ML20205A010

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-413/86-27 & 50-414/86-30 on 860626- 0725 & Notice of Violation
ML20205A010
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/04/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20205A014 List:
References
NUDOCS 8608110286
Download: ML20205A010 (2)


See also: IR 05000413/1986027

Text

%g

.

.

q.

.

.

AUG 04 ngg

'

' Docket Nos. 50-413 and 50-414

License Nos. NPF-35 and NPF-52

.

Duke Power Company

p(TTN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(INSPECTION REPORT NOS. 50-413/86-27 AND 50-414/86-30)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

P. K. Van Doorn and P. H. Skinner from June 26 - July 25,1986. The inspection

included a review of activities authorized for your Catawba f scility. At the

conclusion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities appeared to violate NRC

requirements. The violations, references to pertinent requirements, and elements

to be included in your response are presented in the enclosed Notice of Viola-

tions.

Your attention is invited to the unresolved item identified in the inspection

report. This matter will be pursued during future inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

-

G i

\}\

- - -

MDl - - - _ .

_ _ .

..

'

Du,ke Power Company 2

.

Should you have any questions concerning this letter, please contact us.

Sincerely,

. Original Signed by

Luis A. Reyes /for

-

Roger D. Walker, Director

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

, cc w/encls:

- d. W. Hampton, Station Manager

bcc w/encls:

M C Resident Inspector

Document Control Desk

State of South Carolina

-

.

RII , RII RII

CB ger:cdg [ es VBrownlee

07 8 //86 07/ / /86 0J/(/86

I

-

_ _ _ _ , . . _ _ . - . _ _ - - - - _-

. . _ . . _ _ _ . . . _ . . _ _ _ _ _. _ . . _ _ _ _ . . _ _ _ . _ . , _ . . _ . _ . _ _ _ . . . _