l May 2, 1986 a
I Docket No. 50-267 s
Mr. R. F. Walker, President Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840
Dear Mr. Walker:
SUBJECT:
REGULATORY INFORMATION TRACKIN'i SYSTEM The Comptroller General in a Report to the Congress dated September 19, 1984, stated "NRC needs better management controls to ensure implementation of generic issue solutions." To correct this situation, the Nuclear Regulatory Commission is working on a long-term program which will improve its documentation on the status of power reactor licensees' implementation of approved regulatory improvements.
To assist me 'n developing this information for the Fort St. Vrain Nuclear Generating Stai. ion, please review the enclosed plant-specific list, add omitted significant actions to the list, and provide the date that all aspects of each identified requirement were completed / implemented or are expected to be completed.
For each requirement that has been completed, enter " completed" under the Status column and the date the item was completed.
For requirements that have not been completed / implemented, provide the projected date and enter " projected" under the Status column.
I do not expect or want a major effort made to obtain precise dates. Rather, I will accept readily-known or best-estimate dates for actions that have been completely implemented. For example, the year only would be acceptable for completions prior to 1984; the month as well as year is needed for require-ments completed after that time.
For projected completions / implementations in 1986, use month and year. Use year only for projections thereafter.
Please provide a response in the form of a marked up listing by May 31, 1986.
In the future, NRR will need estimated dates prior to issuance of the safety evaluation so that the estimated schedule may be included in the evaluation.
This request is covered by 0MB Clearance Number 3150-0011, which expires September 3C, 1986.
Sincerely, Original signed by Kenneth L. Heitner, Project Manager
@ 30 $ $IObO$67 Standardization and Special p
PDR Projects Directorate Division of PWR Licensing-B
Enclosure:
DISTRIBUTION:
As stated 9 Docket F11e g PNoonan LSolander
'NRC"PDR KHeitner JFunches cc: See next page Local PDR 0 Lynch HSmith, PPAS/TOSB DCS HBerkow SScott, ADMIN /TIDC B SSPD DPWRL-B:SSPD DP B:SSPD DP RSPD P S KHeitner:ac 0 Lynch HBer U
L nder JF hes i/86 05/l/86 05/JV/86 05/&/h6 05/7)/86
/ /86
-1
8 UNITED STATES g
NUCLEAR REGULATORY COMMISSION 5
- y WASHINGTON, D. C. 20555
\\...../
May 2, 1986 l
Docket No. 50-267 Mr. R. F. Walker, President Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840
Dear Mr. Walker:
SUBJECT:
REGULATORY INFORMATION TRACKING SYSTEM The Comptroller General in a Report to the Congress dated September 19, 1984, stated "NRC needs better management controls to ensure implementation of generic issue solutions." To correct this situation, the Nuclear Regulatory Commission is working on a long-term program which will improve its documentation on the status of power reactor licensees' implementation of approved regulatory improvements.
To assist me in developing this information for the Fort St. Vrain Nuclear T
Generating Station, please review the enclosed plant-specific list, add omitted significant actions to the list, end provide the date that all aspects of each identified requirement were completed / implemented or are expected to be completed. For each require'nent that has been completed, enter " completed" under the Status column and tae date tha item was completed.
For requirements that have not been completed / implemented, provide the projected date and enter " projected" under the Status column.
I do not expect or want a major effort made to obtain pre:ise dates, Rather, I will accept readily-known or best-estimate dates for actions that have been completely implemented. For example, the year only would be acceptable for completions prior to 1984; the month as well as year is needed for require-ments completed after that time. For projected completions / implementations in 1986, use month and year. Use year only for projections thereafter.
Please provide a response in the form of a marked up listing by May 31, 1986.
In the future, NRR will need estimated dates prior to issuance of the safety evaluation so that the estimated schedule may be included in the evaluation.
This request is covered by OMB Clearance Number 3150-0011, which expires September 30, 1986.
Sincerely, Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B
Enclosure:
As stated cc: See next page
4 Mr. R. F. Walker Public Service Company of Colorado Fort St. Vrain cc:
Mr. D. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engineering Division Radiation Control Division Public Service Company Department of Health of Colorado 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80220 Denver, Colorado 80201 Mr. David Alberstein, 14/159A Mr. J. W. Gahm, Manager GA Technologies, Inc.
Nuclear Production Division Post Office Box 85608 Public Service Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Mr. L. W. Singleton, Manager Public Service Company of Colorado Quality Assurance Division P. O. Box 840 Fort St. Vrain Nuclear Station Denver, Colorado 80201 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. 0. Box 640 Platteville, Colorado 80651 Kelley, Stansfield & 0'Donnell Public Service Company Building Room 900 550 15th Street Denver, Colorado 80202 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1800 Lincoln Street Denver, Colorado 80203
_ 7
- 1208731-001 REOULAT0RY INF0RMATION TRACKINO S Y S T E*M PAGE NO.
181
FACILITY IMPLEMENTATION 03/S1/36-
[
CILITY: FORT ST VRAIN sANT LOCATION: 35 MI N OF DENVER, COL LICENSED PONER: 0842 MHT PROJECT MANAGER: K. HEITMER
%KET NUMBER:
050-00267 DESIGN PONER:
0330 MHE BRANCH CHIEF:
H. BERK 0H c
S3L NSSS VENDOR:
GAC LIC. ASSISTANT:
. VACANT lCH/ ENGINEER:
INSPECTOR:
G. PLUMLEE t:
LIC ACT LICENSEE LC NO.
MPA 9 TITLE COMPLETE STATUS 281g
-8341 A-02 APPENDIX I - ALARA 11/23/83C
%939 A-03 SECURITY REVIENS-MODIFIED AMENDMENT PLANS 02/23/79C jl576 A-10 CONTINGENCY PLANNING 08/05/82C l
!1577 A-11 GUARD TRAINING PLANS 08/05/82C l.
7557 A-16 QUALIFICATIONS OF EXAMINATION, INSPECTION, TESTING 04/05/82C 1992 A-17 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDEN 08/30/86 1
5710 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 10/05/84C 9097 A-20 10 CFR 50.62 OPERATING REACTOR REVIENS N//S /
- 2155 B-16 EMERGENCY PLANNING AND REVISIONS 08/14/81C 7417 B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS 01/25/84C 6504 B-23 DEGRADED GRID VOLTAGE 07/01/83C 0001 B-44 LESSONS LEARNED IMPLEMENTATION 03/25/80C 50002 B-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C 0004 B-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C 0005 B-44 LESSONS LEARNED IMPLEMENTATION 0$/26/80C B-44' LESSONS LEARNED IMPLEMENTATION 03/26/80C (0006 0007 B-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C 0008 B-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C 0009 B-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C 0010 B-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C
t 1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE N0.8 182 FACILITY IMPLEMENTATION 03/31/86; IRT ST VRAIN (CONTINUATION) re LIC ACT LICENSEc iC NO.
MPA #
TITLE COMPLETE STATUS
- JLA_If, LOO 11 B-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C f
iOO12 B-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C LOO 13 B-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C
'0014 B-44 LESSONS LEARNED IMPLEMENTATION 03/26/80C 6503 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 08/17/82C 2925 B-59 MASONRY HALL DESIGN 01/15/86C 2527 B-60 ENVIRONMENTAL QUALIFICATION 12/31/86 2743 B-62 ESF RESET CONTROL DESIGN DEFICIENCY 10/14/82C 3935 B-63 INTERIM PROCEDURES FOR SHORT TERM BLACK 0UT 08/17/82C 6617 B-70 FATIGUE TRANSIENT LIMIT TS 05/25/82C 2759 B-76 ITEM 1.1 - POST TRIP REVIEN; PROGRAM DESCRIPTION &
06/06/85C 2840 B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION 8 VENDOR INTER 06/30/85
-2921 B-78 ITEMS 3.1.1 & 3.1.2 -POST MAINTENANCE TEST PROCEDU 02/18/86C l3002' B-79 ITEM 3.1.3 - POST MAINTENANCE TES!IMG - CHANGES TO 02/18/86C 4535 B-83 TECN SPECIFICATIONS COVERED BY GEa4ERIC LETTERS 83-02/18/86C 3591 B-85 SALEM ATHS 1.2 DATA CAPABILITY 07/23/85C 3674 B-86 SALEM ATHS 2.2 S-R COMPONENTS 06/30/85 3757 B-87 SALEM ATHS 3.2.1 8 3.2.2 S-R COMPONENTS 02/18/86C 3840 B-88 SALEM ATHS 3.2.3 T.S. S-R COMPONENTS 02/18/86C 0067 B-92 SALEM ATHS 4.5.1 DIVERSE TRIP FEATURES 01/30/87 3984 B-93 SALEM ATHS 4.5.2 & 4.5.3 TEST ALTERNATIVES 06/30/85 1025 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE 03/06/84C
'2250 C-15 CONTROL OF HEAVY LOADS - PHASE II (FDLLONUP OF MPA 06/28/85C I
i f
1 m
i o1208731-001 REGULAT0RY INF0RMATION TRACKING SYST M
PAGE NO.
.183 FACILITY IMPLEMENTATION 03/31/86 ERT ST VRAIN (CONTINUATION)
LIC ACT LICENSEE AC NO.
MPA 8 TITLE COMPLETE STATUS RAIE
$8061 C-16 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERN 12/11/85C 5861 D-19 DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15) 08/15/85 h4022 F-01 I. A. I '.1 SHIFT TECHNICAL ADVISOR 03/24/82C h4091 F-02 I.A.1.3 SHIFT MANNING 10/13/83C
$4163 F-03 I.A.2.1 UPGRADING OF RO AND SRO TRAINING 03/24/82C 34234 F I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC 03/28/85C p4304 F-05 I.C.1.2/3.B PROCEDURES GENERATION PACKAGES (NUREG 12/31/86 h7217 F-06 I.C.5 FEEDBACK OF OPERATING EXPERIENCE 03/24/82C h7289 F-07 I.C.6 CORRECT PERFORMANCE OF OPERATING ACTIVITI 11/18/82C 21162 F-08 I.D.1.1 DETAILED CONTROL ROOM DESIGN REVIEN PROGRA 08/20/85C B1242 F-09 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM 06/30/86 34375 F-10 II.B.1 RCS HIGH POINT VENTS 03/24/82C 7940 F-11 II.B.2 PLANT SHIELDING 03/14/83C 4443 F-12 II.B.3 POST ACCIDENT SAMPLING 01/14/86C 4513 F-13 II.B.4 TRAINING FOR MITIGATING CORE DAMAGE 09/30/82C 4583 F-14 II.D.1 RV AND SV TRAINING 03/24/82C 4781 F-18 II.E.4.1 DEDICATED HYDROGEN PENETRATION 03/24/82C C4852 F-19 II.E.4.2 CONTAINMENT ISOLATION DEPENDABILITY 03/24/82C 4923 F-20 II. F.1.1 NOBLE GAS MONITOR 06/17/85C 4994 F-21 II. F.1. 2 IODINE / PARTICULATE SAMPLING 03/24/82C 5065 F-22 II.F.1.3 CONTAINMENT HIGH RANGE MONITOR 05/14/84C 7601 F-23 II.F.1.4 CONTAINMENT PRESSURE INSTRUMENT 03/24/82C 7672 F-24 II. F.1. 5 CONTAINMENT HATER LEVEL INSTRUMENT 03/24/82C
SYSTEfM PAGE NO.
184 1208731-001 REGULAT0RY INF0RMATION TRACKINO FACILITY IMPLEMENTATION 03/31/86 RT ST VRAIN (CONTINUATION)
LIC ACT '
LICENSEE C NO.
MPA 9 TITLE COMPLETE STATUS DAIE 7743 F-25 II.F.1.6 CONTAINMENT HYDROGEN MONITOR 03/24/82C 2136 F-26 II.F.2 INSTRUMENTS FOR DETECTION ON INADEQUATE 03/24/82C 5345 F-38 II.K 3.3 REPORTING SV AND RV FAILURES AND CHALLE 03/24/82C 2631 F-47 II.K.3.17 ECCS OUTAGES 03/24/82C 5828 F-57 II.K.3.30 SB LOCA METHODS 03/24/82C 9167 F-58 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46 03/24/82C 2947 F-63 III.A.1.2 TECHNICAL SUPPORT CENTER 06/30/86 6018 F-64 III.A.1.2 OPERATIONAL SUPPORT CENTER 06/30/87 l
6090 F-65 III.A.1.2 EMERGENCY OPERATIONS FACILITY 09/30/86 6162 F-66 III.A.1.2 NUCLEAR DATA LINK 07/30/82C S234 F-67 III.A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE 06/27/83C 6306 F-6a III.A.2.2 METEOROLOGICAL DATA UPGRADE 06/30/87 6377 F-69 III.D.3.3 IMPLANT RADIATION MONITORING 03/24/82C 6448 F-70 III.D.3.4 CONTROL ROOM HABITABILITY 09/08/83C 6125 F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEN (FOLLOHUP TO 09/30/86
9
-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.
J81 FACILITY IMPLEMENTATION 04/14/86,
6CILITY: FORT ST VRAIN
, ANT LOCATION: 35 MI N OF DENVER, COL LICENSED P0HER: 0842 MHT PROJECT MANAGER: K. HEITMER 3CKET NUMBER:
050-00267 DESIGN POWER:
0330 MHE BRANCH CHIEF:
H. BERKOH tCH/ ENGINEER:
S&L NSSS VENDOR:
GAC LIC. ASSISTANT:
. VACANT E INSPECTOR:
G. PLUMLEE LC NO.
HEA_.t TITLE 64022 F-01 FORT ST VRAIN - NUREG-0737 I.A.1.1 STA LONG TERM REQUIREMENTS 68341 A-02 FORT ST. VRAIN - RETS b4091 F-02 FORT ST VRAIN - NUREG-0737 I.A.1.3.1, SHIFT MANNING DVERTIME LIMITS 6939 A-03 FORT SAINT VRAIN SECURITY PLAN 4163 F-03 FORT ST VRAIN - NUREG-0737 I.A.2.1.4, UPGRADING OF RO AND SRO TRAINING
)4234 F-04 FORT ST VRAIN - N'UREG-0737 I.C.1.2.A, INADEQUATE CORE COOLING GUIDELINES k4304 F-05 FORT ST. VRAIN - PROCEDURES GENERATION PACKAGE REVIEW (NUREG 0737 SUPP/1) 7217 F-06 FT ST. VRAIN - FEEDBACK OF OPERATING EXPERIENCE CAP I.:.5) 7289 F-07 FT. ST. VRAIN - CORRECT PERFORMANCE OF OPERATING ACTIVITIES (API.C.6) 1162 F-08 FORT ST. VRAIN - I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEN PROGRAM PLAN F-08 1242 F-09 FORT ST. VRAIN - I.D.2. SAFETY PARAMETER DISPLAY SYSTEM 1025 C-10 FORT ST. VRAIN-CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (NUREG 0612)
$1576 A-10 FORT ST VRAIN - CONTINGENCY PLAN REVIEH 4375 F-10 FORT ST VRAIN - NUREG-0737 II.B.1, RCS HIGH POINT VENTS 1577 A-11 FORT ST VRAIN - GUARD TRAINING 7940 F-11 FT. ST. VRAIN - PLANT SHIELDING MODIFICATIONS CII.B.2.2) 4443 F-12 FORT ST VRAIN - NUREG-0737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS 4513 F-13 FORT ST VRAIN - NUREG-0737 II.B.4.1, TRAINING FOR MITIGATING CORE l
'4583 F-14 FORT ST VRAIN - RV AND SV TESTING
/2230 C-15 FORT ST.'VRAIN - CONTROL OF HEAVY LOADS - PHASE II (FDLLONUP OF MPASC-10) 1
i
>1208731-001 REGULAT0RY INF0RMAT10N TRACKING SYSTEM PAGE NO.
182 FACILITY IMPLEMENTATION 04/14/86 4RT ST VRAIN (CONTINUATION) 1C NO.
MPA 9 TIlLE 17557 A-16 FT. ST VRAIN - QUALIFICATIONS: INSP, EXAM, TEST, AUDIT PERSONNEL 2155 B-16 FORT ST VRAIN - UPGRADED EHERGENCY PLAN iS061 C-16 FORT ST. VRAIN -UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM GENERATORS (GL 85-02)
>7417 B-17 FORT ST VRAIN - SNUBBERS 11092 A-17 FORT ST. VRAIN - INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDENT (RG 1.97) 55710 A-18 FORT ST. VRAIN - TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43) 4781 F-18 FORT ST VRAIN - NUREG-0737 II.E.4.1.2, DEDICATED HYDROGEN PENETRATICNS b4852 F-19 FORT ST VRAIN - NUREG-0737 II.E.4.2, CONTAINMENT ISOLATION DEPENDABILITY 5861 D-19 FORT ST. VRAIN - DIESEL GENERATOR RELIABILITY TECH. SPECS.
(GL 84-15)
'9097 A-20 FORT ST. VRAIN - 10CFR50.62 OPERATING REACTOR REVIENS 4923 F-20 FOR~ ST VRAIN - NUREG-0737 II.F.1.1, NOBLE GAS MONITOP.
4994 F-21 FORT ST VRAIN - NUREG-0737 II.F.1.2, IODINE /
PARTICULATE SAMPLING 5065 F-22 FORT ST VRAIN - NUREG-0737 II.F.1.3, CONTAINMENT HIGH RANGE MONITOR 504 B-23 FT ST VRAIN-DEGRADED GRID VOLTAGE 7601 F-23 FT. ST. VRAIN - NUREG 0737 ITEM II F1.4 - CONTAINMENT PRESSURE INSTRUMENT 7672 F-24 FT. ST. VRAIN - NUREG 0737 ITEM II F1.5 CONTAINMENT HATER LEVEL MONITOR 7743 F-25 FT. ST. VRAIN - NUREG 0737 ITEM II F1.6 CONTAINMENT HYDROGEN MONITOR 5136 F-26 FORT ST VRAIN - NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION 5345 F-38 FORT ST VRAIN - NUREG-0737 II.K.3.3, REPORT ON RV/SV FAILURES B-44 FORT ST. VRAIN-2.1.7.5 CONTROL GRADE AUX FEED FLOH INDICATION (0001
'0002 B-44 FORT ST. VRAIN-2,1.5 A,C DEDICATED H2 CONTROL PENETRATIONS 8 RECOMBINER PROCEDURE 0004 B-44 FORT ST. VRAIN-2.2.2 A,B,C CONTROL ROOM ACCESS, TSC, OPERATIONAL SUPPORT CENTER
,0005' B-44 FORT ST. VRAIN-2.2.1 A,B,C SHIFT SUPER. RESP.,
STA, TURNOVER PROCEDURES i
21208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.
183 FACILITY IMPLEMENTATION 04/14/86
[RTSTVRAIN (CONTINUATION) s LC NO.
MPA 3 TITLE t
50006 B-44 FORT ST. VRAIN-2.1.8.C IMPROVED IODINE INST.
B-44 FORT ST. VRAIN-2.1.8.B HIGN RANGE RADIATION MONITORS (0007 0008 B-44 FORT ST. VRAIN-2.1.8.A POST ACCIDENT SAMPLING (0009 B-44 FORT ST. VRAIN-2.1.6.B SHIELDING REVIEN 0010 B-44 FORT ST. VRAIN-2.1.6.A SYSTEMS INTEGRITY FOR HIGN RADI0 ACTIVITY 0011 B-44 FORT ST. VRAIN-2.1.4 DIVERSE CONTAINMENT ISOLATION 0012 B-44 FORT ST. VKAIN-2.1.3.B INST. FOR CORE COOLING p(0013 B-44 FORT ST. VRAIN-2.1.3.A DIRECT INDICATION OF YALVE POSITION 50014 B-44 FORT ST. VRAIN-2.1.2 RELIEF & SAFETY VALVE TESTING 5631 F-47 FORT ST VRAIN - NUREG-0737 II.K.3.17, ECC "v5 TEM OUTAGES (6503 B-48 FT ST VRAIN-ADEQUACY OF STA EL. VOLTAGE 5828 F-57 FORT ST VRAIN - NUREG-0737 II.K.3.30, SB LOCA OUTLINE f8167 F-58 FT. ST. VRAIN -NUREG 0737 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46 h2925 B-59 FORT ST VRAIN - MASONRY HALL DESIGN. RESPONSE TO IE-BULLETIN 80-11
\\2527 B-60 FORT ST VRAIN - ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL EQUIPMENT (80-CLI-21) 2743 B-62 FORT ST VRAIN - ESF RESET CONTROL DESIGN DEFICIENCY -
ISE BULLETIN 80-06 3935 B-63 FT. ST. VRAIN - STATION BLACKOUT PROCEDURES
& TRAINING 5947-F-63 FORT ST VRAIN - NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER 6018 F-64 FORT ST VRAIN - NUREG-0737 III.A.1.2, OPERATIONAL SUPIJRT CENTER F-65 FORT ST VRAIN - NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY (6090 6162 F-66 FORT ST VRAIN - III.A.2 NUCLEAR DATA LINK DATA F-67 FORT ST VRAIN - III. A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE l
(6234
- 6306 F-68 FORT ST VRAIN - NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE
- -1208731-001 REGULAT0RY INF0RMATION TRACKING SYST&M PAGE NO.
- 184 FACILITY IMPLEMENTATION 04/14/86
' ORT ST VRAIN (CONTINUATION)
'AC NO.
MPA 9 TITLE 146577 F-69 FORT ST VRAIN - NUREG-0737 III.D.3.3, INPLANT RADIATION MONITORING I46617 B-70 FT. ST. VRAIN - MONITORING OF FATIGUE TRANSIENT LIMITS FOR THE REACTOR COOLANT SYSTEM 146448 F-70 FORT ST VRAIN - NUREG-0737 III.D.3.4, CONTROL ROOM HABITABILITY 156125 F-71 FORT ST. VRAIN - I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
SUMMARY
REPORT - F-71 152759 B-76 FORT ST. VRAIN - ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION AND PROCEDURES 152840 B-77 FORT ST. VRAIN - ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - RTS COMPONENTS 152921 B-78 FORT ST. VRAIN - ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING PROCEDURES / VENDOR RECOMMENDATIONS - RTS COMPONE 153002 B-79 FT ST VRAIN-ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH SPECS-RTS COMPONENTS l54535 B-83 FORT ST. VRAIN - TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36, 83-37 FOR HUREG-0737 153591 B-85 FORT ST. VRAIN - ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY l23674 B-86 FORT ST. VRAIN - ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - ALL SR COMPONENTS
'53757 B-87 FT ST VRAIN-ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND VENDOR RECOMMENDATIONS - ALL SR COMPONEN 23840 B-88 FORT ST. VRAIN - ITEM 3.2.3 - POST-MAINTENANCE TESTING
-CHANGES TO TECH. SPEC. - ALL SR COMPONENTS 54067 B-92 FORT ST. VRAIN - ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE TRIP FEATURES 53984 B-93 FORT ST. VRAIN - ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING - ALTERNATIVES & TEST INTERVA
- - - -