Forwards Insp Repts 50-445/86-22 & 50-446/86-20 on 860701- 0831 & Notices of Violation & Deviation
ML20205C993
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/18/1987
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20205C998 List:
References
NUDOCS 8703300308
Download: ML20205C993 (3)


See also: IR 05000445/1986022

Text

_ _ _

In Reply Refer To:

Dockets:

50-445/86-22

50-446/86-20

W I 81987

Texas Utilities Generating Company

ATTN: Mr. W. G. Counsil

Executive Vice President

400 North Olive

L.B. 81

Dallas, Texas

75201

Gentlemen:-

This refers to the inspection conducted by Mr. I. Barnes an( other members of

the Region IV Comanche Peak Group during July 1 through August 31, 1986, of

activities authorized by NRC Construction Permits CPPR-126 and CPPR-127 for the

Comanche Peak Steam Electric Station, Units 1 and 2, and to the respective

discussion of our findings with you and other members of your staff during the

' inspection period and with Mr. L. D. Nace and other members of your staff at

,

the conclusion of the inspection.

Areas examined during the inspection included Comanche Peak Response Team

activities; onsite procurement, receiving, and storage; and assessment of

allegations. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspectors. These inspection findings

are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2 Title 10 Code of Federal Regulations.

Your response should be based on the specifics contained in the Notice of

Violation enclosed with this letter.

Also during this inspection, it was found that certain of your activities

appeared to deviate from consnitments made to the NRC. These items and

references to the commitments are identified in the enclosed Notice of

Deviation. You are requested to respond to these deviations in writing. Your

,

!

response should be based on the specifics contained in the Notice of Deviation

enclosed with this letter.

Three unresolved items are identified in paragraphs 4.1, 5.a. and 5.1 of the

enclosed inspection report.

e703300300 07o31s

!

PDR

ADOCK 05000445

G

PDR

i

i

'

RIV:CPRT $ 8 DRSP 7 $f

IE

IBarnes:lw

EHJohnson

RLSpessard

J /n, /87

3 /p/87

a Y/87

g

"N W

o\\

e

L

.

Texas Utilities Generating Company

-2-

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

The responses directed by this letter and the accompanying Notices are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980 PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely.

E. H. Johnson, Director

Division of Reactor Safety and

Projects

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - Notice of Deviation

3.

Appendix C - NRC Comanche Peak

Response Team Activities Inspection

Report 50-445/86-22

50-446/86-20

cc:

Texas Utilities Electric Company

ATTN:

G. S. Keeley, Manager

Licensing

Skyway Tower

400 North Olive Street

Lock Box 81

Dallas, Texas

75201

Juanita Ellis

-President - CASE

1426 South Polk Street

Dallas, Texas

75224

Renea Hicks

Assistant Attorney General

Environmental Protection Division

P. O. Box 12548

Austin, Texas

78711-2548

Administrative Judge Peter Bloch

U.S. Nuclear Regulatory Connission

Washington, D.C.

20555

Texas Utilities Generating Company

-3-

Elizabeth B. Johnson

Administrative Judge

Oak Ridge National Laboratory

P. O. Box X. Building 3500

Oak Ridge, Tennessee

37830

Dr. Kenneth A. McCollom

1107 West Knapp

Stillwater, Oklahoma

74075

Dr. Walter H. Jordan

881 Outer Drive

Oak Ridge. Tennessee

37830

Anthony Roissan, Esq.

Executive Director

Trial Lawyers for Public Justic'

2000 P. Street, N.W. Suite 611

Washington, D.C.

20036

Texas Radiation Control Program Director

bectoDMB(IE01)

bcc distrib. by RIV:

  • RPB
  • MIS System
  • RRI-0PS
  • RSTS Operator
  • RRI-CONST
  • R&SPB
  • T. F. Westerman, RSB

DRSP

V. Noonan, NRR

R. Martin, RA

L. Chandler, 0GC

  • RSB
  • RIV File

J. Taylor, IE

  • D. Weiss, RM/ALF

J. Conklin, IE

  • I. Barnes, CPTG
  • Project Inspector
  • R. Hall
  • w/766