ML20204H118

From kanterella
Jump to navigation Jump to search
Forwards Addl Info Re Mechanical Nozzle Seal Assemblies at Facility,As Committed in Util 990310 & 12 Ltrs.List of Encls Provided
ML20204H118
Person / Time
Site: Waterford, San Onofre  Southern California Edison icon.png
Issue date: 03/23/1999
From: Ewing E
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20204H122 List:
References
W3F1-99-0060, W3F1-99-60, NUDOCS 9903290015
Download: ML20204H118 (6)


Text

7 N

y EntI gy Oper:tions, Inc.

Killona. LA 70066 Tel 504 739 6242 Early C. Ewing, lll

, J a ety & Regulatory Affa:rs W3F1-99-0060 A4.05 PR March 23,1999 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20565

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38

. AdditionalInformation Regarding Mechanical Nozzle Seal Assemblies at Waterford 3 Gentlemen:

By Letter W3F1-99-0043 dated March 10,1999, Entergy submitted a request for Use i' of Mechanical Nozzle Seal Assemblies at Waterford 3. In that request Entergy  ;

committed that the results of the analysis would be provided to the NRC Staff for their review upon completion. This commitment was reiterated in Letter W3F1 '

0048, dated March 12,1999. This was expected to occur by March 31,1999. The analysis has been received, reviewed and approved by the En'.ergy Engineering staff. Attachment A provides the analysis for NRC Staff review.

Should you have any questions concerning this information, please contact me at l (504) 739-6242 or Curt Taylor at (504) 739-6725. '

i Very truly yours, E. C. Ewing Director, Nuclear Safety and Regulatory Affairs a ECE/ CWT /ssf Attachment 9903290015 990323 PDR ADOCK 05000302 P PDR

h i

1 AdditionalInformation Regarding Mechanical Nozzle Seal Assemblies at Waterford 3 l

W3F1-99-0060 '

Page 2 March 23,1999 (w/o Attachment) cc: E.W. Merschoff, NRC Region IV J. Smith N.S. Reynolds IJRC Resident inspectors Office l Administrator Radiation Protection Division l

(State of Louisians)

American Nuclear insurers (w/ Attachment) cc: C.P. Patel, NRC-NRR l

l l

AdditionalInformation Regarding Mechanical Nozzle Seal Assemblies at Waterford 3  ;

W3F1-99-0060 '

Page 3 March 23,1999 (w/o Attachment) i ccMail: J.R. McGaha (M-ECH-65)  !

C.M. Dugger (W-GSB-300) l T.R. Leonard (W-MSB4-300) l R.F. Burski (W-GSB-305)

A.J. Wrape (W-GSB-315)

G.O. Pierce (W-GSB-375)

J.G. Hoffpauir (W-MSB4-336)

E.P. Perkins (W-GSB-318)

C.E. DeDeaux ' (W-GSB-318)

M. K. Brandon (W-GSB-318) ,

R.E. Allen (W-GSB-102)

J.M. O'Hern (W-EEC-650)

S.J. Bethay (M-ECH-66)  !

W.K.Hughey (GGNS-ADM/LIC) ,

J.D. Vandergrift (ANO-GSB/1C) l

- R.J. King (R-SB-15)

A.E. Wemett (W-GSB-318)

(w/ Attachment) bcci Waterford 3 Records Center (W-GSB-100)

Licensing Green Folder File i

I

1 l

1 l

l l

I W3F1-99-0060 r

l ATTACHMENT A  ;

Analysis l

i I

WATERFORD 3 MNSA - DOCUMENT LIST ER-W3-99-0198-00-01 03/23/99 @ l8:05

1. Design Report No. C-PENG-DR-006 Rev.1, Addendum to CENC-1444 (EC-M94 012) includes as attachments:

A. ASME Code Year Reconciliation i B. ABB CENP Calculation C-PENG-CALC-018 Rev. 00, " Analysis of Waterford Unit 3 Hot Leg Sampling MNSA."

C. ABB CENP Calculation C-PENG-CALC-019 Rev. 00, " Analysis of Waterford Unit 3 Hot Leg PDT MNSA."

D. ABB CENP Caiculation C-PENG-CALC-020 Rev. 00, " Analysis of Waterford Unit 3 Hot Leg RTD MNSA."

E.ABB CENP Document No. A-WATERFD-9449-1213 Rev. 00,

" Evaluation of attachment Locations for MNSA of Waterford Unit 3 Partial Penetration Welded Nozzles in Hot Leg Piping."

i

2. MNSA SQRT File SQ-MN-347 includes as attachments: I A. ABB CENP Engineering Report No. C-NOME-ER-0120, Rev 1 " Design Evaluation of MNSA for Various Applications at Waterford 3"
8. ABB CENP Calculation C-NOME-CALC-0107, Rev 0, " Seismic Qualification of Hot Leg RTD, Hot Leg PDT and Hot Leg Sampling ,

MNSA Hardware," l C. ABB CENP Calculation S-PENG-CALC-008, Rev 00, " Nozzle Loads ,

for which Bottom Mounted PZR MNSA was Qualified" D. ABB CENP Calculation C-PENG-CALC-021 Rev. 00, " Determination f Waterford 3 Hot Leg Seismic Response Spectra & Accelerations for Use in the Analyses of MNSAs." ,

E ABB CENP Test Report TR-PENG-033 Rev. 00," Seismic Qualification of the San Onofre, Units 2 and 3 MNSA Clamps for Pressurizer instrument Nozzles and RTD Hot Leg Nozzles" F. ABB CENP Calculation S2-NOME-CALC-0085 Rev 00," Seismic Qualification of Steam Generator PDT, Hot Leg PDT and Hot Leg Sampling MNSA Hardware" l G. ABB CENP Test Report TR-PENG-042 Rev. 00, "MNSA Hydrostatic l and Thermal Cycle Test" l

CEdoclistl. DOC 1of2

l WATERFORD 3 MNSA - DOCUMENT LIST ER-W3 99-0198-00-01 03/23/99 @ l8:05

3. ABB CENP Document No. C-NOME-SP-0067, Rev 2, " Design Specification for MNSA at Waterford Unit 3" 5817-12148 Attached to ER-W3-99-0198-00-01
4. ABB CENP Letter No. NOME-99-C-0123 March 18,1999 " Volume and Surface Area Calculation" Attached to ER-W3-99-0198-00-01
5. ABB CENP Letter No. NOME-99-C-0124 March 18,1999, March 22, 1999 Rev. 2 " Corrosion issues Associated with the Installation of MNSAs on Leaking Hot Leg Nozzles at Waterford" Attached to ER-W3-99-0198-00-01
6. ABB CENP Drawing E-MNSAWFD-228-001 Rev. 03," Hot Leg RTD MNSA Flat" 5817-12142 Part of ER-W3-99-0198-00-01
7. ABB CENP Drawing E-MNSAWFD-228-002 Rev. 03, " Hot Leg PDT MNSA" 5817-12143 Part of ER-W3-99-0198-00-01
8. ABB CENP Drawing E-MNSAWFD-228-003 Rev. 03, " Hot Leg Sampling MNSA" 5817-12141 Part of ER-W3-99-0198-00-01
9. ABB CENP Document No. C-NOME-EP-0189, Rev 1, " Engineering Procedure for the Installation of the MNSA for Waterford 3" Attached to WA# 01177163 & 0177164
10. AEB CENP Document No. STD-100-237, Rev. 00, " Procedure for the Modifit.ition of RCS Pressure Boundary for the Installation of MNSAs for Waterfc d Unit 3"" Attached to WA# 01177163 & 0177164 l

l CEdcclisti. DOC 2 of 2