ML20203C171
| ML20203C171 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/08/1986 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20203C177 | List: |
| References | |
| NUDOCS 8607180371 | |
| Download: ML20203C171 (2) | |
See also: IR 05000348/1986011
Text
.,
..*
,e p-
JUL
a 1985
I
Docket Nos. 50-348, 50-364
.
Alabama Power Company
i
SATTN: Mr. R. P. Mcdonald
Senior Vice President
P. O. Box 2641
-
!
Birmingham, AL 35291
Gentlemen:
'
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NOS. 50-348/86-11 AND 50-364/86-11)
,
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted-by
!
W. H. Bradford on May 14 - June 10,1986.
The inspection included a review of
t
activities authorized for your Farley facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified .in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations ' of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities appeared to violate NRC
requirements. The violations, references to pertinent requirements, and elements
to be included in your response are described in the enclosed Notice of Viola-
tion.
'
f
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
!
Title 10, code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
,
Should you have any questions concerning this letter, please contact us.
!
Sincerely,
OltlGINAL SIGNfD BY
DAVID M. VERRELLI
David M. Verre111, Chief
Reactor Projects Branch 2
Division of Reactor Projects
,
Enclosures:
1.
2.
NRC Inspection Report
cc w/encis:
(See page 2)
~
8607180371 860708
i I
ADOCK 05000340
G
520)
-
-
-
,.;
.... .-
-
.-.
_ -
.-
..
.
. ..-
. .
.
(~
,,.
.
,
Alabama Power Company
2
<
cc w/encis:
lY. 0, Whitt, Executive Vice President
,
p)(Nuclear PlantD. Woodard, General Manager - -
p G. Hairston, III, General Manager -
Nuclear Support
V. W. McGowan, Manager-Safety. Audit
d.andEngineeringReview
K. Osterholtz, Supervisor-Safety
Audit and Engineering Review
'
,)ccw/encis:
,
'NRC Resident Inspector
E. Reeves, Project Manager, NRR
Document Control Desk
State of Alabama
I
I
I
4
,
h.D h
,
g m ) n.rHC0ance
Tlq\\%*
We-+F-