j GPU Nuclear, Inc.
(-
U.S. Route #9 South NUCLEAR Post Office Box 388 Forked River, NJ 08731-0388 Tel 609-971-4000 December 22, 1998 1940-98-20549 U. S. Nudear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen:
Subject:
Oyster Creek Nuclear Generating Station (OCNGS)
Operating License No. DPR-16 Docket No. 50 - 219
)
Response to Requests For Additional Information (RAI) On The Resolution of Unresolved Safety Issue A-46 at Oyster Creek Nuclear Gererating Station i
By letter dated March 29,1996, GPU Nuclear submitted a plant specific summary report documenting the results of the seismic walk-down evaluation performed at Oyster Creek Nuclear Generating Station. The summary report addressed Generic Letter 87-02,
" Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operatmg Reactors, Unresolved Safety Issue (USI) A-46" Following their review of the summary report, the NRC stafTissued requests for additional information on September 9,1997 and March 2,1998 in order to complete their assessment.
j Enclosed are cur responses to the requests for additional information (Enclosures I & II).
If you have any questions concerning the information provided in our response, please contact Yosh Nagai, Corporate Licensing, at (973) 316-7974.
Sincerely, h
Michael B. Roche 9812290317 981222 "
Vice President & Director PDR ADOCK 05000219 P
PDR..
Oyster Creek cc:
Administrator, Region 1
/
Oyster Creek NRC Project Manager h
Oyster Creek NRC Sr. Resident Inspector p0 DRAWINGS LOCATEDIN THENRCFiLE CENTER c