Forwards RAI Re Licensee 970529 Submittal of ISI Program for Plant,Units 1 & 2 Second 10-yr Interval
ML20198F073
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/08/1997
From: Larry Wheeler
NRC (Affiliation Not Assigned)
To: Mccoy C
SOUTHERN NUCLEAR OPERATING CO.
References
TAC-M98977, TAC-M98978, NUDOCS 9708110175
Download: ML20198F073 (5)


Text

.

o August 8.-1997 Mr. C. K. McCoy Distribution Vice President tombsWlue. HBerkow Southern Nuclear Operating PUBLIC LBerry Company, Inc. PDil 2 Reading TMcLellan Post Offico Box 1295 BBoger JJohnson, Rll B!rmingham, Alabama 352011295 OGC 015 B18 PSkinner,Ril ACRS, T 2, E261

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING THE SECOND 10 YEAR INTERVAL INSERVICE INSPECTION PROGRAM - VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 (TAC NOS, M98977 AND M98978)

Dear Mr. McCoy:

By letter dated May 29,1997, Southern Nuclear Operating Company (SNC), the licensee, submitted the inservice inspection (ISI) program for the Vogtle Electric Generata,g Plant (Vogtle), Units 1 and 2 second 10 year interval. SNC also requested expeditious evaluation of four relief requests included in the May 29,1997, submittal (RR 17, RR 22, RR 25, and RR 26).

Enclosed is a description of additionalInformation required by the staff in order to complete its review of these four relief requests, Please provide the requested information as soon as practical. In addition, to expedite the staff's review, please send a copy of your reply directly to Mr. Michael T. Anderson, INEEL Research Center,2151 North Boulevard, P.O. Box 1625, Idaho Falls, Idaho 83415 2209.

If there are any questions regarding this request, please have your representative contact me at (301)415 1444.

Sincerely.

ORIGINAL SIGNED BY:

Louis L. Wheeler, Senior Project Manager Project Directorate 112 Division of Reactor Projects -l/II Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425

}

Enclosure:

Request for Additional Information cc w/ encl: Sen next page DOCUMENT NAME: VOG98977.RAI ,

OFFICE PD h Mu PDil-2/LA fx k PDil 2/D rv NAME L WHEitIR L. BERRY H BERKOW DATE hf/97 / 19 7 $ 19 /97 COPY !YEhNO hES)NO E) NO 9700110175 970008 PDR ADOCK 05000424 G PDR v .e I!EIIUI.siglilill NRC RLE CENTS COPY

pmneog y k UNITED STATES

  • }2 NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30MH001 k.....,/ August 8, 1997 Mr. C. K. McCoy Vice President Southern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 352011295

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING THE SECOND 10 YEAR INTERVAL INSERVICE INSPECTION PROGRAM VOG ri.E ELECTRIC GENERATING PLANT, UNITS 1 AND 2 (TAC NOS. M98977 AND M98978)

Dear Mr. McCoy:

By letter dated May 29,1997, Southern Nuclear Operating Company, Inc. (SNC), the licensee, submitted the inservice inspection (ISI) program for the Vogtle Elect-ic Generating Plant (Vogtle), Units 1 and 2 second 10 year interval. SNC also requested expeditious evaluation of four relief requests included in the May 29,1997, submittal (RR 17, RR 22, RR 25, and RR 26).

Enclosed is a description of additionalinformation required by the staff in order to complete its review of these four relief requests.

Please provide the requested information as soon as practical. In addition, to expedite the staff's review, please send a copy of your reply directly to Mr. Michael T. Anderson, INEEL Research Center,2151 North Boulevard, P.O. Box 1625, Idaho Falls, Idaho 83415 2209.

If there are any questions regarding this request, please havo your representativo contact me at

-(301)415 1444.

Sincerely, c2aufK Louis L. Wheeler, Senior Project Manager Project Directorate ll 2 Division of Reactor Projects 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425

Enclosure:

Request for Additionallnformation cc w/ encl: See next page

Vogtle Electric Generating Plant ,

Units 1 and 2 cc:

Mr. J. A. Bailey Harold Rebels, Director Manager, Licensing Department of Natural Resources '

Southern Nuclear Operating 205 Butler Street, SE. Suite 1252 Company, Inc. Atlanta, Georgia 30334 P. O. Evx 1295 Birmingham, Alabama 35201-1295 Attomey General Law Department Mr. J. B. Beasley 132 Judicial Building General Manager, Vogtle Electric Atlanta, Georgia 30334 Generating Plant Southem Nuclear Operating Mr. J. D. Sharpe Company, Inc. Program Manager P. O. Box 1600 Nu: lear Operations Waynesboro, Georgia 30830 Oglethorps Power Corporation Plant Vogtle Regional Administrator, Region 11 P. O. Box 1600 U. S. Nuclear Regulatory Commission Waynesboro, Georgia 30830 Atlanta Federal Center 61 Forsyth Street, SW., Suite 23T85 Charles A. Patrizia, Esquire Atlanta, Georgia 30303 Paul, Hastings, Janofsky & Walker 10th Floor Office of Planning and Budget 1299 Pennsylvania Avenue Room 615B Washington, DC 20004-9500 270 Washington Street, SW.

Atlanta, Georgia 30334 Arthur H. Domby, Esquire Troutman Sanders Mr. J. D. Woodard NationsBank Plaza Executive Vice President 600 Peachtree Street, NE.

Southem Nuclear Operating Suite 5200 Company, Inc. Atlanta, Georgia 30308-2216 P. O. Box 1295 Birmingham, Alabama 35201-1295 Resident inspector U.S. Nuclear Regulatory Commission Steven M. Jackson 8805 River Road )

Senior Engineer- Power Surply Waynesboro, Georgia 30830 Municipal Electric Authority ,

of Georgia Office of the County Commissioner 1470 Riveredge Parkway, NW'. Burke County Commission Atlanta, Georgia 30328-4684 Waynesboro, Georgia 30830 J

VOGTLE ELECTRIC GENERATING PLANT. UNITS 1 AND 2 DOCKET NOS. 50 424 AND 50 425 Raouest for Additional Information - Second 10-Year Interval inservice Insoection Raouests for 8 thai

1. Scope / Status of Rapview In accordance with Title 10 of the Code of Federal Raoulations (10 CFR) Sections 50.55a(c)(3),

50.55a(d)(2), and 50.55a(e)(2), the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (ASME Code) cases may be used as altomatives to Code requirements.

Code cases that the NRC has approved for use are listed in Regulatory Guide 1.147, inservice inspection Code Case Acceptability, with any additional conditions deemed necessary by the NRC.

Code cases Det referenced in Regulatory Guide 1.147 may be adopted only if authorized by the NRC on a case-by case basis. In some cases, unapproved Code cases may be acceptable for use when certain conditions are included. To ensure consistent implementation, licensees proposing  !

- the use of currently unapproved Code case (s), must commit to such conditions, if applicable.

By letter dated May 29,1997, the Southern Nuclear Operating Company, Inc. (the licensee) submitted the inservice inspection (ISI) program for the Vogtle Electric Generating Plant's second 10-year interval. The licensee also requested the expedited evaluation of four requests for relief contained in that submittal (Request for Reliefs RR-17. RR 22, RR-25, and RR 26). The information provided by the licensee regarding these requests has been reviewed by the NRC staff.

2. AdditionalInformation Raouired Based on the above review, the staff has concluded that the following information is required to complete its review of the licensee's submittals.

A. Pursuant to 10 CFR 50.55a(a)(3)(i), the licensee proposed to use the provisions of Code Case N-533, Altemative Requirements for VT-2 VisualExamination of Class 1 Insulated Pressure-Retaining Bolted Connections,Section XI, Division 1. In addition, the licensee proposed to extend the use of this Code Case to Class 2 and 3 components. Since this Code Case is applicable to Class 1 systems only, the NRC staff has determined that when '

extending Code Case N 533 to Class 2 and 3 systems, the insulation must be removed once o

each refueling outage to examine connections for evidence of leakage. The staff requires confirmation that this provision will be met. In addition, confirm that all other provisions of the Code Case, and related requirements of the Code (i.e., evaluation in accordance with IWA-5250), will be met.

B. Pursuant to 10 CFR 50.55a(a)(3)(i), the licensee proposed the use of Code Case N-544,

. Repair and Replacement of Smallitems,Section XI, Division 1, in lieu of the repair and replacement requirements of the Code. Under subsection -2400, the Code Case states:

A repair / replacement plan, pressure testing, services of an Authorized Inspection Agency, and completion of NIS-2 forms are not required.

Enclosure

, . . - f j l- This statement eliminates the only form of inspection that is performed on piping 1-inch and

!. smaller, in addition, this Code Case appears to circumvent other Code requirements (i.e.,

l- the oversight of an Authorized Nuclear inspector). Considering that this Code Case applies

. to all safety class systems, including Class 1 systems, describe how an acceptable level of quality and safety will be provided without the performance of pressure testing following a repair.

C, Pursuant to 10 CFR 50.55a(s)(3)(l), the licensee proposed to Use Code Case N 566, Corrective Action for Leakage at Bolted Connections,Section XI, DMslon 1, in lieu of the corrective measures specified by the Code for leakage at bolted connections, This Code Case is currently being reviewed by the NRC staff and, as of yet, has not been found acceptable Other licensees have proposed acceptable altematives to the requirements of IWA-5250(a)(2) that have included a detailed and well defirad evaluation of the bolting and the bolted connection. Considering that Code Case N 566. as currently written, will probably:

not be authorized in the near future, discuss the intended action regarding this Code Case,