MONTHYEARML20138K1271997-02-12012 February 1997 Requests Addl Info for Review of 950509 Application for Approval of site-specific License for ISFSI at North Anna Nuclear Power Station Site.Response Requested within 60 Days from Date of Ltr Project stage: Approval ML20217H5721997-10-0909 October 1997 Forwards Info Which Supports Use of NUREG/CR-0098,dtd May 1978,as Part of ISFSI Liquefaction Analysis,In Response to NRC Question Raised at 970505 Meeting Project stage: Meeting ML20202B0011997-11-24024 November 1997 Forwards Response to NRC 971105 RAI Re Util 970509 Application for Review & Approval of site-specific License ISFSI at Plant.Response to Item 5 Will Be Forwarded to NRC in Separate Correspondence within 30 Days Project stage: Request ML20203A8411997-12-0404 December 1997 Forwards Draft Reformatted Proposed North Anna ISFSI TS, According to Improved Std TS Format,For Review.Comments & Addl Proposed Changes Requested by 980130 Project stage: Draft Other ML20203J9981997-12-16016 December 1997 Forwards Response to Item 5 to NRC RAI Dtd 971104,re North Anna ISFSI License Application Project stage: Other ML20198H7391997-12-29029 December 1997 Forwards RAI Re Application for North Anna ISFSI for Fuel Assemblies to Be Stored in Plant ISFSI Project stage: RAI ML20199A4921998-01-16016 January 1998 Forwards RAI Which Addresses Thermal Design Criteria of Fuel Assemblies to Be Stored in North Anna ISFSI & Concrete Pad Static Analysis Project stage: RAI ML20199D9331998-01-23023 January 1998 Forwards Rev 21 to North Anna Power Station Emergency Plan & Rev 6 to Corporate Emergency Response Plan. Revs Reflect Addition of Isfsi.Rev 30 to EPIP-1.01, Emergency Manager Controlling Procedure, Encl Project stage: Other ML20203H9691998-02-13013 February 1998 Forwards RAI Re 950509 Application for Review & Approval of site-specific License for Isfsi.Rai Addresses Concrete Pad Design,Transporter Design,Cask Loading Operations & Record Keeping Requirements Project stage: RAI ML20203B4071998-02-17017 February 1998 Forwards Response to 980116 RAI Re Application for Review & Approval of site-specific License for ISFSI Project stage: Request ML20216F7781998-04-13013 April 1998 Forwards Summary of Required Changes to Plant UFSAR Associated W/Isfsi Operation.Identified Changes Have Been Approved by Plant Nuclear Safety & Operating Committee & Do Not Constitute Unreviewed Safety Question Project stage: Other ML20217F0461998-04-23023 April 1998 Forwards Response to RAI Re North Anna ISFSI for Concrete Pad Design,Transporter Design,Cask Loading Operations & Record Keeping Requirements Project stage: Response to RAI ML20236H5081998-05-29029 May 1998 Responds to 980518 RAI Re Application for Review & Approval of site-specific License for ISFSI at Naps.Listed Commitments Made to Ltr Project stage: Request ML20248K9121998-06-0808 June 1998 Forwards Preliminary SER for North Anna Nuclear Power Station Isfsi,Per Util 950509 Submittal of Application for ISFSI Project stage: Other ML20236H4471998-06-30030 June 1998 Informs That Attachments to 980529 Response to NRC 980518 RAI Re Application for Review & Approval of site-specific License for ISFSI at NAPS May Be Placed in PDR Project stage: Request ML20236M6571998-07-0707 July 1998 Submits Preoperational Test Acceptance Criteria & Test Results for North Anna ISFSI Construction.Preoperational Test Results Acceptable Project stage: Other 1998-01-23
[Table View] |
Text
,.
Vinoisi A Ei.ecTRIC ANI) POWER CON 11%NY Ricissunsp, Vinois A 2326:
January 23, 1998 Mr. Carl J. Paperiello, Diractor Serial No.97-587 Office of Nuclear Material Safety and Safeguards NL&OS/MAE RO U. S. Nuclear Regulatory Commission Docket Nos.
72-16 Washington, D. C. 20555 Deai Sir:
VIRGINidLELECTRIC AND POWER COMPANY NORTH ANNA INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
REVISIOh5 TO STAILQ1LEMERGENCY PLAN (TAC NO. LR2113)
Virginia Electric and Power Company's April 14, 1997 letter (Serial No.97-103) committed in item 9-6 to provide the NRC a copy of the revised North Anna Emergency Plan (NAEP). Enclosed is Revision 21 of that plan. Table 4.1 and Appendix 10.11 have been revised to reflect the addition of the ISFSI.
These revisions to the NAEP do not implement actions which decrease the effectiveness of the plan. The NAEP continues to meet the standards of 10 CFR 50.47.
Also enclosed for your informatiori are the Corporate Emergency Response Plan and North Anna Emergency Plan implementing Procedure 1.01, Emergency Manager Controlling Procedure, Revision 30. Item 12 in Tab C of Attachment 1 of this procedure has been added to reflect the ISFSI.
If you have any questions, or require additionalinformation, please contact us.
Very truly yours, 1
M' a
. Kansler Vice esident-Nuclear Operations jvF 6 Enclosures Commitments made in this letter:
- 1. None.
9802020056 900123 PDR ADOCK 05000338 F
pop h
)
}-
- g cc:
US Nuclear Regulatory Commission Region 11 Atlanta Federal Center
. 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303 U. S. Nuclear Regulatory Commission Attention:" Document Control Desk Weahington, D. C. 20555 Mr. M. J. Morgan (Without Enclosure)
NRC Senior Resident inspector North Anna Power Station Mr. J. W Shea Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission, Mail Stop 0-6-G-22 Washington, D. C. 20555 9
- - - _ _ _ _ - _ _ _ _ _ _ _