ML20205H160

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/86-55 on 860620-0720.No Violations or Deviations Noted
ML20205H160
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/07/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20205H164 List:
References
NUDOCS 8608190737
Download: ML20205H160 (2)


See also: IR 05000400/1986055

Text

.

/

,

.

k

4

.

AUG

7 1986

'

.

Docket No. 50-400

License No. CPPR-158

/ Carolina _ Power and Light Company

ATTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

,

SUBJECT: NRC INSPECTION REPORT N0. 50-400/86-55

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

G. F. Maxwell on June 20 - July 20,1986. The inspection included a review of

activities authorized for your Harris facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

.

'

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violation or deviations were identified.

In accordance with Section 2.7.90 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter,-please contact us.

Sincerely,

gemAtostGNfD *

DyW10-M.'N'86M '

David M. Verrelli, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

NRC Inspection Report

cc w/ encl: (See page 2)

.

8608190737 860207

\\\\

ADOCKOS00go

PDR

AE0

,

a

__

<

-

,

AUG 7 195

Carolina Power and Light Company

2

gc w/ encl:

A. A. Watson, Vice President

/

Harris Nuclear Project

V J. L. Willis, Plant General Manager

/D.L.Tibbitts,Directorof'

Regulatory Compliance

f.cw/ encl:

,

C Barth, ELD

V). Moore, ELD

\\rNRC Resident Inspector

ocument Control Desk

State of North Carolina

RII

i

RI

'

i

oh

en:er

PF dr kson

08/(,/86

08/(9/86

)