ML20198H395

From kanterella
Jump to navigation Jump to search

Informs That Util Will Include 4-hour Hold Time at Nominal Operating Pressure in Future as Addition to Alternative Exam for Class I Pressure Testing Shown in Revised Request for Relief RR-26
ML20198H395
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/05/1998
From: Mccoy C
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-1016-E, TAC-M98977, TAC-M98978, NUDOCS 9801130276
Download: ML20198H395 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _

, . * - * - C. K. McCoy Scuthern Nsclear v Vre President Operating Company,t .

Vogtle Piojor;t 40 inverness Center Paris, PO. Box 1295 Birmjngham. Alatama 35201 Tel 205Y327122 fax 2059920403 SOUTHERN h COMPANY Energy to Smie YourWorld'*

January 5, 1998 LCV-1016-E TAC Nos. ' M98977 M98978 Docket Nos.: 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Ladies and Gent *,xien:

.q VOGTLE ELECTRIC GENERATING PLANT INSERVICE INSPECTION PROGRAM REOUEST FOR RFLIEF RR-26 By letter LCV-1016-A dated September 10,1997, information was provided in response to the NRC letter dated August 8,1997, which requested additionalinformation

'D _ concerning the Vogtle Electric Generating Plant (VEGP), Units 1 and 2, Second Ten-Year Inservice Inspection Program. Specifically, information was provided in response to the NRC questions concerning our requested use of AShE Section XI Code Cases N-533, N-544, and N 566, as discussed in Requests for Relief RR-26, RR-22, and RR-25, respectively. Included in our September 10,1997, letter were revisions to Request for Relief RR-25 and RR-26.

In the revised Request for Relief RR 26, the alternative examination did not include a requirement for a 4-hour hold time at nominal operating pressure during the pressure test to allow for any leakage to penetrate the insulation. However, during the IR7 maimenance/ reft,: ling outage Class I leakage test the system had been pressurized at nominal operating pressure for a, proximately 3 1/2 hours prior to the start of the inspection walkdowns. In the future we will include a 4-hour hold time at nominal operating pressure as an addition to our alternative examination for Class 1 pressure @i g

testing shown in the revised Request for Relief RR-26.

~

9801130276 980105 PDR ADOCK 05000424 G PDR I0 ,

y uG4 ll!!!Ilsjlll, .l,Ill ll .

j- g a

?

U. S. Nuclear Regulatory Commission Page 2 of 2 LCV-1016-E Should there be any questions in this regard, please contact this office at your earliest convenience.

Sincerely, C. K. McCo CKM/ JAB xc: Southern Nuclear Operating Company Mr. J. B. Beasley, Jr.