,_
_ _. _ ~. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.. _. _ _ _ _ _ _ _ _ _ _ _ _
' joMg
- 4 UNITED STATES g
j NUCLEAR REGULATORY COMMISSION i
2 WASHINGTON, D.C. 30806 4001 i
POWER AUTHORITY OF THE STATE OF NEW YORK _
DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT AMENDMENT TO FACILITY OPERAT;NG LICENSE Amendment No. 250 License No. DPR-59 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Power Authority of the State of New York l
(the licensee) dated March 22,1996, revised and supplemented on Febmary 6, 1998, April 17,1998 and October 30,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the 1
Commission's mies and regulations set forth in 10 CFR Chapter I; I
l B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; l
C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
This license is amended to approve the relocation of certain Technical Specification requirements to licensee-controlled documents, as described in the licensee's application i
dated July 10,1998, and reviewed in the staff's Safety Evaluation Report dated January 12,1999. This license is also hereby amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-59 is hereby amended to read as follows:
l l
9901250055 990112 PDR ADOCK 05000333 P
pg I
2-(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 250
. and the Environmental Protection Plan contained in Appendix B are incorporated into Facility License No. DPR-59. PASNY shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
In addition, the license it amended by revising paragraph 2.(F) as follows:
(F) The Additional Conditions contained in Appendix C as revised through Amendment No. 250 are hereby incorporated into this license. The Power Authority of the State of New York (PASNY) shall operate the facility in accordance with the Additional Conditions.
3.
This license amendment is effective as of the date of its issuance, to be implemented within 60 days of issuance. Implementation of this amendment shallinclude the relocation of certain technical specification requirements to the appropriate licensee-controlled documents as described in the Licensee's application dated March 22,1996, as revised and supplemented on February 6,1998, April 17,1998, and October 30,1998, and evaluated in the staffs Safety Evaluation attached to this amendment.
FOR THE NUCLEAR REGULATORY COMMISSION i
S. Singh Bajwa, Director Project Directorate 1-1 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation
Attachment:
- 1. Page 5 to License
- No. DPR-59 and page 1 of Appendix C to the license
- 2. Changes to the Technical Specifications Date of Issuance:
January 12, 1999
- Page 5 of the license and page 1 of Appendix C are attached, for convenience, for the composite license to reflect this change.
l F.
Additional Conditions The Additional Conditions contained in Appendix C, as revised through Amendment No. 250
, are hereby incorporated into this license.
PASNY shall operate the facility in accordance with the Additional Conditions.
l 3.
This license is effective as of the date of issuance and shall expire at midnight on October 17,2014.
l FOR THE NUCLEAR REGULATORY COMMISSION (ORIGINAL SIGNED BY: ROBERT W. REID)
Robert W. Reid, Chief Operating Reactors Branch #4 l
Division of Operating Reactors Attachments / Appendices:
l
- 1. Appendix A - Technical Specifications l
- 2. Appendix B - Radiological Effluent Technical Specifications l
- 3. Appendix C - Additional Conditions l
Date of issuance: June 3,1977 l
I I
l l
l l
l
)
APPENDIX C 1
l ADDITIONAL CONDITIONS OPERATING LICENSE NO. DPR-59 l
l Amendment Additional Conditions Number l
The Power Authority of the State of New York shall describe snubber operation and surveillance requirements in the Final Safety Analysis 243 Report such that future changes to those requirements will be subject to the provisions of 10 CFR 50.59.
animussamassa-The Power Authority of the State of New York shall relocate operability and surveillance requirements for logic bus power monitors, core spray 250 sparger differential pressure, and low pressure coolant injection cross-connect valve position instruments to an Authority controlled document where future changes to those relocated requirements are controlled under the provisions of 10 CFR 50.59.
l I
r l
i Amendment No. 250
i i
\\
\\
l ATTACHMENT TO LICENSE AMENDMENT NO. 250 FACILITY OPERATING LICENSE NO. DPR-59 DOCKET NO. 50-333 l
Revise Appendix A as follows:
Remove Paoes insert Paaes i
66 66 67 67 68 68 l
69 69 l
70 70 71 71 71a 71a l
71b 80 80 l
t i
l l
I l
l-2 4
l l
l l
i i
i JAFNPP TABLE 3.2-2 1
CORE AND CONTAINMENT COOLING SYSTEM INITIATION AND CONTROL INSTRUMENTATION OPERABILITY REQUIREMENTS 1
i Minimum No. of Total Number of Operable Instrument Instrument Channels it:m Channels Per Provided by Design i
No.
Trio System Trio Function Trio Level Settina for Both Trio Systems Remarks 1
2 Reactor Low-Low
> 126.5 in. above TAF 4 (HPCI & RCIC)
Initiates HPCI, RCIC, and (Notes 1,11)
Water Level SGTS.
4 2
2 Reactor Low-Low-
> 18 in. above TAF 4 (Core Spray & RHR) Initiates Core Spray, RHR (LPCI),
(Notes 2, 3,11)
Low Water Level and Emergency Diesel Generators.
4 (ADS)
Initiates ADS (if not inhibited by ADS override switches), in conjunction with Confirmatory Low Level,120 second delay and I
RHR (LPCI) or Core Spray pump discharge pressure interlock.
4 j
3 2
Reactor High Water 5 222.5 in, above TAF 2 (Note 16)
Trips HPCI turbine.
i (Notes 4,12)
Level 4
2 Reactor High Water 5 222.5 in. above TAF 2 (Note 16)
Closes RCIC steam supply (Notes 4,12)
Level valve.
5 1
Reactor Low Level
> 0 in. above TAF 2
Prevents inadvertent (Notes 5,11)
(inside shroud)
~
operation of containment spray during accident condition.
6 2
Containment High 1 < p < 2.7 psig 4
Prevents inadvertent operation (Notes 5,11)
Pressure of containment spray during accident condition.
Amendment No. 10,40,07,04,110,227,250.
66
I' JAFNPP i
TABLE 3.2-2 (Cont'd) a j
j CORE AND CONTAINMENT COOLING SYSTEM INITIATION AND i
CONTROL INSTRUMENTATION OPERABILITY REQUIREMENTS I
Minimum No. of Total Number of Operable instrument Instrument Channels Item Channels Per Provided by Design l
No.
Trio Svstem Trio Function Trio Level Settina for Both Trio Systems Remarks
)
7 1
Reactor Low Level
> 177 in. above TAF 2
Confirmatory low water
]
(Notes 3,11) level for ADS actuation.
8 2
Drywell High
< 2.7 psig 4
initiates Core Spray, RHR l
(Notes 1, 2,11)
Pressure (LPCI), HPCI and SGTS.
1 i
9 2
Reactor Low Pressure > 450 psig 4
Permits opening Core i
(Notes 6,11)
Spray and RHR (LPCI) c injection valves.
[
4 j
10 1
Reactor Low Pressure 50 < p <- 75 psig 2
Permits closure of RHR (Notes 2,12)
(LPCI) injection valves while l
in shutdown cooling in conjunction with PCIS signal.
l 11 1
Core Spray Pump 11 i O.6 sec.
1 (Note 16)
Initiates starting of (Notes 7,11)
Start Timer core spray pump.
t
]
(each loop)
(each loop) i 12 1
j (Notes 7,11)
Start Timer l
1st Pump (A Loop) 1.0 + 0.5 (-) O sec.
1 (Note 16)
Starts 1st Pump (A Loop) 1st Pump (B Loop) 1.0 + 0.5 (-) O sec.
1 (Note 16)
Starts 1st Pump (B Loop)
[
]
2nd Pump (A Loop) 6.0 i O.5 sec.
1 (Note 16)
Starts 2nd Pump (A Loop) 2nd Pump (B Loop) 6.0 i O.5 sec.
1 (Note 16)
Starts 2nd Pump (B Loop) i i
i i
i l
i Amendment No. 10, &^, 07, 04,110, 227, 250 l
67 1
,. _ - -. ~. _ _ _ _ _... _ _ -
3
JAFNPP 4
TABLE 3.2-2 (Cont'd)
CORE AND CONTAINMENT COOLING SYSTEM INITIATION AND CONTROL INSTRUMENTATION OPERABILITY REQUIREMENTS Minimum No. of Total Number of Operable Instrument Instrument Channels It:m Channels Per Provided by Design 4
No.
Trio System Trio Function Trio Level Settina for Both Trio Systems Remarks 13 1
Auto Blowdown Timer 120 sec.15 sec.
2 Initiates ADS (if not inhibited 4
(Notes 8,11) by ADS override switches).
4
]
14 4
RHR (LPCI) Pump 125 psig i 20 psig 8
Permits ADS actuation.
l (Notes 8,11)
Discharge Pressure interlock 4
1 15 2
Core Spray Pump 100 psig i 10 psig 4
Permits ADS actuation.
(Notes 8,11)
Discharge Pressure Interlock 16 2
Condensate Storage 2 59.5 in. above 2 (Note 16)
Transfers RCIC pump i
(Notes 9,11)
Tank Low Level tank bottom suction to suppression
(= 15,600 gal. avail) chamber.
2 17 2
Condensate Storage 2 59.5 in. above 2 (Note 16)
Transfers HPCI pump (Notes 9,11)
Tank Low Level tank bottom suction to suppression
(= 15,600 gal. avail) chamber.
)
18 2
Suppression Chamber s 6 in. above normal 2 (Note 16)
Transfers HPCI pump (Notes 9,11)
High Level level suction to suppression
- chamber, i
)
Amendment No. 10, 40, 04, 134, 227, 250 68
i JAFNPP TABLE 3.2-2 (Cont'd)
CORE AND CONTAINMENT COOLING SYSTEM INITIATION AND CONTROL INSTRUMENTATION OPERABILITY REQUIREMENTS Minimum No. of Total Number of Operable Instrument Instrument Channels item Channels Per Provided by Design No.
Trio System Trio Function Trio Level Settina for Both Trio Systems Remarks 19 (2 per 4kV bus) 4kV Emergency Bus 110.610.8 4
initiates both 4kV Emergency (Note 10)
Undervoltage Relay secondarv volts Bus Undervoltage Timers.
4 (Degraded Voltage)
(Degraded Voltage LOCA and j
non-LOCA) (Note 14) i 20 (1 per 4kV bus) 4kV Emergency Bus 8.96 i O.55 sec.
2 (Note 13)
(Note 10)
Undervoltage Timer 4
I (Degraded Voltage LOCA) 21 (1 per 4kV bus) 4kV Emergency Bus 43.812.8 sec.
2 (Note 13)
(Note 10)
Undervoltage Timer (Degraded Voltage non-LOCA) i 22 (2 per 4kV bus) 4kV Emergency Bus 8514.81 4
initiates 4kV Emergency Bus 4
(Note 10)
Undervoltage Relay secondary volts Undervoltage Loss of Voltage (Loss of Voltage)
Timer. (Note 15) 23 (1 per 4kV bus) 4kV Emergency Bus 2.50 i O.11 sec.
2 (Note 13)
(Note 10)
Undervoltage Timer (Loss of Voltage) 24 2
Reactor Low Pressure 285 to 335 psig 4
Permits closure of recirculation (Notes 6,11) pump discharge valve.
j
~ Amendment No. " "' '" " ' ^" 250 69
I i
j JAFNPP TABLE 3.2-2 CORE AND CONTAINMENT COOLING SYSTEM INITIATION ANQ CONTROL INSTRUMENTATION QPERABILITY REQUIREMENTS NOTES FOR TABLE 3.2-2 1.
With one or more channels inoperable for HPCI and/or RCIC:
1 A.
Within one hour from discavery of loss of system initiation capability, declare the affected system inoperable, and l
B.
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, place channel in trip.
C.
If required actions and associated completion times of actions A or B are not met, immediately declare the affected system inoperable.
2.
With one or more channels inoperable for Core Spray and/or RHR:
j A.
Within one hour from discovery of loss of initiation capability for feature (s) in both divisions, declare the supported features inoperable, and j
B.
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, place channelin trip.
1 C.
If required actions and associated completion times of actions A or B are not met, immediately declare associated supported l
feature (s) inoperable.
1 3.
With one or more channels inoperable for ADS:
A.
Within one hour from discovery of loss of ADS initiation capability in both trip systems, declare ADS inoperable, and 1
B.
Within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> from discovery of an inoperable channel concurrent with HPCI or RCIC inoperable, place channel in trip, and C.
Within 8 days, place channel in trip.
i D.
If required actions and associated completion times of actions A, B, or C are not met, immediately declare ADS inoperable.
Amendment No. O, 40,227,200,250 J
70
JAFNPP TABLE 3.2-2 CORE AND CONTAINMENT COOLING SYSTEM INITIATION AND CONTROL INSTRUMENTATION OPERABILITY REQUIREMENTS
,i 4.
With one or more channels inoperable for HPCI and/or RCIC:
4 A.
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, restore channel to operable status.
B.
If required action and associated completion time of action A is not met, immediately declare affected system inoperable.
S.
With one or more channels inoperable for containment spray:
A.
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, place channel in trip.
j B.
If required action and associated completion time of action A is not met, immediately declare associated supported feature (s) f inoperable.
e 6.
With one or more channels inoperable for injection permissive and/or recirculation discharge valve permissive:
A.
Within one hour from discovery of loss of initiation capability for feature (s) in both divisions, declare the supported features inoperable, and 1
1 I
B.
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, restore channel to operable status.
i C.
If required actions and associated completion times of actions A or B are not met, immediately declare associated supported feature (s) inoperable.
v i
I Amendment No. 40, 07, 100, 120, 100, 227, 250 71
. m wsw-
JAFNPP TABLE 3.2-2 CORE AND CONTAINMENT COOLING SYSTEM INITIATION AND CONTROL INSTRUMENTATION OPERABILITY REQUIREMENTS 7.
A.
With one start timer inoperable, restore the timer to an operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
B.
With two or more start timers inoperable, within one hour declare the associated ECCS subsystem (s) inoperable.
C.
If the required actions and associated completion times of A and B cannot be met declare the associated ECCS subsystem (s) inoperable.
8.
With one or more channels inoperable for ADS:
A.
Within one hour from discovery of loss of ADS initiation capability in both trip systems, declare ADS inoperable, and B.
Within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> from discovery of an inoperable channel concurrent with HPCI or RCIC inoperable, restore channel to operable status, and C.
Within 8 days, restore channel to operable status.
D.
If required actions and associated completion times of actions A, B, or C are not met, immediately declare ADS inoperable.
9.
With one or more channels inoperable for HPCI and/or RCIC:
A.
Within one hour from discovery of loss of system initiation capability while suction for the affected system is aligned to the CST, declare the affected system inoperable, and B.
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, place channelin trip or align suction for the affected system to the suppression pool.
C.
If required actions and associated completion times of actions A or B are not met, immediately declare the affected system inoperab!e.
Amendment No. N, 250 71a
i JAFNPP TABLE 3.2-2 I
t.
CORE AND CONTAINMENT COOLING SYSTEM INITIATION AND i
i CONTROL INSTRUMENTATION OPERABILITY REQUIREMENTS
- 10. With one or more channels inoperable for 4kV Emergency Bus Undervoltage Trip Functions:
4 1
A.
Within one hour, place channel in trip.
B.
If required action and associated completion time of action A is not met, immediately declare the affected Emergency Diesel Generator System inoperable, j
i
- 11. When a channel is placed in an inoperable status solely for performance of required surveillances, entry into associated Limiting
[
Conditions For Operation and required actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Trip Function or the e
redundant Trip Function maintains ECCS initiation capability.
- 12. When a channel is placed in an inoperable status solely for performance of required surveillances, entry into associated Limiting Conditions For Operation and required actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- 13. The 4kV Emergency Bus Undervoltage Timers (degraded voltage LOCA, degraded voltage non-LOCA, and loss-of-voltage) initiate the following: starts the Emergency Diesel-Generators; trips the normal / reserve tie breakers and trips all 4kV motor breakers (in conjunction with 75 percent Emergency Diesel-Generator voltages); initiates ' diesel-generator breaker close permissive (in conjunction with 90 percent Emergency Diesel-Generator voltages) and; initiates sequential starting of vital loads in conjunction i
with low-low-low reactor water level or high drywell pressure.
- 14. A secondary voltage of 110.6 volts corresponds to approximately 93% of 4160 volts on the bus.
- 15. A secondary voltage of 85 volts corresponds to approximately 71.5% of 4160 volts on the bus.
- 16. Only one trip system.
i
~
' Amendment No. 250 71b
_ _ _ _ _ _ _ - -. _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - ____ _,, _ _ _ _ _ _ ___k i
j 1
JAFNPP i
TABLE 4.2-2 CORE AND CONTAINMENT COOLING SYSTEM INSTRUMENTATION TEST AND Call 8 RATION REQUIREMENTS Instrument Channel Instrument Functional Test Calibration Frequency Instrument Check (Note 4)
)
1)
Reactor Water Level O (Note 5)
SA / R (Note 15)
D 2:1 Drywell Pressure (non-ATTS)
Q Q
NA 2b)
Drywell Pressure (ATTS)
Q (Note 5)
SA / R (Note 15)
D 3)
Reactor Pressure (non-ATTS)
Q Q
NA 3b)
Reactor Pressure (ATTS)
Q (Note 5)
SA / R (Note 15)
D 4)
Auto Sequencing Timers NA 18M NA 5)
O O
NA 6)
HPCI & RCIC Suction Source Levels O
Q NA 7) 4kV Emergency Bus Under-Voltage R
R NA (Loss-of-Voltage, Gegraded Voltage LOCA and non-LOCA) Relays and Timers.
NOTE:
See notes following Table 4.2-5.
i Amendment No. O, 00,100,10;,201,217,227,200, 250 80
.