MONTHYEARML18107A5571999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr ML18107A5581999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr ML18107A5301999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr ML18107A5311999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 ML18107A4811999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr ML18107A4821999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr ML18107A4341999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr ML18107A4351999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr ML18107A3681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With 990611 Ltr ML18107A3721999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With 990611 Ltr ML18107A2991999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 1.With 990514 Ltr ML18107A3711999-04-30030 April 1999 Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1 ML18107A2971999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 2.With 990514 Ltr ML18107A1831999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 2.With 990414 Ltr ML18107A1821999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 1.With 990414 Ltr ML18106B1021999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 2.With 990315 Ltr ML18106B1011999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 1.With 990315 Ltr ML18106B0571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With 990212 Ltr ML18106B0561999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With 990212 Ltr ML18106B0261998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 1.With 990115 Ltr ML18106B0251998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 2.With 990115 Ltr ML18106A9831998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Salem,Unit 2.With 981214 Ltr ML18106A9801998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Salem,Unit 1.With 981214 Ltr ML18106A9641998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Salem,Unit 2. with 981112 Ltr ML18106A9631998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Salem,Unit 1. with 981112 Ltr ML18106A9151998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Salem,Unit 2.With 981012 Ltr ML18106A9131998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Salem,Unit 1.With 981012 Ltr ML18106A8751998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Salem Generating Station,Unit 2.With 980915 Ltr ML18106A8741998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Salem Unit 1.With 980915 Ltr ML18106A8161998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Salem,Unit 1. W/980817 Ltr ML18106A8151998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Salem,Unit 2. W/980817 Ltr ML18106A7151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Salem,Unit 2. W/980715 Ltr ML18106A7141998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Salem,Unit 1. W/980715 Ltr ML18106A6541998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Salem Unit 1. W/980615 Ltr ML18106A6531998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Salem Unit 2. W/980615 Ltr ML18106A6121998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Salem Generating Station,Unit 1.W/980515 Ltr ML18106A6111998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Salem Unit 2. W/980515 Ltr ML18106A5561998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Salem,Unit 1. W/980415 Ltr ML18106A4591998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Salem Unit 2. W/980415 Ltr ML18106A3771998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Salem Generating Station,Unit 1.W/980316 Ltr ML18106A3761998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Salem Generating Station,Unit 2.W/980316 Ltr ML18106A3281998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Salem,Unit 2. W/980217 Ltr ML18106A3271998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Salem,Unit 1. W/980217 Ltr ML18106A2721997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Salem,Unit 2. W/980115 Ltr ML18106A2711997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Salem Generating Station,Unit 1.W/980115 Ltr ML18106A2081997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Salem,Unit 1. W/971212 Ltr ML18106A2071997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Salem,Unit 2. W/971212 Ltr ML18102B6811997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Salem,Unit 2.W/ 971117 Ltr ML18102B6801997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Salem,Unit 1.W/ 971117 Ltr ML18102B6271997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Salem,Unit 2. W/971015 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML18107A5581999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr ML18107A5571999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr ML18107A5301999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr ML18107A5311999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 ML18107A5031999-08-26026 August 1999 LER 99-006-00:on 990729,determined That SG Blowdown RMs Setpoint Was non-conservative.Caused by Inadequate ACs for Incorporating Original Plant Licensing Data Into Plant Procedures.Blowdown Will Be Restricted.With 990826 Ltr ML18107A5201999-08-12012 August 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#9) Second Interval,Second Period, First Outage (96RF). ML18107A4811999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr ML18107A4821999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr ML18107A4691999-07-28028 July 1999 LER 99-008-00:on 990714,determined That Limit Switch Cables Were Subject to Multiple Hot Shorts in Same Fire Area.Caused by Inadequate Original Post Fire Safe Shutdown Analysis.All Limit Switch Cables for MOVs Were Reviewed.With 990728 Ltr ML18107A4441999-07-0606 July 1999 LER 99-007-00:on 990605,surveillance for Quadrant Power Tilt Ratio (QPTR) Was Missed.Caused by Human Error.Qptr Calculation Was Performed & Personnel Involved Have Been Held Accountable IAW Pse&G Policies.With 990706 Ltr ML18107A4211999-07-0202 July 1999 LER 99-005-00:on 990605,11 Containment Declared Inoperable. Caused by Valves 11SW72 & 11SW223 Both Leaking.Procedure S1.OP-ST.SW-0010(Q) Was Enhanced to Provide Specific Instructions to Ensure Proper Sequencing.With 990702 Ltr ML18107A4331999-07-0101 July 1999 LER 99-002-01:on 990405,determined That 2SA118 Failed as Found Leakrate Test.Caused by Foreign Matl Found in 2SA118 valve.2SA118 Valve Was Cycled Several Times & Seat Area Was Air Blown in Order to Displace Foreign Matl.With 990701 Ltr ML18107A4321999-07-0101 July 1999 LER 99-006-01:on 990501,determined That There Was No Flow in One of Four Injection Legs.Caused by Sticking of Valve in Safety Injection Discharge Line to 21 Cold Leg.Valve Was Cut Out of Sys & Replaced.With 990701 Ltr ML18107A5211999-07-0101 July 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#10) Second Interval,Second Period,Second Outage (99RF). ML18107A4351999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr ML18107A4341999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML18107A3951999-06-17017 June 1999 LER 99-004-00:on 990520,reactor Tripped from 100% Power,Due to Negative Flux Trip Signal from Nuclear Instrumentation. Cause Has Not Been Determined.Discoloration Was Identified on One of Penetrations.With 990617 Ltr ML18107A3661999-06-0909 June 1999 LER 99-003-00:on 990513,unplanned Entry Into TS 3.0.3 Was Made.Caused by Human error.Re-positioned Creacs Supply Fan Selector Switches & Revised Procedures S1 & S2.OP-ST.SSP-0001(Q).With 990609 Ltr ML18107A3551999-06-0202 June 1999 LER 99-005-00:on 990504,failure to Meet TS Action Statement Requirements for High Oxygen Concentration in Waste Gas Holdup Sys Occurred.Caused by Inability of Operators. Existing Procedures Will Be Evaluated.With 990602 Ltr ML18107A3441999-06-0101 June 1999 Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716 ML18107A3541999-06-0101 June 1999 LER 99-006-00:on 990501,HHSI Flow Balance Discrepancy Was Noted During Surveillance.Caused by Sticking of Check Valve in SI Discharge Line to 21 Cold Leg.Valve 21SJ17,was Cut Out of Sys & Replaced.With 990601 Ltr ML18107A3681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With 990611 Ltr ML18107A3721999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With 990611 Ltr ML18107A2931999-05-12012 May 1999 LER 99-002-00:on 990413,determined That Number 12 Auxiliary Bldg Exhaust Fan Was Rotating Backwards.Caused by mis-wiring of Motor Due to Human Error by Maint technician.Mis-wiring Was Corrected & Fan Was Returned to Svc.With 990512 Ltr ML18107A2781999-05-10010 May 1999 LER 99-004-00:on 990411,automatic Actuation of ESF Occurred During Reactor Vessel Head Removal in Support of Refueling Operations.Caused by High Radiation Condition.Containment Atmosphere Was Monitored.With 990505 Ltr ML18107A2791999-05-0404 May 1999 LER 99-003-00:on 990406,all Salem Unit 2 Chillers Rendered Inoperable.Caused by Human Error.Lessons Learned from Event Were Communicated to All Operators by Including Them in Night Orders.With 990504 Ltr ML18107A2741999-05-0303 May 1999 LER 99-002-00:on 990405,determined That Containment Isolation Valve Failed as Found Leakrate Test.Caused by Foreign Matl Blocking Valves from Closing.Check Valve Mechanically Agitated.With 990504 Ltr ML18107A3711999-04-30030 April 1999 Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1 ML18107A3151999-04-30030 April 1999 Submittal-Only Screening Review of Salem Generating Station Individual Plant Exam for External Events (Seismic Portion), Rev 1 ML18107A2991999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 1.With 990514 Ltr ML18107A2971999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 2.With 990514 Ltr ML18107A2351999-04-23023 April 1999 LER 99-001-00:on 990330,MSSV Failed Lift Set Test.Caused by Setpoint Variance Which Is Result of Aging.Valves Were Adjusted & Retested to Ensure TS Tolerance.With 990423 Ltr ML18107A2881999-04-0707 April 1999 Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. ML18107A1821999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 1.With 990414 Ltr ML18107A1831999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 2.With 990414 Ltr ML18106B1471999-03-29029 March 1999 LER 99-001-00:on 990228,reactor Scram Was Noted as Result of Turbine Trip.Caused by Operator Error.Lesson Plans Revised to Explicitly Demonstrate Manner in Which Valve Functions. with 990329 Ltr ML18106B1021999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 2.With 990315 Ltr ML18106B1011999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 1.With 990315 Ltr ML18106B0931999-02-25025 February 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified ML18106B0701999-02-16016 February 1999 LER 98-015-00:on 981208,inadvertent Discharge Through RHR Relief Valve During Startup Was Noted.Caused by Operator Performing Too Many Tasks Simultaneously.Appropriate Actions Have Been Taken IAW Policies & Procedures.With 990216 Ltr ML18106B0551999-02-0101 February 1999 Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl ML18106B0561999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With 990212 Ltr ML18106B0571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With 990212 Ltr ML20205P1671999-01-31031 January 1999 a POST-PLUME Phase, Federal Participation Exercise ML18106B0441999-01-29029 January 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables ML18106B0491999-01-28028 January 1999 LER 98-007-01:on 980730,reactor Coolant Instrument Line through-wall Leak Was Noted.Caused by Transgranular Stress Corrosion Cracking.Replaced Affected Tubing.With 990128 Ltr ML18106B0401999-01-18018 January 1999 LER 98-016-00:on 981219,ECCS Leakage Was Outside of Design Value.Caused by Leakage Past Seat of 21RH34 Manual Drain. Valve 21RH34 Was Reseated.With 990118 Ltr ML18106B0251998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 2.With 990115 Ltr 1999-09-30
[Table view] |
Text
__
OPERATING DATA REPORT Docket No. 50-311 Date June 10,1986 Completed by Telephone 935-6000 Pell White Extension 4451 Operating Status
- 1. Unit Name Salem No. 2
- 2. Notes Reporting Period May 1986
- 3. Licensed Thermal Power (MWt) 3411
- 4. Nameplate Rating (Gross MWe) TITU
- 5. Design Electrical Rating (Net MWe) TTTI
- 6. Maximum Dependable Capacity (Gross MWe)TTTT
- 7. Maximum Dependable Capacity (Net MWe) 1106
- 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A
- 9. Power Level to Which Restricted, if any (Net MWe) N/A
- 10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
- 11. Hours in Reporting Period 744 3623 40608
- 12. No. of Hrs. Reactor was Critical 713.4 3128.0 23453.8
- 13. Reactor Reserve Shutdown Hrs. 0 0 3533.6
- 14. Hours Generator On-Line 700.0 3087.7 -
- 15. Unit Reserve Shutdown Hours 0
- 17624.5 0 0
- 16. Gross Thermal Energy Generated (MWH) 2324078
- 17. Gross Elec. Energy Generated 10233464 69979162 (MWH) 750850
- 18. Net Elec. Energy Generated (MWH) 3363200 22939680 718914 3219044 21753888
- 19. Unit Service Factor 94.1 85.2
- 20. Unit Availability Factor 94.1 85.2 55.7 I
- 21. Unit Capacity Factor 55.7 (using MDC Net) 87.4
- 22. Unit Capacity Factor 80.3 48.4 (using DER Net) 86.7
- 23. Unit Forced Outage Rate 79.7 48.0 l
5.9 12.3 34.7
- 24. Shutdowns scheduled REFUELING 9-20-86 over next 6 months (type, date and duration of each) ,
- 25. If shutdown at end of Report Period, Estimated Date of Startup l
N/A
- 26. Units in Test Status (Prior to Commercial Operation) :
Forecast Achieved Initial Criticality 6/30/80 8/2/80 I:.itial Electricity 9/1/80 6/3/81 8-1-7.R2 Commercial Operation 9/24/80 10/13/81 8607130247 DR 860531 ADOCK 05000311 PDR. TEM
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-311 Unit Name Salem # 2 Date June 10,1986 Completed by Pell White Telephone 609-935-6000 Extension 4451 Month May 1986 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 930 17 1057 a
2 0 18 1064
- 3 0 19 1060 4 771 20 1065 i
j 5 1059 21 1054
[
]
6 1067 22 1050 1
7 1065 23 899 i
8 1081 24 1026
- 9 1075 25 1049 j 10 1058 26 1048
! 11 999 27 1032 j 12 1068 28 1052 1
j 13 1057 29 1052 14 1065 30 1047 15 1065 31 1014 4
16 1071 Pg. 8.1-7 R1 i
> \
b l i
4 1
l
UNIT SHUTDOWN AND POWER REDUCTIONS Docket No. 50-311 REPORT MONTH MAY 1986 Unit Name Salem No.2 .
Date June 10,1986 Completed by Pell White Telephone 609-935-6000 Extension 4451 .
Method of Duration Shutting License Cause and Corrective No. Date Type Hours Reason Down Event System Component Action to 1 2 Reactor Report Code 4 Code 5 Prevent Recurrence Other Nuclear Reactor -
268 0501 F 5.2 A 5 -
SF VESSEL Problems Misc.
Other Nuclear Reactor 270 0502 F 44.0 A 1 -
SF VESSEL Problems Misc.
Loss of Vacuum /High 320 0523 F 12.4 A 5 -
HC HTEXCH Back Pressure Feedwater Pump Drive 348 0531 F 2.1 A 5 -
CH PUMPXX Lube Oil System 1 2 Reason 3 Method 4 Exhibit G S Exhibit 1 F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as S: Scheduled B-Maintenance or Test 2-Manual Scram. for Prepara- Source C-Refueling 3-Automatic Scram, tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161)
MAJOR PLANT MODIFICATIONS DOCKET NO.: 50-311 REPORT MONTH MAY 1986 UNIT NAME: Salem 2 DATE: June 10, 1986 COMPLETED BY: J. Ronafalvy TELEPHONE: 609/339-4455
- DCR NO. PRINCIPAL SYSTEM SUBJECT I
2EC-1501 Diesel Generators Install control circuit transfer switches on the engine and generator control panels of each diesel generator to enable an operator to start the diesel generators under postulated fire and blackout conditions.
2EC-1566 Chilled Water System Install a 10 PSIG regief valve at the chilled water expansion tank.
2EC-1785 Safe Guards Emergency Install new Lamda Power !
Controls Supplies new Potter ;
Brumfield relays in 2B SEC, j 2A SEC and 2C SEC. l 2EC-1970 Containment Personnel Install caps and valving 1
Hatch at personnel hatch -
El. 100 & 130, 2EC-2000 Main Reheat & Turbine Replace turbine first stage Bypass impulse pressure pressure transmitters PA-0195 and PA-0216 and mount so as to reduce vibration.
2SC-1168 Reactor Coolant System Change reactor coolant flow transmitter from Fisher Porter model # 10B2496PB to new model and type specified ;
by Engineering.
i Design Change Request i
MAJOR PLANT MODIFICATIONS DOCKET NO: 50-311 REPORT MONTH - MAY 1986 UNIT NAME: SALEM 2 DATE: MAY 10, 1986 COMPLETED BY: J. RONAFALVY TELEPHONE: (609)339-4455
- DCR SAFsTY EVALUATION 10 CFR 50.59 2EC-1501 This design change improves the plant safety by making vital power available much sooner during ce.rtain postulated fire plus blackout conditions.
Failure of the control transfer switch may cause the ' associated diesel to fail to start during a safeguards actuation. This failure is considered to be within the realm of the single failure criteria. This modification does not alter any plant process or discharge. Therefore, no unreviewed safety or environmental questions are involved.
2EC-1566 This design change does not jeopardize the pressure retaining boundary nor impact the operation or basic design criteria of the Chilled Water System. This modification does not alter any plant process or discharge. Therefore, no unreviewed safety or environmental questions are involved.
2EC-1785 This design change replaced existing components with ones manufactured by a different vendor.
The replacement components have been seismically qualified to IEEE 344 which is to the same or higher stress levels as the original equipment.
This modification does not alter any plant process or discharge. Therefore, no unreviewed safety or environmental questions are involved.
2EC-1970 All realistic failure modes have been considered but are not applicable.
1 This design change meets GDC 56 requirements and complies with safety Guide #11. The additional equipment meets the design criteria of seismic I and nuclear class II. This modification does not alter any plant process or discharge. Therefore, no unreviewed safety or environmental questions are involved.
Design Change Request 1
.i
~ UNIT 2 MAJOR PLANT MODIFICATIONS (contd) i REPORT MONTH - MAY 1986
2EC-2000 The existing transmitters malfunction. The replacement ones are of better design. There is no functional change in the system or component.
This modification does not alter any plant process or discharge. Therefore, no unreviewed safety or environmental questions are involved.
2SC-1168 All potential, realistic failure modes have been considered but are not applicable. Regulatory requirements do nce apply. The replacement transmitters do not modify the function of the system. The original transmitters are considered obsolete by the manufacturer. This modification does not alter any plant process or discharge.
Therefore, no unreviewed safety or environmental questions are involved.
l l
I Design Change Request
_____..__m___.._________.___.__..m.___..________,____..________.__.______ _ . . _ _ __. _ . _ _ . _ _ _ _ . . - _ . _ . _ . . _ _ _ _ . . _ .
PSE&G SALEM GENERATING STATION SAFETY RELATED WORK ORDER LOG SALEM UNIT 2 WO NO UNIT EQUIPMENT IDENTIFICATION .
+
8604251090 2 21 CHILLER CONDENSER FAILURE DESCRIPTION: 21 CHILLER CONDENSER IIAS A TUBE LEAK.
CORRECTIVE ACTION: REPLACED DEFECTIVE CONDENSER TUBE, PRESSURE TESTED ;
SYSTEM. REPLACED FILTER, DRYERS AND OIL.
8605020580 2 RTD ORIFICE i
FAILURE DESCRIPTION: 22 RCP COLD LEG BYPASS RTD ORIFICE IS BLOWING AND LEAKING ONTO FLOOR.
CORRECTIVE ACTION: REPLACED GASKET IN FLANGES.
8605121173 2 21 SW PUMP AUTO CONTROL ,
FAILURE DESCRIPTION: 21 SERVICE WATER PUMP WILL NOT STAY IN THE AUTO CONTROL MODE.
CORRECTIVE ACTION: INSTALLED NEW OPERATE RESET RELAY IN BAILEY CABINET RC-116.
-r
- - _ _ _ _ v ,_s4 _ m1-
I SALEM UNIT 2 9
WO NO UNIT EQUIPMENT IDENTIFICATION 8605121513 2 26 SW PUMP FAILURE DESCRIPTION: PUMP HAS EXCESSIVE PACKING LEAKAGE.
CORRECTIVE ACTION: REPACKED PUMP. l 1 -
! 8605140500 2 21 SW STRAINER FAILURE DESCRIPTION: STRAINER HAS A SEVERE PACKING LEAK.
CORRECTIVE ACTION: REPLACED PACKING.
l 8605150882 l 2 REACTOR VESSFL FLANGE LEAKOFF INDICATOR
\
! FAILURE DESCRIPTION: BEZEL INDICATION HAS FAILED HIGH, VERIFIED VESSEL LEAKOFF WITH COMPUTER POINT.
CORRECTIVE ACTION: FOUND LOWER LEVEL AMP 2TM-401 FAILED HIGH. REPLACED S/N E092 WITH S/N E040. CALIBRATED TO AS LEFT VALUES OF TABLE 20.0 PAGE 5 OF 2IC-2.10.047.
RETURNED CHANNEL TO SERVICE. TEMPERATURE INDICATION WAS 87 DEGREES F.
ci i
i r--- -,- ,. _
l . . .
SALEM UNIT 2 .
WO NO UNIT EQUIPMENT IDENTIFICATION 8605190019 2 ACCUMULATOR LEVEL CHANNEL FAILURE DESCRIPTION: #24 ACCUMULATOR CHANNEL 2 LEVEL HI-LO ALARM IS ILLUMINATED. NO APPARENT LEVEL PROBLEM.
CORRECTIVE ACTION: REPLACED PC BOARD IN RELAY RACK #112 AND TESTED OKAY.
8605200073 f 2 CHARGING FLOW ORIFICE l FAILURE DESCRIPTION: NO CLOSED INDICATION. ,
CORRECTIVE ACTION- REALIGNED LIMIT SWITCH ACTUATING hRM AND I TIGHTENED. TI'GHTENED LIMIT SWITCH BRACKET.
! CONTROL STROKED AND VERIFIED LIMITS.
SALEM GENERATING STATION MONTHLY OPERATING
SUMMARY
- UNIT NO. 2 MAY 1986 SALEM UNIT NO. 2 The Unit began the period operating at full power. On May 2, 1986 at 1717 hours0.0199 days <br />0.477 hours <br />0.00284 weeks <br />6.533185e-4 months <br />, a controlled shutdown was initiated to perform
, environmental equipment qualification inspections in the Containment.
As the Unit was taken off the line, on May 3, 1986 at 0332 hours0.00384 days <br />0.0922 hours <br />5.489418e-4 weeks <br />1.26326e-4 months <br />, a Reactor Trip with Safety Injection occurred due to "High Steam Line Flow With Low Tave" which was apparently caused by a steam flow spike when the Generator output breakers were opened. On May 3, 1986 at 2231 hours0.0258 days <br />0.62 hours <br />0.00369 weeks <br />8.488955e-4 months <br />, the Turbine was latched and power ascension to full power operations was initiated. Unit power was reduced to 65% on May 11, 4
1986 at 0220 hours0.00255 days <br />0.0611 hours <br />3.637566e-4 weeks <br />8.371e-5 months <br /> due to limited system load demand. The Unit was returned to full power the same day at 0642 hours0.00743 days <br />0.178 hours <br />0.00106 weeks <br />2.44281e-4 months <br />. During the period from May 23, 1986 to May 25, 1986 minor load reductions were required due to high river grasses and debris causing Circulating Water System problems. On May 31, 1986 at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> a load reduction to 61% was commenced in order to remove #21 SGFP from service for replacement of the governor. On June 1, 1986 at 1515 hours0.0175 days <br />0.421 hours <br />0.0025 weeks <br />5.764575e-4 months <br />, work on #21 SGFP was completed and the Unit was returned to 100% power where it remained for the rest of the period.
I 1
l l
1
e REFUELING INFORMATION DOCKET NO.: 50-311 COMPLETED BY: J. Ronafalvy UNIT NAME: Salem 2 DATE: June 10, 1986 TELEPHONE: 609/935-6000 EXTENSION: 4455
{ Month May 1986 i
- 1. Refueling information has changed from last month:
- YES NO X
- 2. Scheduled date for next refueling: September 20, 1986 1
- 3. Scheduled date for restart following refueling: November 19, 1986 l
- 4. A) Will Technical Specification changes or other license amendments be required? .
YES NO '
Not determined to date B) Has the reload fuel design been reviewed by the Station Operating Review Committee?
i YES NO X If no, when is it scheduled? August 1986
- 5. Scheduled data (s) for submitting proposed licensing action:
August 1986 if required j 6. Important licensing considerations associated with refueling:
NONE I
i j 7. Number of Fuel Assemblies
- A) Incore
' 193 B) In Spent Fuel Storage 140 i
- 8. Present licensed spent fuel storage capacity: 1170 Future spent fuel storage capacity: 1170
- 9. Date-of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity: March 2003 8-1-7.R4 l )
J O PSEG Putsc Service Electnc and Gas Company P O Box E Hancocks Brutge, New Jersey 08038 Salem Generating Station June 10, 1986 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Sir:
MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specification, 10 copies of the following monthly operating reports for the month of Ma) 1986 are being sent to you.
Average Daily Unit Power Level I Operating Data Report Unit Shutdowns and Power Reductions )
i Major Plant Modification Safety Related Work Orders I operating Summary Refueling Information Sincerely yours, !
J. M. Zupko, Jr.
General Manager - Salem Operations )
JRtal cc: Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Director, Office of Management i U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 l Enclosures 1 8-1-7.R4 1