ML20205G370

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-443/87-08 on 870219-20 & Notice of Violation
ML20205G370
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/23/1987
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrison R
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20205G376 List:
References
NUDOCS 8703310442
Download: ML20205G370 (2)


See also: IR 05000443/1987008

Text

S,

"

>

..

.

>

.

.

MAR 2 3 1987

Docket No. 50-443

Public Service Company of New Hampshire

ATTN:Mr. Robert Harrison

President and Chief Executive Officer

P. O. Box 330

Manchester, New Hampshire

03105

Gentlemen:

Subject:

Inspection No. 50-443/87-0 8

This refers to the special safety inspection conducted by Mr. W. Lazarus and

another inspector of this office on February 19-20, 1987, of activities authorized

by NRC Construction Permit No. CPPR-135 and License No. NPF-56, and to the

discussion of our findings, presented by Mr. Lazarus to Mr. George Thomas and

other members of your staff at the conclusion of the inspection.

The area examined during this inspection was limited to follow-up of the

circumstances surrounding the classification and reporting of an Unusual Event

on February 11, 1987. Within this area, the inspection consisted of selective

examinations of procedures and representative records; interviews with personnel;

and observations by the inspectors.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This violation has been

categorized by severity level in accordance with the " General Statement of Policy

and Procedure for NRC Enforcement Actions",10 CFR Part 2, Appendix C

(Enforcement Policy 1986). You are required to respond to this letter, and in

preparing your response, you should follow the instructions in Appendix A.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,

OricielSi Wd 37

Thomas T. Martin, Director,

Division of Radiation

Safety and Safeguards

Enclosures:

1.

Appendix A. Notice of Violation

2.

NRC Region 1 Inspection Report No. 50-443/87-0~8

OFFICIAL RECORD COPY

g3310442870323

O

ADOCK 05000443

.

/

t

D

.

.

.

,

.

'

.

.

.

Pubile Service Company of

2

New Hampshire

cc w/encls:

Seabrook Hearing Service List

Ted C. Feigenbaum, Vice President of Engineering

and Quality Programs

William B. Derrickson, Senior Vice President

Warren J. Hall, Regulatory Services Manager

Donald E. Moody Station Manager

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire

Commonwealth of Massachusetts

!

bec w/encis:

Region I Docket Room (wtith concurrences)

Section Chief, DRP

Robert J. Bores, DRSS

l

_

!

'

3h

'

f

s

RI DRSS

R :D SS

RI:DRSS

R :DPSS

Schumacher

Lazarus

Bellamy

Mav8 tin

3//o /87

3//4/87

3/jo/87

3/ /87

OFFICIAL RECORD COPY

,

%

. . .

.

..

_ _ _ _ _

_ _ _ _ _ . _

.-.a