ML20203N399
| ML20203N399 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/16/1986 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Florida Power Corp, City of Alachua, FL, City of Bushnell, FL, City of Gainesville, FL, City of Kissimmee, FL, City of Leesburg, FL, City of New Smyrna Beach, FL, Utilities Commission, City of New Smyrna Beach, FL, City of Ocala, FL, City of Orlando, FL, Orlando Utilities Commission, Sebring Utilities Commission, Seminole Electric Cooperative, City of Tallahassee, FL |
| Shared Package | |
| ML20203N401 | List: |
| References | |
| DPR-72-A-091 NUDOCS 8610080221 | |
| Download: ML20203N399 (7) | |
Text
_ -_ - _______________
a no p
UNITED STATES
+
., g y.
g NUCLEAR REGULATORY COMMISSION r
- y WASHINGTON. D. C. 20SS5
%...../
FLORIDA POWER CORPORATION CITY 0. ALACHUA CITY OF BUSHNELL CITY OF GAINESVILLE CITY OF KISSIMMEE CITY OF LEESBURG 4
CITY OF NEW SMYRNA BEACH AND UTILITIES COMMISSION, CITY OF NEW SMYRNA BEACH CITY OF OCALA ORLANDO UTILITIES COMMISSION AND CITY OF ORLANDO SEBRING UTILITIES COMMISSION SEMINOLE ELECTRIC COOPERATIVE, INC.
CITY OF TALLAHASSEE i
DOCKET NO. 50-302 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.~91 License No. DPR-72 I
i 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Florida Power Corporation, et al.
(the licensees) dated April 23, 1984, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The fa'.ility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
Tnere is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be' conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
8610080221 860916 DR ADOCK 05000302 PDR
^
.m i
1 r 2.
Accordingly, the license is amended by changes to the Technical Specificationsuas indicated in the attachment to this license amendment, a
and paragraph 2.C.(2) of Facility Operating License No. DPR-72 is hereby j
amended to read as follows:
l Technical Specifications i
The Technical Specifications contained in Appendices A and B, as revised througn Amendment No. 91, are hereby incorporated in the license.
Florida Power Corporation shall operate the facility in accordance with the Technical Specifications.
i i
3.
This license amendment is effective as of its date of issuance.
i FOR THE NUCLEAR REGULAT Y COMMISSION l
/
/
)
i Joh
- 45. Stolz, Director i
PWR Project Directorate Di sion of PWR Licensing-B i
Attachment:
i Changes to the Technical Specifications Date of Issuance: September 16, 1986 i
I
)
k l
1 J
i
~
=
l ATTACHMENT TO LICENSE AMENDMENT NO. 91 FACILITY OPERATING LICENSE NO. DPR-72 i
DOCKET NO. 50-302 h
e l
Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by Amendment number and j
contain vertical lines indicating the area of change. The corresponding j
overleaf pages are also provided to maintain document completeness.
Remove Insert 3/4 6-17 3/4 6-17 3/4 6-21 3/4 6-21 l
3/4 6-21a 3/4 6-21a i
1 1
q I
i l
i 1
l I
d 1
i 1
TABLE 3.6-1 CONTAINMEtN ISOLATION VALVES VALVE NUMBER.
FUNCTION.,
ISOLATION TIME (seconds)
A.
CONTAINMENT ISOLATION 1.
BSV-27 check #
closed dur. nor, operation NA and open dur. RB spray BSV-3 #
'60 BSV-26 check #
NA BSV-4 #-
60 2.
CAV-126(A)*+
iso. CA sys. fr. RC.letcin.
60 '
CAV-1 (A)*+
iso. CA sys. fr. pzr.
60 CAV-3 (A)*+
60 1
CAV-2 (B)*+
iso. CA sys. fr. RB 60 i CAV-4 # (A)*
isolate liquid sampling 60 system CAV-6 f 60 CAV-5 f 60 CAV-7 i 60 3.
CFV-20 check iso. N2 supply fr. CFT-1A NA l CFV-28(A/B)*+
60 CFV-18 check
. iso. MU system fr.' CFT-1B NA CFV-26(A/B)*+
60 l CFV-19 check iso. MU system fr. CFT-1A NA CFV-25 (A/B)*+
60 l CFV-42(C)*.+
. iso. liquid sampling fr.
60 'l CF system iso. WD sys fr. CF tanks 60 CFV-15 60 CFV-16 60 CFV-29 CFV 11 (A)*+
iso. CF tanks fr. liquid 60 l 4
sampling system
.CFV-12 (A)* +
60, l CFV-17 check iso. N2 supply fr. CFT-1B HA CFV-27
( A/8 ) * +
60 l CRYSTAL' RIVER - UNIT 3 3/4 6-17 Amendment flo. X#, S A,91
m r
.w - - w p
TABLE 3.6-1 (Continued)
CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds) 4.
CIV-41*
iso. CI sys. fr. RB 60 CIV-40*
60 CIV-34*
60 CIV-35*
6 0.,
5.
DHV-93 check iso. DH system fr. pzr.
NA DHV-91*
60 l DHV-43 #
120 DHV-42 i 120
~
DHV-4# & 41#
iso. DH sys. fr. RC 120 DHV-6 #
iso. DH system from 60 Reactor Vessel DHV-5 #
60 6.
DWV-162 check iso. DW system fr. RB NA DWV-160(A/BP 60 7.
FWV-44 check i iso. feedwater NA from RCSG-1A
,FWV-45 check #
NA FWV-43 check [
iso. feedwater NA from RCSG-18 FWV-46 check #
NA 8.
MSV-130 f(A/B)*
iso. MDT-1 from RCSG-1A
.60 MSV-148 f(A/B)*
iso. MDT-1 from RCSG-1B 60 MSV-411 #
- iso. main steam lines 60 from RCSG-1A MSV-412 i
- iso. main steam lines 60 from RCSG-1A HSV-413 #
- iso. main steam lines 60 from RCSG-1B MSV-414 #
- iso. main steam lines 60 from RCSG-1B i
i CRYSTAL. RIVER - UNIT 3 3/4 6-18 Amendment No. 38,6 3 s
..~
(
l TABLE 3.6-1 (continued)
CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds) i LRV-43 Iso. LR test panel from RB NA NA LRV 44 NA j
LRV 46 lso. H recombiner ports from RB NA LRV-87 & 88*
2 NA LRV-89 & 90*
LRV-91 & 92*
NA NA LRV-93 & 94*
3.
MSV-146 #
iso. misc. waste storage NA tank from RCSG-1B NA MSV-128 #
4.
NG V-62 1so. NG system from steam NA generators NA NGV-81 #
NGV-82
_ Iso. NG system from par.
NA
! i 5.
SAY-24+
,.I * '
SAV-23+
NA I
i.
SAV-122 NA 6.
SFV-18 Iso. SF system NA SFV-19 NA SFV-Il9#
iso. Fuel Transfer tubes NA l
from F. T. Canal l
SFV-120#
NA 1
7.
WSV-1 Ise. containment monitoring.
NA system from RB WSV-2 NA D.
PENETRATIONS REQUIRING l
TYPE B TESTS Blind Flange 119 iso. RB NA Blind Flange 120 NA
)
Blind Flange 202 NA i
i j
8
+
CRYSTAL RIVER - UNIT 3 3/4 6-21 Anendments Nos. 17, i$. 7S.) 91 '
t
i TABLE 3.6-1 (Continued)
CONTAINM5NT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds)
Blind Flange 348 iso. fuel transfer tube from Nh' Transfer ~ Canal BTind Flange 436 NA Equipment Hatch iso. RB NA Personnel Hatch iso. RB NA i Not subject to Type C Leakage Test
- The provisions of' Specification 3.0.4 are not applicable.
+ May be opened on an intermittent basis under administrative ~
control consisting of a dedicated operator stationed at the valve in continuous communication with the control room with necessary parameters to rapidly isolate the penetration on a valid indication.
(A)~
Isolates on Diverse Isolation Actuation Signal A (B)
Isolates on Diverse Isolation Actuation Signal B (A/B) Isola'tes on Diverse Isolation Actuation Signal A or B
\\
l l
l i
l l
l i
l CRYSTAL. RIVER'2 UNIT 3 3/4 6-21a AmendmentNo.#M9I t