1 72616 Power Level Plateau Data Review (75%)
00 Note 1 72624 Power Level Plateau Data Review (100%)
00 Note 1 TI-2514/01 OL Applicant TMI Inspection Requirements 10 Note 1 Note 1:
Inspection activity is scheduled or in progress.
Note 2:
Inspection activity will be completed prior to initial criticality.
]
The MC 2514 inspection program is 40% complete at this time.
l i
i i
}
i f
2 i
., _ _, _.