Letter Sequence RAI |
---|
|
|
MONTHYEARML20198F0731997-08-0808 August 1997 Forwards RAI Re Licensee 970529 Submittal of ISI Program for Plant,Units 1 & 2 Second 10-yr Interval Project stage: RAI ML20211A4201997-09-17017 September 1997 Submits Modified Request for Relief RR-25 for Second 10-Yr ISI Program Project stage: Request ML20198T3281997-10-24024 October 1997 Discusses Second 10-year ISI Program W/Associated Requests for Relief from ASME Code as Submitted by Southern Nuclear Operating Co on 970529 for Vogtle.Forwards SE Authorizing Relief for Requests RR-17 & RR-25 Project stage: Approval ML20203C1971997-12-0909 December 1997 Forwards SE Re Relief Requests Associated W/Second 10 Yr Interval Insp Program.Proposed Alternative in RR-28 Provides Acceptable Level of Quality & Safety Project stage: Approval ML20198H3951998-01-0505 January 1998 Informs That Util Will Include 4-hour Hold Time at Nominal Operating Pressure in Future as Addition to Alternative Exam for Class I Pressure Testing Shown in Revised Request for Relief RR-26 Project stage: Request ML20217B8771998-03-24024 March 1998 Forwards SE Accepting Relief Requests RR-5,RR-19,RR-20, RR-21,RR-22,RR-23 & RR-24 for Second 10-yr Interval ISI Program Project stage: Approval ML20217H6771998-04-0101 April 1998 Forwards Corrected Page 5 for Safety Evaluation & Corrected Page for Associated Technical Ltr Rept Re Relief Requests Associated W/Second 10-yr Interval Insp Program, Relief Requests RR-5,RR-19,RR-20,RR-21,RR-22,RR-23 & RR-24 Project stage: Approval ML20236H5241998-06-26026 June 1998 Forwards Response to Request for Addl Info Re Second 10-yr ISI Program.Requested Plans & Drawings Are Being Provided for VEGP-1 Only Because Two VEGP Units Are Virtually Identical.W/Books 1-5 Project stage: Request ML20198S1601998-12-31031 December 1998 Forwards SER of Licensee Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Vogtle Electric Generating Plant Submitted on 970529. INEEL/EXT-98-01007 Rept Also Encl Project stage: Approval 1998-01-05
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P3791999-10-21021 October 1999 Forwards NRC Form 396 & NRC Form 398 for Renewal of Licenses SOP-20607-1 & SOP-20610-1.Without Encls ML20217N2521999-10-20020 October 1999 Provides Supplemental Info Re 990405 Containment Insp Program Requests for Relief RR-L-1 & RR-L-2,in Response to 991013 Telcon with NRC ML20217K7541999-10-15015 October 1999 Forwards Rev 1 to Unit 1,Cycle 9 & Unit 2 Cycle 7 Colrs,Iaw Requirements of TS 5.6.5.Figure 5, Axial Flux Difference Limits as Function of Percent of Rated Thermal Power for RAOC, Was Revised for Both Units ML20217G6751999-10-13013 October 1999 Requests Withholding of Proprietary Info Contained in Application for Amend to OLs to Implement Relaxations Allowed by WCAP-14333-P-A,rev 1 ML20217G1071999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Vogtle & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insps at Facility Over Next Six Months ML20216J9041999-10-0101 October 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20216J9161999-10-0101 October 1999 Forwards Response to NRC 990723 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20217B0141999-10-0101 October 1999 Forwards Insp Repts 50-424/99-06 & 50-425/99-06 on 990725- 0904 at Vogtle Units 1 & 2 Reactor Facilities.Determined That One Violation Occurred & Being Treated as non-cited Violation ML20212E8751999-09-20020 September 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear Grade Activated Charcoal. Description of Methods Used to Comply with Std Along with Most Recent Test Results Encl ML20212E7481999-09-20020 September 1999 Requests Approval Per 10CFR50.55a to Use Alternative Method for Determining Qualified Life of Certain BOP Diaphragm Valves than That Specified in Code Case N-31.Proposed Alternative,Encl ML20212C2191999-09-16016 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, Which Is Current Need for NRC Operator Licensing Exams for Years 2000 Through 2003 of Plant Vogtle,Per Administrative Ltr 99-03 ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211J5291999-08-30030 August 1999 Forwards Snoc Copyright Notice Dtd 990825,re Production of Engineering Drawings Ref in VEGP UFSAR ML20211J5251999-08-30030 August 1999 Forwards Response to NRC 990727 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20211J7381999-08-27027 August 1999 Informs That Licensee Vessel Data Is Different than NRC Database Based on Listed Info,Per 990722 Request to Review Rvid ML20211E9251999-08-23023 August 1999 Forwards fitness-for-duty Performance Data for Jan-June 1999,as Required by 10CFR26.71(d).Data Reflected in Rept Covers Employees at Vogtle Electric Generating Plant ML20210V0881999-08-16016 August 1999 Forwards Insp Repts 50-424/99-05 & 50-425/99-05 on 990620- 0724.No Violations Noted.Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20210Q4611999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 for Vogtle.Requests Info Re Individuals Who Will Take Exam. Sample Registration Ltr Encl ML20210L2181999-08-0202 August 1999 Forwards NRC Form 396 & Form 398 for Renewal of Listed Licenses,Iaw 10CFR55.57.Without Encl ML20210N1191999-08-0202 August 1999 Discusses 990727 Telcon Between Rs Baldwin & R Brown Re Administration of Licensing Exam at Facility During Wk of 991213 ML20210G3351999-07-27027 July 1999 Forwards Second Request for Addl Info Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20210E0121999-07-23023 July 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20210D9341999-07-22022 July 1999 Discusses Closure of TACs MA0581 & MA0582,response to Requests for Info in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20210C8011999-07-21021 July 1999 Provides Response to NRC AL 99-02,which Requests That Addressees Submit Info Pertaining to Estimates of Number of Licensing Actions That Will Be Submitted for NRC Review for Upcoming Fy 2000 & 2001 ML20210E0431999-07-15015 July 1999 Forwards Insp Repts 50-424/99-04 & 50-425/99-04 on 990502- 0619.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209H3881999-07-14014 July 1999 Forwards Revs 1 & 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Unit 1 & 2 ML20209C4041999-07-0101 July 1999 Forwards Rev 29 to VEGP Units 1 & 2 Emergency Plan.Rev 29 Incorporates Design Change Associated with Consolidation of Er Facilities Computer & Protues Computer.Justifications for Changes & Insertion Instructions Are Encl ML20196H8081999-06-28028 June 1999 Discusses 990528 Meeting Re Results of Periodic PPR for Period of Feb 1997 to Jan 1999.List of Attendees Encl ML20212J2521999-06-21021 June 1999 Responds to NRC RAI Re Yr 2000 Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701 ML20196F9171999-06-21021 June 1999 Forwards Owner Rept for ISI for Vogtle Electric Generating Plant,Unit 1 Eighth Maint/Refueling Outage. Separate Submittal Will Not Be Made to NRC on SG Tubes Inspected During Subj Outage ML20195F8031999-06-11011 June 1999 Forwards Changes to VEGP Unit 1 Emergency Response Data Sys (ERDS) Data Point Library.Changes Were Completed on 990308 While Unit 1 Was SD for Refueling Outage ML20207E7421999-06-0303 June 1999 Refers to from NRC Which Issued Personnel Assignment Ltr to Inform of Lm Padovan Assignment as Project Manager for Farley Npp.Reissues Ltr with Effective Date Corrected to 990525 ML20207F6201999-06-0202 June 1999 Sixth Partial Response to FOIA Request for Documents.Records in App J Encl & Will Be Available in Pdr.App K Records Withheld in Part (Ref FOIA Exemptions 7) & App L Records Completely Withheld (Ref FOIA Exemption 7) ML20207D9861999-05-28028 May 1999 Informs That,Effective 990325,LM Padovan Was Assigned as Project Manager for Plant,Units 1 & 2 ML20207D2701999-05-19019 May 1999 Forwards Insp Repts 50-424/99-03 & 50-425/99-03 on 990321- 0501.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20206M5141999-05-11011 May 1999 Informs That NRC Ofc of Nuclear Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Rl Emch Section Chief for Vogtle. Reorganization Chart Encl ML20206U4061999-05-11011 May 1999 Confirms Telcon with J Bailey Re Mgt Meeting Scheduled for 990528 to Discuss Results of Periodic Plant Performance Review for Plan Nuclear Facility Fo Period of Feb 1997 - Jan 1999 05000424/LER-1998-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Exi1999-05-10010 May 1999 Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed ML20206D6411999-04-29029 April 1999 Forwards Vogtle Electric Generating Plant Radiological Environ Operating Rept for 1998 & Vogtle Electric Generating Plant Units 1 & 2 1998 Annual Rept Annual Radioactive Effluent Release Rept ML20206D5881999-04-29029 April 1999 Forwards Rept Which Summarizes Effects of Changes & Errors in ECCS Evaluation Models on PCT for 1998,per Requirements of 10CFR50.46(a)(3)(ii).Rept Results Will Be Incorporated Into Next FSAR Update ML20206D6951999-04-28028 April 1999 Provides Update of Plans for VEGP MOV Periodic Verification Program Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20206C2241999-04-21021 April 1999 Forwards Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2.Page E2-2 Was Iandvertently Omitted from Previously Submitted Rept on 990413 ML20206A6371999-04-21021 April 1999 Forwards SE Authorizing Licensee Re Rev 9 to First 10-yr ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML20205Q3351999-04-15015 April 1999 Forwards Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320.Three Violations Identified & Being Treated as Non-Cited Violations ML20205T2351999-04-0909 April 1999 Informs That on 990317,B Brown & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Scheduled for Wk of 991213 for Approx 10 Candidates ML20205K7501999-04-0505 April 1999 Informs That Effective 990329,NRC Project Mgt Responsibility for Plant Has Been Transferred from Dh Jaffe to R Assa ML20209A3741999-04-0505 April 1999 Submits Several Requests for Relief for Plant from Code Requirements Pursuant to 10CFR50.55a(a)(3) & (g)(5)(iii).NRC Is Respectfully Requested to Approve Requests Prior to Jan 1,2000 ML20205H3481999-03-31031 March 1999 Forwards Georgia Power Co,Oglethorpe Power Corp,Municipal Electric Authority of Ga & City of Dalton,Ga Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81 ML20205F9091999-03-29029 March 1999 Submits Rept of Number of SG Tubes Plugged During Plant Eighth Maintenance/Refueling Outage (1R8).Inservice Insps Were Completed on SGs 1 & 4 on 990315.No Tubes Were Plugged ML20205G0761999-03-26026 March 1999 Provides Results of Individual Monitoring for 1998.Encl Media Contains All Info Required by Form NRC 5.Without Encl 1999-09-20
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217G1071999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Vogtle & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insps at Facility Over Next Six Months ML20217B0141999-10-0101 October 1999 Forwards Insp Repts 50-424/99-06 & 50-425/99-06 on 990725- 0904 at Vogtle Units 1 & 2 Reactor Facilities.Determined That One Violation Occurred & Being Treated as non-cited Violation ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20210V0881999-08-16016 August 1999 Forwards Insp Repts 50-424/99-05 & 50-425/99-05 on 990620- 0724.No Violations Noted.Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20210Q4611999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 for Vogtle.Requests Info Re Individuals Who Will Take Exam. Sample Registration Ltr Encl ML20210N1191999-08-0202 August 1999 Discusses 990727 Telcon Between Rs Baldwin & R Brown Re Administration of Licensing Exam at Facility During Wk of 991213 ML20210G3351999-07-27027 July 1999 Forwards Second Request for Addl Info Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20210E0121999-07-23023 July 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20210D9341999-07-22022 July 1999 Discusses Closure of TACs MA0581 & MA0582,response to Requests for Info in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20210E0431999-07-15015 July 1999 Forwards Insp Repts 50-424/99-04 & 50-425/99-04 on 990502- 0619.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20196H8081999-06-28028 June 1999 Discusses 990528 Meeting Re Results of Periodic PPR for Period of Feb 1997 to Jan 1999.List of Attendees Encl ML20207E7421999-06-0303 June 1999 Refers to from NRC Which Issued Personnel Assignment Ltr to Inform of Lm Padovan Assignment as Project Manager for Farley Npp.Reissues Ltr with Effective Date Corrected to 990525 ML20207F6201999-06-0202 June 1999 Sixth Partial Response to FOIA Request for Documents.Records in App J Encl & Will Be Available in Pdr.App K Records Withheld in Part (Ref FOIA Exemptions 7) & App L Records Completely Withheld (Ref FOIA Exemption 7) ML20207D9861999-05-28028 May 1999 Informs That,Effective 990325,LM Padovan Was Assigned as Project Manager for Plant,Units 1 & 2 ML20207D2701999-05-19019 May 1999 Forwards Insp Repts 50-424/99-03 & 50-425/99-03 on 990321- 0501.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20206M5141999-05-11011 May 1999 Informs That NRC Ofc of Nuclear Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Rl Emch Section Chief for Vogtle. Reorganization Chart Encl ML20206U4061999-05-11011 May 1999 Confirms Telcon with J Bailey Re Mgt Meeting Scheduled for 990528 to Discuss Results of Periodic Plant Performance Review for Plan Nuclear Facility Fo Period of Feb 1997 - Jan 1999 ML20206A6371999-04-21021 April 1999 Forwards SE Authorizing Licensee Re Rev 9 to First 10-yr ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML20205Q3351999-04-15015 April 1999 Forwards Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320.Three Violations Identified & Being Treated as Non-Cited Violations ML20205T2351999-04-0909 April 1999 Informs That on 990317,B Brown & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Scheduled for Wk of 991213 for Approx 10 Candidates ML20205K7501999-04-0505 April 1999 Informs That Effective 990329,NRC Project Mgt Responsibility for Plant Has Been Transferred from Dh Jaffe to R Assa ML20205B9601999-03-24024 March 1999 Seventh Partial Response to FOIA Request for Documents. Records in App N Already Available in Pdr.App O Records Being Released in Entirety & App P Records Being Withheld in Part (Ref FOIA Exemptions 7C,2 & 5) ML20205A2771999-03-19019 March 1999 Advises of NRC Planned Insp Effort Resulting from Vogtle PPR on 990208.PPR for Plant Involved Participation of All Technical Divs in Evaluating Insp Results & Safety Performance Info for Period of Dec 1997 - Jan 1999 ML20207L8281999-03-0808 March 1999 Forwards Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 & Notice of Violation ML20207J0431999-03-0303 March 1999 Forwards Insp Repts 50-424/98-10 & 50-425/98-10 on 981227- 990213.No Violations Noted.Licensee Conduct of Activities at Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices ML20203G5691999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Ltr Indicating No Candidates or Ltr Listing Names of Candidates for Exam ML20202H9691999-01-29029 January 1999 Forwards Safety Evaluation Authorizing Rev 8 to First 10-year Interval Inservice Insp Program & Associated Requests for Relief for Vogtle Electric Generating Plant, Unit 1 ML20199J7931999-01-20020 January 1999 Forwards Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226 at Vogtle Units 1 & 2.No Violations Were Identified.Conduct of Activities at Vogtle Was Generally Characterized by safety-conscious Operations ML20199K1381999-01-12012 January 1999 Informs That on 990117,Region II Implemented Staff Reorganization as Part of agency-wide Streamlining Effort, Due to Staffing Reductions in FY99 Budget.Organization Charts Encl ML20198S1601998-12-31031 December 1998 Forwards SER of Licensee Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Vogtle Electric Generating Plant Submitted on 970529. INEEL/EXT-98-01007 Rept Also Encl ML20199E4741998-12-23023 December 1998 Provides Summary of 981105 Training Managers Conference Held in Atlanta,Georgia.Conference Agenda,List of Conference Attendees,Presentation Slides & Preliminary Schedule for FY99 & FY00 Encl ML20199J9781998-12-22022 December 1998 Responds to 981209 Meeting Re Installation of Seismic Clips on Cutler Hammer Electrical Circuit Breakers.Forwards List of Attendees & Handouts ML20198F6711998-12-11011 December 1998 Forwards Insp Repts 50-424/98-08 & 425/98-08 on 980927-1114. No Violations Identified ML20198N9431998-12-10010 December 1998 Ack Receipt of Response, to NOV Issued on 980112 Re Surveillance Testing of Reactor Trip Sys P-4 Interlock Feature at Licensee Facility.Nrc Agrees That Surveillance Testing Not Required ML20196J2181998-12-0101 December 1998 Advises of Planned Insp Effort Resulting from 981102 Insp Planning Meeting.Historical Listing of Plant Issues Called Plant Issues Matrix & Insp Plan,Including Specific Insps Such as in Security & Radiological Protection Areas Encl ML20196J2581998-12-0101 December 1998 Confirms Arrangements Made Between J Bailey & B Holbrook, Re Info Meeting Scheduled for 990210 to Discuss Licensee Performance,New Initiatives & Other Regulatory Issues Pertaining to Listed Facilities ML20196B1231998-11-23023 November 1998 Confirms Telephone Conversation Between J Bailey & P Skinner on 981120 Re Info Meeting Which Has Been Scheduled for 981209 in Atlanta,Ga,To Discuss Issues Re Seismic Retainer Clips ML20196D4981998-11-13013 November 1998 Informs That on 981007,NRC Administered Gfes of Written Operator Licensing Examination.Copy of Answer Key & Master Bw/Pwr GFE Encl,Even Though Facility Did Not Participate in Exam.Without Encl ML20195B3391998-11-0909 November 1998 Forwards Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21).No Violations Noted.Conduct of Activities Generally Characterized by safety-conscious Operations & Sound Engineering ML20155H2501998-10-21021 October 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-424/98-05 & 50-425/98-05 Issued on 980723.Concluded for Reasons Stated That Example 2 Violation Occurred as Stated in NOV ML20155A7491998-10-15015 October 1998 Forwards Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926 & Nov.Insp Generally Characterized by Safety Conscious Operations,Sound Engineering & Maint Practices & Appropriate Radiological Controls ML20155B7771998-10-0909 October 1998 Extends Invitation to Attend Training Manager Conference on 981105 in Atlanta,Georgia.Conference Designed to Inform Regional Training & Operations Mgt of Issues & Policies That Effect Licensing of Reactor Plant Operators ML20155B4621998-09-25025 September 1998 Discusses OI Investigation Which Completed on 980728. Investigation Reviewed Circumstances Surrounding Apparent Disabling of Fire Computer Trouble Alarm by Unit Shift Supervisor.Concludes Enforcement Discretion Warranted ML20153B0401998-09-17017 September 1998 Responds to 980904 e-mail Message Making Certain Observations Re Apparent Increase in Reactor Trips at Plant, Units 1 & 2.NRC Concluded That Licensee post-trip Reviews Adequately Conducted & That No Adverse Trends,Apparent ML20153B9311998-09-16016 September 1998 Forwards RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations, Responses for Plant,Units 1 & 2 ML20153F7081998-09-11011 September 1998 Provides Summary of 980909 Meeting Held to Discuss TS & Other Regulatory Issues Re Vogtle Electric Generating Plant. List of Meeting Attendees & Copy of Presentation Slides Encl ML20154C4871998-09-10010 September 1998 Forwards Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815 & Nov.One Violation Involved Failure to Implement Adequate C/As for Repeated Failures to Enter Applicable TS Limiting Conditions for Operation ML20151U7901998-09-0909 September 1998 Discusses 980615 Request for Exemption from Requirement of 10CFR73.55(e)(1) & (f)(1) to Provide Continuous Staffing of Plant CAS During Contingency Events.Request Denied ML20151S7291998-09-0202 September 1998 Discusses Evaluation of Util Response to GL 97-05 for Plant, Units 1 & 2.NRC Did Not Identify Any Concerns W/Sg Tube Insp Techniques Employed at Plant ML20239A4251998-08-27027 August 1998 Informs of Change Being Implemented by Region II Re Administrative Processing of Licensee Responses to Nov.Nov Responses Will Be Formally Ack as Part of Periodically Issued Integrated Insp Repts 1999-09-01
[Table view] |
Text
.
o August 8.-1997 Mr. C. K. McCoy Distribution Vice President tombsWlue. HBerkow Southern Nuclear Operating PUBLIC LBerry Company, Inc. PDil 2 Reading TMcLellan Post Offico Box 1295 BBoger JJohnson, Rll B!rmingham, Alabama 352011295 OGC 015 B18 PSkinner,Ril ACRS, T 2, E261
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING THE SECOND 10 YEAR INTERVAL INSERVICE INSPECTION PROGRAM - VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 (TAC NOS, M98977 AND M98978)
Dear Mr. McCoy:
By letter dated May 29,1997, Southern Nuclear Operating Company (SNC), the licensee, submitted the inservice inspection (ISI) program for the Vogtle Electric Generata,g Plant (Vogtle), Units 1 and 2 second 10 year interval. SNC also requested expeditious evaluation of four relief requests included in the May 29,1997, submittal (RR 17, RR 22, RR 25, and RR 26).
Enclosed is a description of additionalInformation required by the staff in order to complete its review of these four relief requests, Please provide the requested information as soon as practical. In addition, to expedite the staff's review, please send a copy of your reply directly to Mr. Michael T. Anderson, INEEL Research Center,2151 North Boulevard, P.O. Box 1625, Idaho Falls, Idaho 83415 2209.
If there are any questions regarding this request, please have your representative contact me at (301)415 1444.
Sincerely.
ORIGINAL SIGNED BY:
Louis L. Wheeler, Senior Project Manager Project Directorate 112 Division of Reactor Projects -l/II Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425
}
Enclosure:
Request for Additional Information cc w/ encl: Sen next page DOCUMENT NAME: VOG98977.RAI ,
OFFICE PD h Mu PDil-2/LA fx k PDil 2/D rv NAME L WHEitIR L. BERRY H BERKOW DATE hf/97 / 19 7 $ 19 /97 COPY !YEhNO hES)NO E) NO 9700110175 970008 PDR ADOCK 05000424 G PDR v .e I!EIIUI.siglilill NRC RLE CENTS COPY
pmneog y k UNITED STATES
- }2 NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30MH001 k.....,/ August 8, 1997 Mr. C. K. McCoy Vice President Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 352011295
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING THE SECOND 10 YEAR INTERVAL INSERVICE INSPECTION PROGRAM VOG ri.E ELECTRIC GENERATING PLANT, UNITS 1 AND 2 (TAC NOS. M98977 AND M98978)
Dear Mr. McCoy:
By letter dated May 29,1997, Southern Nuclear Operating Company, Inc. (SNC), the licensee, submitted the inservice inspection (ISI) program for the Vogtle Elect-ic Generating Plant (Vogtle), Units 1 and 2 second 10 year interval. SNC also requested expeditious evaluation of four relief requests included in the May 29,1997, submittal (RR 17, RR 22, RR 25, and RR 26).
Enclosed is a description of additionalinformation required by the staff in order to complete its review of these four relief requests.
Please provide the requested information as soon as practical. In addition, to expedite the staff's review, please send a copy of your reply directly to Mr. Michael T. Anderson, INEEL Research Center,2151 North Boulevard, P.O. Box 1625, Idaho Falls, Idaho 83415 2209.
If there are any questions regarding this request, please havo your representativo contact me at
-(301)415 1444.
Sincerely, c2aufK Louis L. Wheeler, Senior Project Manager Project Directorate ll 2 Division of Reactor Projects 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425
Enclosure:
Request for Additionallnformation cc w/ encl: See next page
Vogtle Electric Generating Plant ,
Units 1 and 2 cc:
Mr. J. A. Bailey Harold Rebels, Director Manager, Licensing Department of Natural Resources '
Southern Nuclear Operating 205 Butler Street, SE. Suite 1252 Company, Inc. Atlanta, Georgia 30334 P. O. Evx 1295 Birmingham, Alabama 35201-1295 Attomey General Law Department Mr. J. B. Beasley 132 Judicial Building General Manager, Vogtle Electric Atlanta, Georgia 30334 Generating Plant Southem Nuclear Operating Mr. J. D. Sharpe Company, Inc. Program Manager P. O. Box 1600 Nu: lear Operations Waynesboro, Georgia 30830 Oglethorps Power Corporation Plant Vogtle Regional Administrator, Region 11 P. O. Box 1600 U. S. Nuclear Regulatory Commission Waynesboro, Georgia 30830 Atlanta Federal Center 61 Forsyth Street, SW., Suite 23T85 Charles A. Patrizia, Esquire Atlanta, Georgia 30303 Paul, Hastings, Janofsky & Walker 10th Floor Office of Planning and Budget 1299 Pennsylvania Avenue Room 615B Washington, DC 20004-9500 270 Washington Street, SW.
Atlanta, Georgia 30334 Arthur H. Domby, Esquire Troutman Sanders Mr. J. D. Woodard NationsBank Plaza Executive Vice President 600 Peachtree Street, NE.
Southem Nuclear Operating Suite 5200 Company, Inc. Atlanta, Georgia 30308-2216 P. O. Box 1295 Birmingham, Alabama 35201-1295 Resident inspector U.S. Nuclear Regulatory Commission Steven M. Jackson 8805 River Road )
Senior Engineer- Power Surply Waynesboro, Georgia 30830 Municipal Electric Authority ,
of Georgia Office of the County Commissioner 1470 Riveredge Parkway, NW'. Burke County Commission Atlanta, Georgia 30328-4684 Waynesboro, Georgia 30830 J
VOGTLE ELECTRIC GENERATING PLANT. UNITS 1 AND 2 DOCKET NOS. 50 424 AND 50 425 Raouest for Additional Information - Second 10-Year Interval inservice Insoection Raouests for 8 thai
- 1. Scope / Status of Rapview In accordance with Title 10 of the Code of Federal Raoulations (10 CFR) Sections 50.55a(c)(3),
50.55a(d)(2), and 50.55a(e)(2), the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (ASME Code) cases may be used as altomatives to Code requirements.
Code cases that the NRC has approved for use are listed in Regulatory Guide 1.147, inservice inspection Code Case Acceptability, with any additional conditions deemed necessary by the NRC.
Code cases Det referenced in Regulatory Guide 1.147 may be adopted only if authorized by the NRC on a case-by case basis. In some cases, unapproved Code cases may be acceptable for use when certain conditions are included. To ensure consistent implementation, licensees proposing !
- the use of currently unapproved Code case (s), must commit to such conditions, if applicable.
By letter dated May 29,1997, the Southern Nuclear Operating Company, Inc. (the licensee) submitted the inservice inspection (ISI) program for the Vogtle Electric Generating Plant's second 10-year interval. The licensee also requested the expedited evaluation of four requests for relief contained in that submittal (Request for Reliefs RR-17. RR 22, RR-25, and RR 26). The information provided by the licensee regarding these requests has been reviewed by the NRC staff.
- 2. AdditionalInformation Raouired Based on the above review, the staff has concluded that the following information is required to complete its review of the licensee's submittals.
A. Pursuant to 10 CFR 50.55a(a)(3)(i), the licensee proposed to use the provisions of Code Case N-533, Altemative Requirements for VT-2 VisualExamination of Class 1 Insulated Pressure-Retaining Bolted Connections,Section XI, Division 1. In addition, the licensee proposed to extend the use of this Code Case to Class 2 and 3 components. Since this Code Case is applicable to Class 1 systems only, the NRC staff has determined that when '
extending Code Case N 533 to Class 2 and 3 systems, the insulation must be removed once o
each refueling outage to examine connections for evidence of leakage. The staff requires confirmation that this provision will be met. In addition, confirm that all other provisions of the Code Case, and related requirements of the Code (i.e., evaluation in accordance with IWA-5250), will be met.
B. Pursuant to 10 CFR 50.55a(a)(3)(i), the licensee proposed the use of Code Case N-544,
. Repair and Replacement of Smallitems,Section XI, Division 1, in lieu of the repair and replacement requirements of the Code. Under subsection -2400, the Code Case states:
A repair / replacement plan, pressure testing, services of an Authorized Inspection Agency, and completion of NIS-2 forms are not required.
Enclosure
, . . - f j l- This statement eliminates the only form of inspection that is performed on piping 1-inch and
!. smaller, in addition, this Code Case appears to circumvent other Code requirements (i.e.,
l- the oversight of an Authorized Nuclear inspector). Considering that this Code Case applies
. to all safety class systems, including Class 1 systems, describe how an acceptable level of quality and safety will be provided without the performance of pressure testing following a repair.
C, Pursuant to 10 CFR 50.55a(s)(3)(l), the licensee proposed to Use Code Case N 566, Corrective Action for Leakage at Bolted Connections,Section XI, DMslon 1, in lieu of the corrective measures specified by the Code for leakage at bolted connections, This Code Case is currently being reviewed by the NRC staff and, as of yet, has not been found acceptable Other licensees have proposed acceptable altematives to the requirements of IWA-5250(a)(2) that have included a detailed and well defirad evaluation of the bolting and the bolted connection. Considering that Code Case N 566. as currently written, will probably:
not be authorized in the near future, discuss the intended action regarding this Code Case,