ML20205C760
| ML20205C760 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 03/17/1987 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lydon J BOSTON EDISON CO. |
| Shared Package | |
| ML20205C763 | List: |
| References | |
| NUDOCS 8703300254 | |
| Download: ML20205C760 (2) | |
See also: IR 05000293/1987001
Text
.
.
'
MAR 171987
Docket No. 50-293
Boston Edison Company M/C Nuclear
ATTN: Mr. James M. Lydon
Chief Operating Officer
800 Boylston Street
Boston, Massachusetts 02199
Gentlemen:
Subject:
Inspection No. 50-293/87-01
This letter refers to the routine safety inspection conducted by Mr. E. H. Gray of
this office on January 5-9, 1987 at the Pilgrim Nuclear Generating Station.
Mr. Gray discussed the findings of the inspection with Mr. N. Brosee of your
staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, measurements made by the inspector, and
observations by the inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This violation has been
categorized by severity level in accordance with the " General Statement of
Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C
(Enforcement Policy). You are required to respond to this letter within 30
days.
In preparing your response, you should follow the instructions in
Appendix A.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter is appreciated.
Sincerely,
Or! ' i "' m 2 2,, t
Jam :. P. E m -
33%h4870g
Stewart D. Ebneter, Director
g 050
Division of Reactor Safety
G
OFFICIAL RECORD COPY
IR PILGRIM 87-01 - 0001.0.0
g@k
03/16/87
-
- - - -
- -
-
- --- --
-
- - -
-
-
.-
-
-
.
_- -
.
.
. _ -
-
.
.
i
Boston Edison Company M/C Nuclear
2
Enclosure:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report No. 50-7.93/87-01
cc w/ encl:
L. Oxsen, Vice President, Nuclear Operations
Ken Roberts, Station Manager
!
Paul Levy, Chairman, Department of Public Utilities
!
Edward R. MacCormack, Senior Regulatory Affairs and Program Engineer
[
Chairman, Board of Selectmen
Plymouth Civil Defense Director
J. D. Keyes
i
The Honorable E. J. Markey
i
Senator Edward P. Kirby
'
The Honorable Peter V. Forman
Sharon Pollard
Public Document Room (PDR)
!
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
4
Commonwealth of Massachusetts (2)
4
I
bec w/ encl:
Region I Docket Room (with concurrences)
-
-
j
Management Assistant, DRMA (w/o encl)
i
Section Chief, DRP
!
W. Raymond, SRI, Vermont Yankee
T. Shedlosky, SRI, Millstone 1&2
!
H. Eichenholz, SRI, Yankee
O
Re o ts Only
Robert J. Bores, DRSS
J. Wiggins, Chief, DRP Section 18
i
!
I
i
!
}Q :
C/C
RI:DRS
RI:0RS
RI DRS
RI:t)RS
G
Kaplan
Strosnider
Durr
.
02// 9/87
02//V/87
02/20/87
02hi'/87
j
4A
0FFICIAL RECORD COPY
IR PILGRIM 87-01 - 0002.0.0
l
02/18/87
1
i
j
j
.
-
-
- -
-
-
- -
-