Requests Description & Plans for Implementation of Operator Requalification Program,Per AEC 730817 Amends to 10CFR50 & 55,within 3 Months of 730917 Effective Date
ML20198R064
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 08/23/1973
From: Skovholt D
US ATOMIC ENERGY COMMISSION (AEC)
To: Searls F
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML17342B389 List:
References
FOIA-85-665 NUDOCS 8602130330
Download: ML20198R064 (2)


Text

._

i

)

)

I

  • '.t,,

[

UNITED STATES Ci

'~

ATOMIC ENERGY COMMISSION

(

' 'l d%) %

i WASHWGTON. D.C. 20545

\\&35 August 23, 1973 Docket No. 50-275 and 50-323 Pacific Gas and Electric Company ATTN: Mr. Frederick T. Searls, P

Vice President and General Counsel i

77 Beale Street L

i San Francisco, California 94106 VAl Y."j

{

Gentlemen:

The Atomic Energy Commission has amended'its regulations to require

".J operators who manipulate the controls of nuclear power reactors and Pi other licensed production and utilization facilities to complete a L ~i requalification program or be administered a reexamination before

'~j.

each license renewal and to require facility licensees to carry out

[ ;,t adequate operator requalification programs.

An amendment to Part 55 of the AEC's regulations, which was published in the Federal Register on August 17, 1973 establishes minimum re-til quirements for requalification programs including on-the-job training t

and lectures 'on basic theories and safety systems of the specific

[

plant.

It applies to both operators and senior operators.

cr, Er An amendment to Part 50 published in the Federal Register on the same date' requires that an application for a license to operate a facility e[

must include a descriptio.n and plans for implementation of an operator Also, each facility licensee must have such c-requalification program.

a program in operation within three months after issuance of an f

l operating license. Holders of operating licenses in effect on the r

effective date of these amendments, September 17, 1973, must submit l

an operator requalification program for Commission approval and con-currently implement that program within three months after the

_a effective date of the amendments.

e 0602130330 85121?'

PDR FOIA FIRESTOa5-665 PDH

t
.,.) '

)

+

Pacific Gas and Electric Co.

All power, test and reprocessing facility licensees are requested to submit the required infonnation with one signed original and thirty-If a single submittal covers more than one nine additional copies.

unit at.a station, one signed original and fifty-nine additional copies All other facility licensees are requested to sub-C should be provided.

mit one signed original and twenty-one a_dditional copies.

{'g x

V Sincerely, E

bl jrh D

J. Skoyholt, Assistant Director G

for Operating Reactors EL L Directorate of Licensing 3

bu F.~

Enclosure:

[]

1. Amendmeist to 10 CrR Part 50 and Part 55

,p

, ?!

cc: Mr. Philip A. Crane, Jr.

Pacific Gas and Electric Company 245 Market Street rc E'

San Francisco, California 94106 b=

E DISTRIBUTION:

E PDR 2~

Local PDR E

DocketRoom(2)

Facility File D.J. Skovholt l-R.G. DeYoung K.R. Goller

~