Forwards Table Providing Results of Addl Review Following Receipt of Info Provided by J Donohew Re Implementation of Generic Requirements.Results of Initial Review of Request Provided in
ML20204B461
Person / Time
Site: Oyster Creek
Issue date: 03/19/1987
From: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
To: Zwolinski J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-***, TASK-TM GL-82-16, GL-83-43, GL-84-15, IEB-78-03, IEB-78-3, NUDOCS 8703250065
Download: ML20204B461 (7)


Text

e W

GPU Nuclear Corporation NUhIM[ Post Office Box 388 Route 9 South Forked River,New krsey 08731-0388 609 ')71-4000 Writer's Direct Dial Number:

March 19,1987 Mr. John A. Zwolinski, Director BWR Project Directorate No.1 Division of BWR Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Zwolinski:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Implementation of Generic Requirements Our letter of June 27, 1986, provided the results of our initial review of your request. The attached Table provides the results of additional review following receipt of the information provided by Mr. J. Donohew.

The attached table provides the current status of all items to the best of our knowledge. Please understand that many of these issues are overlapping. The status indicated is based on GPUN's understanding of the specific requirements pertaining to each item. As stated in our previous letter, for active items the dates which are given are not intended to revise any commitment date previously provided.

Should you have any questions please contact Mr. George W. Busch, OC Licensing Engineer at (609)971-4909.

Very truly yours, ual 1

y- )

p _;- -

Vice President and Director Oyster Creek PBF/GB/ dam Attachment (0301 A) cc:Dr. Thomas E. Murley, Administrator Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 NRC Resident Inspector Oyster Creek Nuclear Generating Station Forked River, NJ 08731 [

0703250065 870319 '

$ llll PDR ADOCK 05000219 PDR p uru avuciear corporation is a subsidiary of the General Pubhc Utilities Corporation

i

> LIC ACT LICENSEE TAC NO. MPA # TITLE COMPLETE STATUS DATE M08334 A-01 10 CFR 50.55 A(G) - ISI 06/28/83C Complete 10/85 M08100 A-02 APPENDIX I - ALARA 10/06/86 Projected 12R N06908 A-03 SECURITY REVIEWS-MODIFIED AMENDMENT PLANS 09/14/79C Complete 9/14/79 M06104 A-04 APPENDIX J - CONTAINMENT LEAK TESTING 01/01/70C Complete Closed by Staff M08678 A-04 APPENDIX J - CONTAINMENT LEAK TESTING 03/03/82C Projected 7/87 l

06/28/78C Complete 7/78 N07922 A-05 GE MARK I CONTAINMENT TECH SPECS-SHORT TERM M11638 A-08 ECCS EVALUATION-GENERIC PER 50.46 COMPLIANCE 05/30/79C Complete 5/79 M11366 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE 10/16/79C Complete 10/16/79 M10497 A-10 CONTINGENCY PLANNING 09/25/80C Complete 10/80 M07683 A-11 GUARD TRAINING PLANS 02/11/81C Complete 10/79 M10500 A-12 VITAL AREA ANALYSIS 04/12/82C Complete 10/79

! M12651 A-15 QUALITY ASSURANCE REQUEST REGARDING DIESEL GENERAT 01/07/80C Complete 1/7/80 M47116 A-16 QUALIFICATIONS OF EXAMINATION, INSPECTION, TESTING 03/11/82C Complete 9/82 I M51115 A-17 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDEN 09/30/86 Projected IAW Living Sched.

M55726 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 05/30/85C Complete 10/86 M 59122 A-20 10 CFR 50.62 OPERATING REACTOR REVIEWS 06/30/86 Projected 12/88 M06534 B-02 FIRE PROTECTION 03/03/78C Complete 12/86 M46668 B-05 STRESS CORROSION CRACKING - BWR RCSPB 06/28/84C Projected 12R M08224 B-05 STRESS CORROSION CRACKING - BWR RCSPB 10/17/79C Complete Closed by Staff I

LIC ACT LICENSEE TAC NO. MPA # TITLE COMPLETE STATUS DATE M08200 B-06 BWR RELIEF VALVE 01/16/80C Complete *'

M12145 B-16 EMERGENCY PLANNING AND REVISIONS 04/01/81C . Complete 4/81 M08440 B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS 03/31/86 Complete 4/86 M10287 B-20 CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION 01/16/81C Complete Closed by. Staff M10349 B-21 LOSS OF 125-V DC BUS VOLTAGE WITH LOSS OF ANNUNCIA 02/28/82C Complete Closed by Staff M08439 B-22 TECH SPEC SURVEILLANCE REQUIREMENTS FOR MECHANICAL 03/31/86 Complete 4/86 M10038 B-23 DEGRADED GRID VOLTAGE 10/16 /81 C Complete 2/85 M10191 B-24 VENTING AND PURGING CONTAINMENTS WHILE AT FULL POW 08/25/80C Complete Closed by Staff M42613 B-24 VENTING AND PURGING CONTAINMENTS WHILE AT FULL POW 01/21/86C Projected 12R M08411 B-25 BWR FEEDWATER N0ZZLE CRACKING 03 /19 /82 C Projected 13R M10891 B-27 REVIEW RESPONSES TO IE BULLETIN 78-03 (OFFGAS EXPL 08/22/79C Complete 8/22/79 M07404 B-27 REVIEW RESPONSES TO IE BULLETIN 78-03 (OFFGAS EXPL 07/01/78C Complete 8/22/79 M11015 8-29 BWR FEEDWATER PUMP TRIP 11/30/78C Complete 11/30/78 M11104 B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 02/13/81C Complete 1/82

M11755 B-42 TMI FOLLOW UP - ALL PLANTS 05/08/80C See B-44 M12422 B-44 LESSONS LEARNED IMPLEMENTATION 03/27/81C Projected 9/87 M12919 B-45 WASH 1400 EVENT V. " PRIMARY COOLANT SYSTEM PRESSUR 04/20/81C Complete 8/81 M42083 B-46 ANALYSIS OF TURBINE DISC CRACKS 06/11/80C ,

Complete 9/80 M12699 B-47 ECCS; CLAD SWELLING AND RUPTURE 07/20/80C Complete 9/11/80

  • No information found-Technical Specifications Amendment Nos. 82, 90, and 109 provides surveillance requirements-Item considered closed.

1 9

f

LIC ACT LICENSEE TAC NO. MPA # TITLE COMPLETE STATUS DATE M12766 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 10/16/81 C Complete 2/85 M42215 B-58 SDV CAPABILITY 10/15/82C Complete 1983 M42914 B-59 MASONRY WALL DESIGN 12/23/85C Projected 11/87 M42524 B-60 ENVIRONMENTAL QUALIFICATION 05/28/85C Complete 11/85 M42692 B-61 LOSS OF NON CLASS IE IAC POWER 07/28/82C Complete Closed by Staff M42763 B-62 ESF RESET CONTROL DESIGN DEFICIENCY 06/21/82C' Complete 06/21/82 M43919 B-63 INTERIM PROCEDURES FOR SHORT TERM BLACK 0UT 09/04/81C Complete 10/84 M43717 B-65 SAFETY CONCERNS ASSOCIATED WITH PIPE BREAKS IN BWR 01/27/86C Complete 1/86 M46623 B-70 FATIGUE TRANSIENT LIMIT TS 05/25/82C Complete Closed by Staf f M51687 B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16) 05/30/85C Projected --

M52782 B-76 ITEM 1.1 - POST TRIP REVIEW; PROGR?A DESCRIPTION & 05/14/85C Projected 12R M52863 B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION & VENDOR INTER 11/30/86 Projected 12/88 M52944 B-78 ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TEST PROCEDU 04/30/86 Projected --

M53025 B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHANGES TO 07/30/86 Complete 10/85 M54554 B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83- 11/22/85C Complete 10/85 M55605 B-84 INSPECTIONS OF BWR STAINLESS STEEL PIPING ACCORDIN 08/05/85C Complete 12/86 M53615 B-85 SALEM ATWS 1.2 DATA CAPABILITY 05/31/86 Complete 4/86 M53698 B-86 SALEM ATWS 2.2 S-R COMPONENTS 01/30/87 Projected 12/88 M53781 8-87 SALEM ATWS 3.2.1 & 3.2.2 S-R COMPONENTS 04/30/86 Projected --

M53864 B-88 SALEM ATWS 3.2.3 T.S. S-R COMPONENTS 07/30/86 Complete 10/85

--Under review by NRC

LIC ACT LICENSEE TAC NO. MPA # TITLE COMPLETE STATUS DATE C54091 B-92 SALEM ATSW 4.5.1 DIVERSE TRIP FEATURES 05/15/86 Complete 8/85 M54008 B-93 SALEM ATWS 4.5.2 & 4.5.3 TEST ALTERNATIVES 04/30/86 Complete 6/85 M08282 C-02 BWR-RECIRC. PUMP TRIP (ATWS) 08/20/79C Complete 1981 M47128 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE 06/21/83C Complete 6/84 M07147 C-11 RPS POWER SUPPLY 03/30/83C Projected 6/87 M52253 C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLOWUP OF MPA 06/28/85C Complete 6/85 M07944 D-01 GE MARK I CONTAINMENT EVALUATION - LONG TERM 01/13/84C Projected 12R M10070 D-11 FISSION GAS RELEASE 10/13/78C Complete Closed by Staff M07961 0-12 NON-JET PUMP BWR CORE SPRAY PERFORMANCE 04/06/83C Complete Closed by Staff 4

M12291 D-15 HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL 02/27/81C Complete 6/82 l M43051 0-17 DEFINITION OF OPERABLE 10/29/82C Complete 11/82 M55885 D-19 DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15) 10/07/85C Compl e te 5/86 M57161 D-20 MARK I DRYWELL VACUUM BREAKERS - LICENSEE RESPONSE 06/30/86 Projected 13R 9 i

M44043 F-01 I.A.1.1 SHIFT TECHNICAL ADVISOR 01/15 /82C Complete 11/84 j M44112 F-02 I.A.l.3 SHIFT MANNING 11/28/83C Complete 5/86 M44183 F-03 I.A.2.1 UPGRADED OF R0 AND SRO TRAINING 11/30/82C Complete 11/82 M44254 F-04 I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC 06/07/84C Compl ete 4/86 M44324 F-05 I.C.1.2/3.B PROCEDURES GENERATION PACKAGES (NUREG 03/30/87 Complete 10/85 M47237 F-06 I.C 5 FEEDBACK OF OPERATING EXPERIENCE 02/01/82C Complete 10/80 j

i l

1 i .

i I

.~

LIC ACT LICENSEE TAC NO. MPA # TITLE COMPLETE STATUS DATE M47309 F-07 I.C.6 CORRECT PERFORMANCE OF OPERATING ACTIVITI 02/01/82C Complete 12/80

! C51185 F-08 I.D.1.1 DETAILED CONTROL ROOM DESIGN REVIEW PROGRA 10/10/84C Projected 11/86 M51265 F-09 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM 03/05/86C Projected 9/87 1

M44393 F-10 II.B.1 RCS HIGH POINT VENTS 09/02/83C Complete 2/86 M44533 F-11 II.B.2 PLANT SHIELDING 04/19/85C. Complete 9/85 M44462 F-12 II.B.3 POST ACCIDENT SAMPLING 08/29/84C Complete 11/85 M44533 F-13 II.B.4 TRAINING FOR MITIGATING CORE DAMAGE 11/30/82C Complete 1/82

) M44603 F-14 II.D.1 RV AND SV TRAINING 06/19/84C Complete 4/83 M44801 F-18 II.E.4.1 DEDICATED HYDROGEN PENETRATION 06/10/80C Complete 1/17/83 M44872 F-19 II.E.4.2 CONTAINMENT ISOLATION DEPENDABILITY 08/31/83C See B-24 M44943 F-20 II.F.1.1 NOBLE GAS MONITOR 03/31/82C Complete 1984 M45014 F-21 II.F.1.2 IODINE / PARTICULATE SAMPLING 03/31/82C Complete 1984 M45085 F-22 II.F.1.3 CONTAINMENT HIGH RANGE MONITOR 10/20/82C Complete 12/86 M47621 F-23 II.F.1.4 CONTAINMENT PRESSURE INSTRUMENT 09/29/83C Complete 11/84 M47692 F-24 II.F.1.5 CONTAINMENT WATER LEVEL INSTRUMENT 09/29/83C Complete 11/84 i M47763 F-25 II.F.1.6 CONTAINMENT HYDROGEN MONITOR 09/29/83C Compl ete 11/84 i M45155 F-26 II.F.2 INSTRUMENTS FOR DETECTION ON INADEQUATE 08/09/85C Complete 11/86*

M45365 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 06/10/82C = Complete 12/84 M45548 F-43 II.K.3.13 HPCI AND RCIC INITI ATION LEVELS 03/03/82C N/A-0C

M45558 F-44 II.K.3.14 ISOLATION CONDENSER ISOLATION MODIFICAT 12/18/81C Complete 4/81
  • Yarways have been replaced-additional work on Barton switches is ongoing per SEP

~

I

LIC ACT LICENSEE TAC NO. MPA # TITLE COMPLETE STATUS DATE M45600 F-46 II.K.3.16 CHALLENGES'AND FAILURES OF RELIEF VALVE 10/23/84C Complete 12/84 M5651 F-47 II.K.3.17 ECCS OUTAGES 08/04/83C Complete- 2/81 M45696 F-48 II.K.3.18 ADS ACTUATION 01/04/85C Complete 8/84 M45720 F-49 II.K.3.19 INTERLOCK RECIRCULATION PUMP MODIFICATI 05/30/85C Complete S/to

} M45744 F-50 II.K.3.21 RESTART OF CSS AND LPCI 05/27/83C Complete 11/84 M45768 F-53 II.K.3.25 POWER ON PUMP SEALS 10/22/82C' Complete. 2/82 M45792 F-54 II.K.3.27 COMMON REFERENCE LEVEL 04/13/82C Complete 11/84 C45802 F-56 II.K.3.29 PERFORMANCE OF ISOLATION CONDENSER 02/01/84C Complete 2/86 M45848 F-57 II.K.3.30 SB LOCA METHODS 12/21/83C Complete 7/82 M48187 F-58 II.K.3.31 COMPLI ANCE WITH 10 CFR 50.46 12 / 21/83C Complete 7/82 M45892 F-59 II.K.3.44 ANTICIPATED TRANSIENTS WITH SINGLE FAIL 06/18/82C Complete 2/82 M45916 F-60 II.K.3.45 MANUAL DEPRESSURIZATION 05/17/83C Complete 2/81 C45967 F-63 III.A.1.2 TECHNICAL SUPPORT CENTER 03/03/86C Complete 2/85 4

C46038 F-64 III.A.I.2 OPERATIONAL SUPPORT CENTER 03/03/86C Complete 4/82 M46110 F-65 III.A.1.2 EMERGENCY OPERATIONS FACILITY 03/03/86C Complete 3/84

)

! M46182 F-66 III.A.I.2 NUCLEAR DATA LINK 07/30/82C Complete Closed by Staff M46254 F-67 III.A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE 05/09/83C Complete 5/83 M46326 F-68 III.A.2.2 METEOROLOGICAL DATA UPGRADE 03/03/86C Projected 8/86 C46397 F-69 III.D.3.3 IMPLANT RADIATION MONITORING 06/29/82C Complete 7/82 M46466 F-70 ,

III.D.3.4 CONTROL ROOM HABITABILITY 03/31/86 Projected 12R M56147 F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEW (FOLLOWUP TO 02/27/86C Projected 12R. ,