-4 RH4 REV 11 AP-250
(^\
(J l RADIATION HONITOR ACTUATION 1.0 ENTRY CONDITIONS J.E any of the following Atmospheric Radiation High alarms are actuated:
- RM-Al GAS
- RM-A2 GAS
- RM-A3
- RM-A4
- RM-A5 GAS
- RM-A5 IODINE THEN use this procedure.
2.0 IMMEDIATE ACTIONS NOTE There are no immediate actions for this procedure.
l I
l J
l 9903240244 990310 '4 PDR ADOCK 05000302 .
F PDR u 7)/ '
' ) Approved by MNPO 4 7 d.eId I% ate I'7-7[
(SIGNATURE ON FILE)
AP-250 PAGE 1 of 37 RMA l
e-J
. e i
G' i
l I t
BLANK PAGE
\ O l
I i
1 O
AP-250 REV 11 PAGE 2 of 37 RMA i
1 3.0 FOLLOW UP ACTIONS
< ~s
- i. ,) ACTIONS DETAILS 3.1 Ensure auto actions of affected radiation .
monitor (s). I See Table 1 3.2 Notify personnel of piant
- STA conditions.
- Plant Operators l
- NSM (evaluate plant conditions for poteni.ial entry into the Emergency Plan) 1 3.3 Ensure proper radiation 1 Ensure radiation monitor is l monitor operation. energized.
l
[}s' 2 Ensure " ALARM RESET OPERATE CHECK SOURCE" switch is selected to "0PERATE" position. ,
3 Ensure high alarm setpoint is set per the applicable requirements: )
Release Permit Radiation Monitor Setpoint Log 4 IF radiation monitor is BTfscalehig'h.
THEN ensure RANGE" switch is selected to "1M" position.
5 Observe trends on other radiation monitors, as l applicable. l l
3.4 Notify Health Physics and Chemistry of radiation
, monitor actuation.
(v )
AP-250 REV 11 PAGE 3 of 37- RMA
)
O BLANK PAGE O
AP-250 REV 11 PAGE 4 of 37 RMA
3.0 FOLLOW UP ACTIONS (CONT'D) 1 ACTIONS DETAILS 3.5 IF alarm is not valid. 1 Depress " HORN SILENCE" push button for TilEN perform corrective affected radiation monitor.
actions.
2 IE radiation level is below high setpoint.
AND radiation monitor is operable, s TiiEN GO T0 the appropriate enclosure i in this procedure: !
I Radiation Enclosure Monitor RM-Al GAS Enclosure 1. RM-Al GAS Actions.
Step 1.4 1
RM-A2 GAS Enclosure 2. RM-A2 l GAS Actions.
Step 2.4 RM-A3 Enclosure 3. RM-A3 Actions. Step 3.2 RM-A4 Enclosure 4. RM-A4 Actions. Step 4.1 RM-A5 Enclosure 5. RM-A5 GAS / IODINE GAS / IODINE Actions.
Step 5.6 3 Initiate repair efforts as required.
4 EXIT this procedure.
AP-250 REV 11 PAGE 5 of 37 RMA
I O
i BLANK PAGE g
I l
I
)
Ol -
i l
AP-250 REV 11 PAGE 6 of 37 RMA
3.0 F0LLOW UP ACTIONS (CONT'D) I ACTIONS DETAILS 3.6 Evacuate affected areas, 1 Determine evacuation requirements of as required. affected area based on the following:
Radiation levels Location Work being performed Health Physics input 2 IF evacuation is required.
TREN perform the following in order:
Depress appropriate 3
evacuation alarm push button.
Notify plant personnel over PA.
( Repeat'PA announcement.
i 3.7 Stop any activities
! suspected of causing the radiation monitor L.
actuation and restore systems as required.
l v
1 l
J l
i O
AP-250 REV 11 PAGE 7 of 37 RMA om..
, l O
BLANK PAGE O
AP-250 REV 11 FAGE 8 of 37 RW.
o 3.0 FOLLOW UP ACTIONS (CONT *D)
) ACTIONS DETAILS 3.8 CONCURRENTLY PERFORM the a)propriate enclosures in Radiation Enclosure tus procedure. Monitor RM-Al GAS Enclosure 1. RM-Al GAS Actions. Step 1.1 RM-A2 GAS Enclosure 2. RM-A2 GAS Actions. Step 2.1 RM-A3 Enclosure 3. RM-A3 Actions. Step 3.1 RM-A4 Enclosure 4. RM-A4 Actions. Step 4.1 RM-A5 Enclosure 5. RM-A5 GAS / IODINE GAS / IODINE Actions.
Step 5.1 O
l i
AP-250 REV 11 PAGE 9 of 37 RMA I
O BLANK PAGE O
l l
O1 AP-250 REV 11 PAGE 10 of 37 RMA
1 3.0 FOLLOW UP ACTIONS (CONT *D)
O ac'io"s oeTaits STATUS An RMA has been reset.
3.9 WHEN all of the following 1 Ensure 1 CC exhaust fan is running:
are reset:
AHF-20A RM-Al GAS AHF-20B RM-A2 GAS 2 Start AHF-30 RM-A3 3 Notify Health Physics of AB RM-A4 ventilation restoration.
RM-A5 GAS 4 Ensure both AB supply fans are RM-A5 I0 DINE AMF-11A l THEN restore ventilation.
AHF-11B 5 Start AHF-10 3.10 EXIT this. procedure.
l o
i AP-250 REV 11 PAGE 11 of 37 RMA I l
J 1
O BLANK PAGE g
O AP-250 REV 11 PAGE 12 of 37 Ri%
(.
5.0 ENCLOSURE 1 RM Al GAS ACTIONS i ACTIONS DETAILS 1.1 Stop RB purge fans. 1 Stop RB purge supply fans:
AHF-6A AHF-6B 1
2 Stop RB purge exhaust fans:
AHF-7A AHF-7B 1.2 IF RM-Al GAS indicates or
- 1 Select "RMA 1 MID/HI RANGE a broaches off-scale high. CONTROLLER" to "AUT0".
TEN align RM-Al LMH valve controller. 2 IF TSC is manned.
TREN notify Accident Assessment Team of RM-Al status.
O 1.3 -LF main RB purge was
- Notify Health' Physics Supervisor terminated, that purge is stopped.
THEN perform compensatory actions.
- Notify NSM to ensure equipment ,
hatch is closed. l
- Notify PPO to ensure at least 1 personnel air lock door or temporary door is closed (Health Physics and Security may be required).
- Notify SP0 to ensure purge heaters are de-energized (480V SWGR Room):
480V HEATING AUX BUS 3-3A "AHHE-16A A RB Purge Heating Coil" 480V HEATING AUX BUS 3-4A "AHHE-16B B RB Purge Heating Coil" ,
I AP-250 REV 11 PAGE 13 of 37 RMA !
1 l
O<
BLANK PAGE O
O AP-250 REV 11 PAGE 14 of 37 RMA j a
5.0 ENCLOSURE 1 RM Al GAS ACTIONS (CONT'D)
(~.,
() ACTIONS DETAILS 1.4 WHEN radiation monitor can 1 Select RM-Al GAS to be reset. " ALARM RESET" THEN reset monitor.
2 Ensure RM-Al " HORN SILENCE" is reset.
3 Ensu e "RMA 1 MID/HI RANGE CONTR011.ER" is in " MAN" 1.5 IERBpurgerestorationis
- OP-417. Containment Operating required, Procedure:
THEN see the appropriate plant procedure. Section 4.5, Reactor Bldg Purge Section 4.7, RB Pressure Equalization / Mini-Purge Under Non-Accident Conditions EM-225A Post Accident RB grogenControl,asdirectedby 1
1.6 GO TO Step 3.9 in this procedure.
l I
q
%; )
AP-250 REV 11 PAGE 15 of 37 RMA L
l 1
O l
1 l
BLANK PAGE e
AP-250 REV 11 PAGE 16 of 37 RMA
5.0 ENCLOSURE 2 RM A2 GAS ACTIONS
/T
() ACTIONS DETAILS 2.1 Ensure AHF-34A is stopped.
- Observe Events Recorder point 515
" HOT MACHINE SHOP WELDING HOOD EXH !
FAN" in " TRIP".
CAUTION If WGDTs are leaking into AB, hydrogen concentrations may reach explosive levels.
- Ensure WGDT outlet valves are closed evacuated. (95 ft AB Rad Waste or Remote THEN notify PPO to isolate Panel):
WG system. l WDV-436 i
WDV-437 7 WDV-438 i
- Ensure WG header to vent valves are closed:
WDV-489"SWSurkeTankVentto WG Iso" (95 ft B Sea Water Room above DCT-1B)
WDV-337 "ECST Vent to WG Iso" (143 ft AB behind WDT-10A) 2.3 IE RM-A2 GAS indicates or 1 Select "RMA 2 MID/HI RANGE anroaches off-scale high, CONTROLLER" to "AUT0".
TEN align RM-A2 LMH valve controller. 2 IF TSC is manned, THEN notify Accident Assessment Team of RM-A2 status.
(3
%.)
AP-250 REV 11 PAGE 17 of 37 RMA
O l
BLANK PAGE O
AP-250 REV 11 PAGE 18 of 37 RMA
5.0 ENCLOSURE 2 RM A2 GAS ACTIONS (CONT'D)
(r
() ACTIONS DETAILS 2.4 WHEN radiation monitor can 1 Select RM-A2 GAS to be reset. " ALARM RESET".
THEN reset monitor.
2 Ensure RM-A2 " HORN SILENCE" is reset.
3 Ensure "RMA 2 MID/HI RANGE CONTROLLER" is in " MAN" 2.5 Ensure 1 train of AB .
A Train exhaust fans are running. B Train AHF-14A AHF-14B AHF-14C AHF-14D i
(T 2.6 Start 1 penetration C1 cooling fan. AHF-9A AHF-9B 2.7 IF AHU-3 restart is
- Notify SPD to start "AHU-3 HOT desired, MACHINE SHOP COOLING UNIT FAN" THEN start AHU-3 (119 ft Cold Machine Shop mezzanine MACHINE SHOP MCC 3 cubicle -30).
4 2.8 IF AHF-34A restart is
- Notify PPO to start AHF-34A " HOT desired. MACH. SHOP WELD. HOOD EXH. FAN" THEN start AHF-34A (119 ft AB Hot Machine Shop).
2.9 GO TO Step 3.9 in this procedure.
o AP-250 REV 11 PAGE 19 of 37 RMA
O BLANK PAGE g
l l
O' AP-250 REV 11 PAGE 20 of 37 RMA
p.
[,:
~"
5.0 ENCLOSURE 3 RM A3 ACTIONS ACTIONS DETAILS 3.1- IF AB has NOT been
- Notify PP0 to verify closing air evacuated. pressure is > 17 psig on AH-825-PI THEN verify dampers D 29 "D 29 D 36 AIR TO CLOSE" and D 36 are closed. (143 ft AB Panel-15AB).
1 3.2 WHEN radiation monitor can 1 Select RM-A3 to " ALARM RESET".
be reset.
THEN reset monitor. 2 Ensure RM-A3 " HORN SILENCE" is reset.
L 3.3 Ensure 1 train of AB .
L exhaust fans are running. A Train B Train AHF-14A AHF-14B AHF-14C AHF-14D O ,
3.4 GO TO Step 3.9 in this
. procedure.
I.
l O '
i AP-250- REV 11 PAGE 21 of 37 RMA-(' .
O BLANK PAGE O
I i
1 i
l l
l l
el AP-250 REV 11 PAGE 22 of 37 RMA
____________________________________ n
F l '.
i 5.0 ENCLOSURE 4 RM A4 ACTIONS
' yy
() ACTIONS DETAILS 4.1 WHEN radiation monitor can 1 Select RM-A4 to " ALARM RESET" be reset.
THEN reset monitor. 2 Ensure RM-A4 " HORN SILENCE" is reset.
4.2 Ensure 1 train of AB exhaust fans are running. A Train B Train 1
AHF-14A AHF-14B AHF-14C AHF-140 4.3 60 TO Step 3.9 in this procedure.
/D U
l f
I s s
N ,y AP-250 REV 11 PAGE 23 of 37 RMA l
I
hI BLANK PAGE O
AP-250 REV 11 PAGE 24 of 37 RMA
5.0 ENCLOSURE 5 RM-A5 GAS / IODINE ACTIONS ACTIONS DETAILS NOTE Chemistry Lab exhaust fans can operate while RM A5 GAS / IODINE is actuated when CC exhaust fan is running in slow speed.
5.1 IF CC exhaust fans are sto) ped. AHF-30 THE1 ensure Chemistry Lab fans are stopped. AHF-44A AHF-44B CAUTION With all CC ventilation stopped, the CC may reach its design limit of 95*F in 30 minutes.
O 5.2 Establish CC ventilation 1 Verify AHD-3 is open.
in emergency recirc.
2 Ensure 1 CC emergency supply fan is running:
AHF-18A AHF-18B 3 Ensure 1 CC return fan is running:
AHF-19A
_ _ AHF-19B (q
) 1 AP-250 REV 11 PAGE 25 of 37 RMA
O BLANK PAGE g
i i
O AP-250 REV 11 PAGE 26 of 37 RMA
5.0 ENCLOSURE 5- RM A5 GAS / IODINE ACTIONS (CONT'D)
Y ' ACTIONS OETAILS NOTE If both CC coolers are isolated, the CC chiller may trip on low chill-water flowrate. !
If both CC coolers are in service, the chill water pump may trip on overcurrent.
5.3 IF AHF-18A is running, 1 Notify PP0 to verify chill water is TiiEN ensure chill water is aligned to AHF-18A:
aligned.
CHV-4 "CC Cooler A Outlet Isu" is open (164 ft CC between AHHE-SA and AHHE-5B)
CHV-2 "CC Cooler B Outlet Iso" is closed (164 ft CC b Ventilation Room door)y 2 IF chill water is NOT aligned to
' RF-18A, THEN notify PP0 to perform the T5TTowing in order:
Throttle CHV-2 "CC Cooler B Outlet Iso" 10 turns closed.
Throttle CHV-4 "CC Cooler A Outlet Iso" 1 turn open.
Close CHV-2 "CC Cooler B Outlet Iso" Open CHV-4 "CC Cooler A Outlet Iso".
O
~AP-250 REV 11 PAGE 27 of 37 RMA
Oi l
i
\
l 1
l l
l l
l BLANK PAGE g
l 9
i AP-250 REV 11 PAGE 28 of 37 RMA
l 5.0 ENCLOSURE 5 RM A5 GAS / IODINE ACTIONS (CONT *D)
ACTIONS DETAILS NOTE If both CC cooler; are isolated, the CC chiller may trip on low chill water flowrate.
If both CC coolers are in service, the chill water pump may trip on overcurrent.
5.4 IF AHF-18B is running. 1 Notify PPO to verify chill water is THEN ensure chill water aligned to AHF-18B:
aligned.
CHV-2 "CC Cooler B Outlet Iso" is open (164 ft CC by Ventilation Room door)
CHV-4 "CC Cooler A Outlet Iso" is closed (164 ft CC between AHHE-5A and AHHE-5B) r 2 IF ' Sill water is NOT aligned to t
XP ~ .8B.
Ths.. notify PPO to perform the following in order:
Throttle CHV-4 "CC Cooler A Outlet Iso" 10 turns closed.
Throttle CHV-2 "CC Cooler B Outlet Iso" 1 turn open.
Close CHV-4 "CC Cooler A Outlet Iso".
Open CHV-2 "CC Cooler B Outlet Iso".
(3 V
AP-250 REV 11 PAGE 29 of 37 RMA l,
l 1
1 0! 1 l
I BLANK PAGE O
O' AP-250 REV 11 PAGE 30 of 37 ! RMA 1
~ a
5.0 ENCLOSURE 5 RM A5 GAS / IODINE ACTIONS (CONT'D)
ACTIONS DETAILS 5.5 1E activity in CC air is 1 Ensure AH-193-FC "CNTRL COMPLEX higher than outside air. RECIRC DMPR" is set to "0" THEN override RM-A5
. (AHD-3 full open).
gad lIODINE actuation.
2 Select " DAMPER OVERRIDE" switch to "0N". i 3 Adjust AH-193-FC "CNTRL COMPLEX RECIRC DMPR" to "10" (AHD-3 60*
open).
5.6 WHEN radiation monitor can 1 Select RM-A5 GAS / IODINE to be reset. " ALARM RESET".
THEr. O t monitor.
2 Ensure RM-A5 " HORN SILENCE" is reset.
5.7 E ue C fans are AHF-18A.
AHF-188 AHF-19A AHF-19B 5.8 IF " DAMPER OVERRIDE" 1 Adjust AH-193-FC "CNTRL COMPLEX Eitch is "0N". RECIRC DMPR" to "0" (AHD-3 full THEN restore CC recirc open).
damper to normal.
2 Select " DAMPER OVERRIDE" switch to "0FF" O
AP-250 REV 11 PAGE 31 of 37 RMA
, ,I l
Ol 1
BLANK PAGE O
O AP-250 REV 11 PAGE 32 of 37 RMA
______________j
5.0 ENCLOSURE 5 RM A5 GAS / IODINE ACTIONS (CONT *D)
ACTIONS DETAILS 5.9 ' Align CC ventilation to
- Select both " CONTROL COMPLEX HVAC normal. ISOLATE / RESET" switches to " RESET":
. _ A Train B Train 5.10 Restore CC ventilation 1 Start 1 CC normal supply fan:
fans.
AHF-17A AHF-17B 2 Start 1 CC return fan:
AHF-19A AHF-19B 5.11 Verify CC dampers are properly positioned. Closed , ___ AHD-2C Open_ _ _ AHD-2E
_ _ AHD-1C AHD-1E AHD-3 l.
l 0
AP-250- REV 11 PAGE 33 of 37 RMA
1
. .i O
BLANK PAGE O
AP-250 REV 11 PAGE 34 of 37 RMA
5.0 ENCLOSURE 5 RM A5 GAS / IODINE ACTIONS (CONT *D)
(a) ACTIONS DETAILS 5.12 Restore CC exhaust fans. 1 Ensure 1 CC exhaust fan is running:
AHF-20A AHF-20B 2 Ensure 1 Chemistry Lab exhaust fan is running:
AHF-44A AHF-448 5.13 Verify CC 95 ft supply dampers are open. AHD-12 AHD-12D l (3 I i
(.)
5.14 Ensure AH-032-FIR. Channel A indicates approximately 35,000 cfm.
5.15 GO TO Step 3.9 in this >
procedure.
I (1
c/
AP-250 REV 11 PAGE 35 of 37 RMA
e BLANK PAGE
{
e)
AP-250 REV 11 PAGE 36 of 37 RMA 4
p -
RM-Al GAS Closed: LRV-70 LRV-71 LRV-72 LRV-73 AHV-1C AHV-10 AHV-1B AHV-1A RM-A2 GAS Stopped: AHF-30 AHF-9A AHF-11A AHF-9B AHF-11B AHU-3 AHF-10 Table 1: RM-A3 RM Auto Actions Stopped: AHF-11A AHF-11B RM-A4 l Stopped: AHF-10 l
RM-A5
! GAS / IODINE Closed: AHD-12 AHD-2E l
AHD-12D AHD-1C AHD-2C AHD-1E Open: AHD-3 l
Stopped: AHF-17A AHF-17B AHF-19A AHF-19B AP-250 REV 11 PAGE 37 of 37 (LAST PAGE) RMA
_a