ML20198H585

From kanterella
Jump to navigation Jump to search
Comments on SECY-85-283, Final Amends to 10CFR50,App E; Consideration of Earthquakes in Emergency Planning. Original Proposed Rule Should Be Retained
ML20198H585
Person / Time
Issue date: 09/06/1985
From: Zerbe J
NRC OFFICE OF POLICY EVALUATIONS (OPE)
To: Asselstine, Palladino, Roberts
NRC COMMISSION (OCM)
Shared Package
ML20197J537 List:
References
FOIA-85-653 NUDOCS 8601310059
Download: ML20198H585 (6)


Text

. _ _ _ _ _ _ _ _ _ _

. - g 4

1.

g\\,a seg UNITED STATES g

NUCLEAR. REGULATORY COMMISSION

j September 6, 1985 I

MEMORANDUM FOR: Chairman Palladino-Comissioner Roberts Comissioner Asselstine Comissioner Bernthal

'C' ss Zech 3~

p __ -

FROM:

J nE be, Director ffice of Policy Evaluation f

SUBJECT:

OPE COMMENTS ON SECY-85-283 -- FINAL AMENDMENTS TO 10 CFR f

PART 50, APPENDIX E; CONSIDERATION OF EARTHQUAKES IN EMERGENCY PLANNING We have reviewed the staff's proposal and offer coments for your consideration. --

BACKGROUND s

Proposed (December 1984) Rule In December 1984 the Comission published for coment a proposed rule incorporating the Comission's interpretations in the San Onofre and r

(

Diablo Canyon rulings. 49 FR 49640. The proposed rule would exclude

" earthquakes which cause, or occur proximate in time with, an accidental f

release of radioactive material..." from explicit consideration in emergency planning for nuclear power plant sites.

CLI-81-33, 14 NRC 1091(1981); CLI-84-12, 20 NRC 249(1984). The rationale for the proposed rule was based on two considerations: (1) the very low probability of the proximate occurrence of an earthquake of substantial magnitude and an accidental radiological release from an NRC-licensed nuclear power plant and (2) the considerable flexibility of emergency plans that satisfy NRC regulations.

Staff's Proposed Final Rule i

Because a number of the public respondents on the proposed rule pointed out that there was only a limited record indicating that emergency plans had adequate flexibility, the staff proposes in the final rule that the licensee probe such flexibility by examination of the possible impainnent of cer.tain onsite capabilities. Licensees would be required to confirm that the emergency response plans are sufficiently flexible to assure the existence of certain transport and comunications capabilities.

Contacts:

Cookie Ong, OPE Jim Beckerley, OPE Al Kenneke, OPE X-43302 8601310059 851223 PDR FOIA A

BELL 85-653 PDR

{

l

I-Specifically,.the rule would require that, assuming the disruption of road networks and nomal comunications, the licensee could nevertheless augment onsite staff, assess plant damage, ' project offsite radiation hazards, and comunicate with offsite authorities. The supplementary infomation sup-porting the proposed final rule limits the extent of licensee considera-tion: evacuation time estimates are not required to take into account the effects'of severe low-frequency natural phenomena, reinforcement of offsite structures to withstand such phenomena is not required, and.no " detailed, extensive study" has to be made of "the complicating effects of earthquakes or other' natural phenomena.on offsite emergency response capabilities." The staff's proposed final rule would also require State and local governments to identify in their emergency plans alternate routes of travel and methods for determining whether to shelter or evacuate.

DISCUSSION Nothing in SECY-85-283 would lead us to change our view that the Comission's original position (no specific consideration of earthquake impacts on emergency planning) remains a viable approach and should be retained. However, the staff's paper does raise additional points that should be considered, points that may enhance the original proposed rule.

In particular, adoption of some of the staff's points would clarify the Commission's position by emphasizing that the emergency plans of nuclear power plants must be sufficiently flexible to aspre certain specific and essential response capabilities are maintained s

The staff's proposed final rule would emphasize that emergency plans must be sufficiently flexible to assure that, in the event of disruption of nomal comunications and road networks, certain basic licensee capabilities are maintained. As the Comission has stated, current regulations and practices assure such flexibility in the emergency response plans of each nuclear power plant licensee or operating license applicant.

-1/

We do agree with the staff's identification of comunications and road networks as the essential response capabilities which are to be considered. We also agree with the staff's identification of certain basic licensee capabilities which must be maintained, i.e. the ability to augment onsite operating staff, to assess damage to the plant, to project expected or actual offsite radiation hazards, and to comunicate with offsite authorities. As we understand it, present regulatory review does address these factors.

(See discussion of Issue 1 in Enclosure 1 of SECY-85-283.) The staff's proposed final rule would limit the assumptions of the disruption to that of road networks and normal comunications. Although other offsite emergency response facilities, such as fire, police, and hospital installations and vehicles, may be assumed to be impaired or destroyed or otherwise unavailable, we believe these are less significant considerations than roads and comunications.

The wording of the staff's proposed final rule seems to focus on the causes of disruption (" severe, low frequency natural phenomena characteristic of the site"), whereas the intent, as we see it, appears to be to emphasize the complicating effects of the disruptions. The basic approach here, as in all emergency response planning, should be to have reasonable assurance that the emergency plans are flexible enough to take into account a wide

. spectrum of. disruptive effects. Thus, it seems to-us that an examination of the cause of iny disruption of normal comunications and road networks, whether the cause. is a " severe low frequency natural ph.enomena character-istic of the site" or any other specific event, does not need to be speci-fied in the r.egulations in or. der ~to, achieve what we perceive ~ to be the-basic intent of present regulatio'ns. and regulatory practices, i.e.,- to assure adequate flexibility to respond to disruptions Thus, in o'r view, u

the focus of emergency plans should. remain on maintaining the capability to respond effectively to the real and unpredictable consequences of such events.

If the Comission chooses to incorporate some of the staff's proposal so as to enhance the originally proposed rule, the rule would have to be clari-fied to indicate that State and local governments would make the same assumptions as the licensee in assuring their emergency respense flexibil-ity. Moreover, as a wide range of occurrences, natural or otherwise, could result in offsite~ damage and as the precise location and extent of such damage cannot be predicted, it seems sensible that the emergency plans of State and local governments provide reasonable assurance of the capability to assess actual damage to offsite comunications and road networks so-that emergency response actions can be adjusted to reflect the real situation at the time.

CONCLUSION In summary, our preliminary view is that the Comission's original proposed rule should be retained. Nonetheless, we believe you should consider whether the original proposal could be enhanced by inclusion of elements of the staff's proposed final rule (pp.38,39 of Enclosure 1 to SECY-85-283).

If revised along the lines of the attached mark-up, the rule would assure that every emergency response plan would have the inherent flexibility to cope with disruptions of comunications and road networks, without the need to specifically consider severe, low-frequency natural phenomena, including earthquakes. The rationale supporting the final rule would then rely on the comonsense (or " prudent") need for emergency response plans to be sufficiently flexible to take into account the possible complicating effects of such disruptions on essential emergency response capabilities.

Attachment:

As stated cc w/ attachment:

H. Plaine 0GC S. Chilk, SECY W. Dircks, E00 R. Minogue, RES J. Taylor, IE H. Denton, NRR i

~

~

).

Attachment OPE Suggested Revision of Proposed Final Rule 1

COMPARATIVE TEXT Neither emergency response plans noa evacuation time analyses need specifically consider the impact of severe, low frequency natural phenomera which cause, or occur proximate in time with, an accidental release of radioactive material from the facility.

To demonstrate flexiblity to accommodate disruptions of normal communications and road networks:

1A) The nuclear power reactor operating licensee and appifcant emergency response plans shall assure that the fellew4mg capabilities exist

~

relat4ve-te-the-eempl4 eating-4mpaets-ef-severe,-lew-frequency-natural phenomena-eharacter4stfe-ef-the-s44er--in-address 4ng-the-fellow 4mg eapab444 ties-the-14eensee-sha44-assume-that-the-severe-natural-phenemenen has-disrupted-nermal-eemmunication-and-read-networks.

1.

Ab414ty To transport necessary personnel to the plant after the-event in order to augment the original staff as necessary to cope with degraded modes of plant operation.

\\

2.

Ab414ty-by-the-14eensee To assess damage to the plant, and to translate-this-4nfermatien-inte projections of-the-expeeted or aetual radiation hazard exposure offsite, and be-able to comunicate this information to offsite authorities, se-that-this 4nfermatien-will-be-available-as-a-facter-in-the-deefsfemmaking processi-4 neluding-reeemenda tiens-fer-preteet4ve-aetf e'ns-af ter severe,-kw-frequeneys-natural-phenemena.

(B) in-eensidering-the-eemplicating-4mpaets-ef-severey-lew-frequeney, natural-phenemena, State and local governments shevid-4dentifys-4n-their emergency plans, should provide reasonable assurance of the capability to assess location and exter.t cf offsite damage to nonnal ccmunications and road networks, identify alternate routes of travel and metheds-fer determining determine whether to shelter or evacuate.

FINAL FORM Neither emergency response plans nor evacuation time analyses need specifically consider the impact of severe, low-frequency natural phenomena which cause, or occur proximate in time with, an accidental release of radioactive material from the facility.

To demonstrate flexibility to accomodate disruptions of nonnal consnunications and road networks:

.- i J-

~

(A) The nuclear power reactor operating licensee and applicant emergency response plans shall assure the capabilities exist 1.

To transport necessary personnel to the plant in order to augment the original staff as necessary to cope with degraded modes of plant operation.

2.

To assess damage to the plant, to project radiation exposure offsi.te, and to com,nunicate this information to offsite authorities.

(B) State and local governments emergency plans should provide reasonable assurance of the capability to: assess location and extent of offsite damage to normal communications and road networks, ide,ntify alternate routes of travel, and determine whether to shelter or evacuate.

e 1

..r-m-n

-,n.,

- - - - - - - - - - - - -. -. - -, -.. - - - -.