ML20204F478
Letter Sequence Other | |
---|---|
TAC:63937, (Approved, Closed) | |
Administration Results Other: LD-87-013, Informs That CESEC-III Computer Code Applicable to Analysis of FSAR Chapter 14 Events (Excluding ATWS) for Facility. Models Included in Code Applicable to Operating Conditions at Plant & Cover All Features of Facility NSSS, ML20093K990, ML20134N012, ML20204F478, ML20204F585, ML20204F631, ML20205D780, ML20206A626, ML20206K125, ML20206K572, ML20207P678, ML20209G723, ML20211M517, ML20211M527, ML20214H464 | |
MONTHYEARML20093K9901984-10-0808 October 1984
[Table View]Submits Addl Info Re CESEC-III Code for Reload Core Analysis Methodology,Per 840511 Request.Code Applicable to Facility Due to Digital Simulation of C-E PWR NSSS Project stage: Other ML20134N0121985-08-20020 August 1985 Advises That Util 850613 Submittal of Rev 1 to OPPD-NA-8301-P, Reload Core Analysis Methodology Overview Will Be Withheld from Public Disclosure,Per 10CFR2.790 Project stage: Other ML20214H4641986-11-17017 November 1986 Forwards Proprietary Rev 2 to OPPD-NA-8301-P, Omaha Public Power District Nuclear Analysis Reload Core Analysis Methodology Overview, Incorporating Methodology Changes for Cycle 11.Rept Withheld (Ref 10CFR2.790(b)(1)).Fee Paid Project stage: Other ML20211M5271986-11-30030 November 1986 Partially Withheld Nonproprietary Omaha Batch M Reload Fuel Design Rept (Ref 10CFR2.790) Project stage: Other ML20211M5171986-12-15015 December 1986 Forwards CEN-347(O)-NP & CEN-347(O)-P, Omaha Batch M Reload Fuel Design Rept, Re Core Reload Methodology Changes for Cycle 11,per D Sells Request.Proprietary Version Withheld (Ref 10CFR2.790(b)(1)).Affidavit Also Encl Project stage: Other ML20207J7061986-12-22022 December 1986 Forwards Request for Addl Info Re Util 861117 Submittal on Core Reload Methodology.Info Requested by 870130 to Meet Schedule for Cycle 11 Reload.Need for Receipt of Reload Amend Application by 870130 Emphasized Project stage: RAI ML20207P6781987-01-14014 January 1987 Advises That CEN-347(0)-P, Omaha Batch M Reload Fuel Design Rept, Contains Trade Secrets or Proprietary Commercial Info & Will Be Withheld from Public Disclosure Per 10CFR2.790 Project stage: Other ML20209G7231987-01-26026 January 1987 Forwards Rev 1-P to CEN-347(O)-P Omaha Batch M Reload Fuel Design Rept, & Responses to Cycle 11 Core Reload Methodology Change Questions for Review.Affidavit Also Encl. Rept Withheld (Ref 10CFR2.790) Project stage: Other LD-87-013, Informs That CESEC-III Computer Code Applicable to Analysis of FSAR Chapter 14 Events (Excluding ATWS) for Facility. Models Included in Code Applicable to Operating Conditions at Plant & Cover All Features of Facility NSSS1987-02-27027 February 1987 Informs That CESEC-III Computer Code Applicable to Analysis of FSAR Chapter 14 Events (Excluding ATWS) for Facility. Models Included in Code Applicable to Operating Conditions at Plant & Cover All Features of Facility NSSS Project stage: Other ML20212N0151987-03-0909 March 1987 Forwards Proprietary & Nonproprietary Revised Reload Methodology Overview Repts,Incorporating Comments & Correcting Typos.Application for Withholding Proprietary Repts (Ref 10CFR2.790) Encl Project stage: Request ML20204F3931987-03-18018 March 1987 Forwards Corrected Pages to Proprietary & Nonproprietary Revs to Core Reload Methodology Changes for Cycle 11, Correcting Typos.Application for Withholding Proprietary Repts (Ref 10CFR2.790) Encl Project stage: Request ML20204F4781987-03-18018 March 1987 Errata to Rev 2 to Reload Core Analysis Methodology Overview Project stage: Other ML20204F5851987-03-18018 March 1987 Errata to Rev 1 to Neutronics Design Methods & Verification Project stage: Other ML20204F6311987-03-18018 March 1987 Errata to Rev 1 to Reload Core Analysis Methodology Overview Project stage: Other ML20205D7801987-03-23023 March 1987 Forwards Proprietary Info on Cycle 11 Core Reload Methodology,Including List of CESEC-III Basedeck Input Data descriptions,plant-specific Model Values & Specific Input Data.Info Withheld (Ref 10CFR2.790(b)(1)) Project stage: Other ML20206A6261987-03-30030 March 1987 Advises That Proprietary Rev 1-P to CEN-347 (O)-P, Omaha Batch M Reload Fuel Design Rept, Will Be Withheld (Ref 10CFR2.790),per 870126 Request & C-E 870126 affidavit.C-E Reasons for Withholding Document from Public Listed Project stage: Other ML20206G8671987-04-0303 April 1987 Safety Evaluation Re 861117,870126,0309 & 18 Ltrs Concerning Changes to Listed Reload Core Methodology Repts for Cycle 11.Changes Acceptable Project stage: Approval ML20206G8511987-04-0303 April 1987 Forwards Safety Evaluation Re 861117,870126,0309 & 18 Ltrs Concerning Changes to Listed Reload Core Methodology Repts for Cycle 11.Changes Acceptable Project stage: Approval ML20206K1251987-04-14014 April 1987 Informs That 861117 & 870309 Requests for Withholding Identified Documents from Public Disclosure Granted Project stage: Other ML20206K5721987-04-15015 April 1987 Notifies of Determination That Util CESEC-Code Basedeck Listing Should Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended,In Response to Util 870323 Request & Supporting Affidavit Project stage: Other 1987-01-26 |
ML20204F478 | |
Person / Time | |
---|---|
Site: | Fort Calhoun ![]() |
Issue date: | 03/18/1987 |
From: | OMAHA PUBLIC POWER DISTRICT |
To: | |
Shared Package | |
ML19292G995 | List: |
References | |
OPPD-NA-8301-NP-R02E, OPPD-NA-8301-NP-R2E, TAC-63937, NUDOCS 8703260200 | |
Download: ML20204F478 (1) | |
Similar Documents at Fort Calhoun | |
---|---|
Category:FUEL CYCLE RELOAD REPORTS
MONTHYEARML20216E6431999-08-26026 August 1999
[Table view]Rev 19 to TDB-VI, COLR for FCS Unit 1 ML20216E6361999-07-21021 July 1999 Rev 18 to TDB-VI, COLR for FCS Unit 1 ML20249C5691998-04-22022 April 1998 Rev 17 to TDB-VI, COLR for Fort Calhoun Station,Unit 1, Updating Cycle 18 Operations ML20249C5651998-03-30030 March 1998 Rev 16 to TDB-VI, COLR for Fort Calhoun Station,Unit 1, Updating Cycle 18 Boron Concentration on Page 8 of 17 ML20217G2571998-03-13013 March 1998 Rev 15 to Cycle 17 COLR, Updating Section 4.0 to Reduce Max Core Inlet Temp for Remainder of Cycle 17 Operations to Not Exceed 540 F ML20217G2491998-02-28028 February 1998 Rev 14 to Cycle 17 COLR, Revising COLR Peaking Factors to Ensure Appropriate Conservatism Is Applied ML20217Q5421997-08-13013 August 1997 Rev 13 to Colr ML20135A6581996-11-13013 November 1996 Rev 12 to COLR, Updating Cycle 17 Operations ML20135A6541996-08-27027 August 1996 Rev 11 to COLR, Updating COLR Figures 4,5,6,7A & 8 to Reflect New LCO & LSSS ML20116B6901996-07-10010 July 1996 Rev 10 to Colr ML20094D3021995-10-0606 October 1995 Rev 9 to Core Operating Limit Rept, Adding Figure, Axial Power Distribution LSSS for 4 Pump Operation ML20107H6281995-10-0606 October 1995 Corrected Rev 9 to Core Operating Limit Rept, Adding Figure to COLR for Axial Power Distribution LSS for 4 Pump Operation ML20082M4971995-04-0404 April 1995 Rev 8 to COLR, Updating COLR to Reflect Cycle 16 Setpoints & Restrictions Defined in EA-FC-95-009,Rev 0 Cycle 16 Setpoints & COLR ML20082M4791995-03-20020 March 1995 Rev 7 to COLR, Revising Refueling Boron Concentration ML20080F6601995-01-20020 January 1995 Cycle 16 Reload Evaluation Rept, for FCS Unit 1 ML20070P3721994-05-31031 May 1994 Reload Core Analysis Methodology Overview ML20059H7411993-11-22022 November 1993 Rev 6 to COLR, Reflecting Cycle 15 Operating Conditions ML20059H7351993-10-23023 October 1993 Rev 5 to COLR, Updating Min Boron Concentration to 1900 to Reflect Core Changes Prior to Cycle 15 Operation ML20046A0831993-07-19019 July 1993 Omaha Public Power District Fort Calhoun Station Unit 1 Cycle 15 Reload Evaluation. ML20045E0541993-06-25025 June 1993 Nonproprietary Revised Pages of Rev 5 to Reload Core Analysis Methodology Overview. ML20138D3091993-01-31031 January 1993 Nonproprietary OPPD Nuclear Analysis,Reload Core Analysis Methodology Overview ML20128C1981992-12-17017 December 1992 Rev 4 to COLR, Allowing Increase in Operating Space for DNB-LCO Monitoring W/O Requiring Use of Basss ML20128C1941992-11-16016 November 1992 Rev 3 to COLR Reflecting Increase in Allowable Peak Linear Heat Rate in COLR from 14.4 Kw/Ft to 15.5 Kw/Ft Until 7770 Mwd/Mtu ML20118A3931992-08-17017 August 1992 Rev 2 to Fort Calhoun Station Cycle 14 Core Operating Limits Rept ML20099B4501992-06-28028 June 1992 Rev 1 to Fort Calhoun Station Cycle 14,Core Operating Limits Rept ML20096G4061992-04-25025 April 1992 Core Operating Limit Rept ML20086F4451991-11-27027 November 1991 Cycle 14 Reload Evaluation ML20073H2521991-04-30030 April 1991 Rev 4 to Nuclear Analysis Reload Core Analysis Methodology Overview ML20073H2641991-03-31031 March 1991 Rev 3 to Omaha Public Power District Nuclear Analysis Reload Core Analysis Methodology - Transient & Accident Methods & Verification ML19354E6951990-01-26026 January 1990 Reload Evaluation Rept for Fort Calhoun Station Unit 1, Cycle 13. ML20154H6551988-04-30030 April 1988 Rev 2 to Nuclear Analysis Reload Core Analysis Methodology, Transient & Accident Methods & Verification ML20154H6351988-04-30030 April 1988 Rev 2 to Nuclear Analysis Reload Core Analysis Methodology, Neutonic Design Methods & Verification ML20153E1711988-04-30030 April 1988 Rev 3 to Nuclear Analysis Reload Core Analysis Methodology Overview ML20149F7181988-01-31031 January 1988 Rev 0 to Extended Burnup Rept for Fort Calhoun Reloads XN-4 & XN-5 (Batches K & L) ML20204F4781987-03-18018 March 1987 Errata to Rev 2 to Reload Core Analysis Methodology Overview ML20204F6311987-03-18018 March 1987 Errata to Rev 1 to Reload Core Analysis Methodology Overview ML20212N0211986-11-30030 November 1986 Rev 2 to Reload Core Analysis Methodology Overview ML20212N0271986-11-30030 November 1986 Rev 1 to Reload Core Analysis Methodology Overview ML20212N0321986-11-30030 November 1986 Rev 1 to Reload Core Analysis Methodology Overview ML20211M5271986-11-30030 November 1986 Partially Withheld Nonproprietary Omaha Batch M Reload Fuel Design Rept (Ref 10CFR2.790) ML20082D8401983-11-30030 November 1983 Nonproprietary Version of Statistical Combination of Uncertainties, Parts 1,2 & 3 ML20078D9481983-09-30030 September 1983 Reload Core Analysis Methodology Overview 1999-08-26 Category:TEXT-SAFETY REPORT MONTHYEARML20217B5401999-10-0606 October 1999
[Table view]Safety Evaluation Supporting Amend 193 to License DPR-40 ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data LIC-99-0096, Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With ML20211J9321999-09-0202 September 1999 Safety Evaluation Concluding That Licensee Proposed Alternatives Provide Acceptable Level of Quality & Safety. Proposed Alternatives Authorized for Remainder of Third ten- Yr ISI Interval for Fort Calhoun Station,Unit 1 LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With ML20216E6431999-08-26026 August 1999 Rev 19 to TDB-VI, COLR for FCS Unit 1 ML20210R1961999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fcs,Unit 1 ML20210G2181999-07-27027 July 1999 Safety Evaluation Supporting Amend 192 to License DPR-40 ML20210D9951999-07-22022 July 1999 Safety Evaluation Supporting Amend 191 to License DPR-40 ML20216E6361999-07-21021 July 1999 Rev 18 to TDB-VI, COLR for FCS Unit 1 ML20210R2081999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Fcs,Unit 1 LIC-99-0065, Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20210P5461999-06-0808 June 1999 Rev 0,Vols 1-5 of Fort Calhoun Station 1999 Emergency Preparedness Exercise Manual, to Be Conducted on 990810. Pages 2-20 & 2-40 in Vol 2 & Page 4-1 in Vol 4 of Incoming Submittal Not Included ML20195B4581999-05-31031 May 1999 Rev 3 to CE NPSD-683, Development of RCS Pressure & Temp Limits Rept for Removal of P-T Limits & LTOP Requirements from Ts ML20207H7401999-05-31031 May 1999 Performance Indicators Rept for May 1999 LIC-99-0053, Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 11999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 1 ML20195B4521999-05-17017 May 1999 Technical Data Book TDB-IX, RCS Pressure - Temp Limits Rept (Ptlr) ML20206L4241999-05-10010 May 1999 Safety Evaluation Supporting Corrective Actions to Ensure That Valves Are Capable of Performing Intended Safety Functions & OPPD Adequately Addressed Requested Actions Discussed in GL 95-07 ML20206M2601999-05-0606 May 1999 SER Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & IPEEE Results Reasonable Given FCS Design,Operation & History LIC-99-0047, Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With ML20195E8621999-04-30030 April 1999 Performance Indicators, for Apr 1999 ML20205Q5831999-04-15015 April 1999 Safety Evaluation Supporting Amend 190 to License DPR-40 ML20210J4331999-03-31031 March 1999 Changes,Tests, & Experiments Carried Out Without Prior Commission Approval for Period 981101-990331.With USAR Changes Other than Those Resulting from 10CFR50.59 ML20206G2641999-03-31031 March 1999 Performance Indicators Rept for Mar 1999 LIC-99-0034, Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With ML20205J8181999-02-28028 February 1999 Performance Indicators, for Feb 1999 LIC-99-0025, Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With ML20207F3291999-01-31031 January 1999 FCS Performance Indicators for Jan 1999 ML20203B0991998-12-31031 December 1998 Performance Indicators for Dec 1998 LIC-99-0026, 1998 Omaha Public Power District Annual Rept. with1998-12-31031 December 1998 1998 Omaha Public Power District Annual Rept. with LIC-99-0003, Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With ML20198S3771998-12-31031 December 1998 Safety Evaluation Supporting Amend 189 to License DPR-40 ML20198S4831998-12-31031 December 1998 Safety Evaluation Supporting Amend 188 to License DPR-40 ML20196G2251998-12-18018 December 1998 Rev 2 to EA-FC-90-082, Potential Over-Pressurization of Containment Penetration Piping Following Main Steam Line Break in Containment ML20198M3141998-11-30030 November 1998 Performance Indicators Rept for Nov 1998 LIC-98-0172, Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0160, Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated1998-11-25025 November 1998 Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated ML20203B0721998-11-16016 November 1998 Rev 6 to HI-92828, Licensing Rept for Spent Fuel Storage Capacity Expansion ML20196E4981998-10-31031 October 1998 Performance Indicators Rept for Oct 1998 ML20196G2441998-10-31031 October 1998 Changes,Tests & Experiments Carried Out Without Prior Commission Approval. with USAR Changes Other than Those Resulting from 10CFR50.59 LIC-98-0154, Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With ML20154M4881998-10-19019 October 1998 Safety Evaluation Supporting Amend 186 to License DPR-40 ML20154N2411998-10-19019 October 1998 Safety Evaluation Supporting Amend 187 to License DPR-40 LIC-98-0136, Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With ML20155G4261998-09-30030 September 1998 Performance Indicators for Sept 1998 ML20154A1251998-08-31031 August 1998 Performance Indicators, Rept for Aug 1998 LIC-98-0122, Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With ML20238F7231998-08-17017 August 1998 Owner'S Rept for Isis ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency 1999-09-30 |
Text
O V
- TABLE 2 ,
COMPARISONS BETWEEN TORC AND CETOP-D Axial Elev.
Operating Parameters MDNBR Quality at MDNBR of MDNBR (in)
Detailed CETOP-D Detailed CETOP-D TORC Inict TORC Inlet w Inlet Avg Mass Core Avg. Shape Relative Flow Relative Flow Pressure Temperature Velocity Heat Flux Index Flow in Factor Flow in Factor Detailed (psia) *F (BTU /hr-ft2) (ASI) location 5 [ ] Location 5 [ ] TORC CETOP (106 lbm/hr-ft2)
~
1750 450 1.7432 242409 .517 2100 450 1.7432 257008 .517 2250 450 1.7432 261195 .517 2400 450 1.7432 264118 .517 2100 545 2.1790 216494 .517 1750 600 1.7432 149283 .206 2100 600 1.7432 168727 .206 2250 600 1.7432 176398 .206 2400 600 1.7432 184260 .206 2100 545 2.1790 257118 .206
! 2100 545 2.1790 282778 .004 2100 545 2.1790 298644 .203 l
1750 450 1.7432 295262 .527
) 1750 545 1.7432 227063 .527
! 1750 600 1.7432 147319 .527 2100 545 2.1790 255014 .527 D 3260200 870M 8 i P OPPD-NA-8301-NP ADOCK 05900285 PDR Rev. 02 Page 9 of 28 ,
4
, - _