Text
'
0FERAll H DATA REPCAT EDCrET ND 50+3i-DATE Mn 15. IM2 OPERATINGSTATU1 CCMPLETED BY R.A. Williaes TELEPHONE 7 % -373 5987
- 1. Onit Naset McGuire l'
- 2. Reporting Ferled: April 1, 1992-Apr11 30, 1992
- 3. Licensed Thermal Power (MWt):
3411
- 4. Naseplate Rating (6ross MWe):
1305*
Wotes 8Namepiate Ratirg
- 5. Design Electrical Rating (Net MWeb 1190 (Bross MWe) calculated as
- 6. Garisue Dependable Capacity (Gross MWeh 1171 1450.000 MVA x.90 peser
- 7. Maxisue Dependable Capacity (Net MWe):
1129 fatter per Fage lii,
'9. If Changes Occur in Capacity Ratings (Itess Number 3 Through 7) Since Last N!mEE-0020.
Report. Sive Reascnu
- 9. Power level To Which Restricted, !f Any (Net RWe):
- 10. Reason for Restrictions, if any:
This Month Yr.-to-Date Cuntative
- 11. Hour $ In Reporting Period 719.0 2903.0 91295.0
- 12. Nuater of Hoars Weactor Wu Critical 719.0 2095.5 64089.0
- 13. Reacter Reserve Shutdown Hours
--0--
--0--
--0--
- 14. Hours eenerator 'On-Line 719.0 2091.3 63372.2
- 15. Unit Reserve Shutdown Hours -
- - - 16. Gross Thersal Energy Generrated (MWh) 2390345 6355601 193844262
- 17. G*ess Electrical Enargy Generated (MWH) 834984 2393914 66755739
'18. liet Electrical Energy Generated (MWH)-
803780 2295111 63726164
-19. Unit Service factci 100.0 72.0 49.4 e0. Unit Availability Fattor 100.0 72.0 69.4
-21. Unit Capacity Factor (Using MDC Net) 99.0 70.0 60.5
- 22. Unit Capacity factor (Using DER Net) 94.7 67.0 59.2
- 23. Unit Forced Dutage Rate.
0.0 29.0 13.1
- 26. Shutdone Scheduled Over Next 6 Months (Type, Date, and Duration of Eachh
~None
- 25. If Shot Down At End Of Report Period. Estisated Date of startup:
- 26. Units In Test Status (Prior to Cesaercial Operationh Forenst Achieved INITIAL CR!TICALITY INITIAL ELE','TRICITY COMERCIAL OPERATION l
1 9205190110 920513 PDR ADOCK 05000369
.R PDR g
g 1.
r u-
- 's t
- OPERATINS DATA REPORT DOCKET NO 369-L'N!i McGuire 1 GME May 15. 1992 CMPLETED H_LA.. yilllm TELEPHONE 704-373-5907___
- NONTH Apfil.1992_
LA1 AVERABE DAILY POWER LEVEL M1 AVEEASE DAILY POWER LEVEL tMWe-Net)'
(MWe-Net) 1,
!!24
.17 Ilt?
-2:
11Pi_
18.
1123 3-1126-19 1122
'4
!!25' 20 t122
- 1126
- 21 102L' 6
1123' 22 1123 l -l 7-1122
~3 1120-P -1123-24 1121-9-
1122 25-1118
- 10
_1121 26 1114 11~
1121 27-1116
.12f
!!23
- EB 1115
!13;-
ller 29 1113
'14 -~
1120 30 1120
- l5 <
1122
.16 '-
'l12" I.
t s
+
w
+
- :---~
)
l DOCKET NO.
50-369 I
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME MCbulut 1 i
DATE Ud/13/ 92 I
COMPLETED BY N.
c.
slmmons I
REPORT MONTH April 1992 TELEPHONE (zusj-J/>-uony l
}
(4)
(5)
(1) 2)
I i l
E HOD I
A OF LICENSE CAUSE AND CORRECTIVE T
l Y
O CHUT EVENT SYS-ACTICN TO P
DURATION O
DOWN REPORT TEM COMPONENT PREVENT RECURRENCE I
N DATE E
HOURS N
R/X NO.
CODE CODE O
'B' OF THE SOLID STATE f
TRAIN A I IA.
XXXXXX PROTECTION SYSTEM INOPERABLE 7-P 92-4-21 F'
(4) Exhibit G - Instructions (3)
(1)
(2 Method:
for Preparation of Data esson-1-Manual Ent W Sneets For Licensee F Forced A-Equipment FailureB-Maintenance or test (Explain) 2-Manual Scram Event Report (LER)
S Scheduled 3-Automatic Scram C-Refueling 4-Other (Explain)
File (NUEG-0161)
D-Regulato q Restriction E-Operator Araining & License Examination (5)Exhibit I - Same Source F-Adm3 strative G-Operu or Error (Explain)
H-Other (Explain)
L
4 (m=
r
- s
~
DOCKET NO: '50 369 o
UNIT: McGuire 1 DATE:
5/13/92.
i
~I NARRATIVE
SUMMARY
U MONTH: ' April 1992 McGuire Unit 1 began the month of April at 97.8% due to over power celta temperature spiking problems. Unit statted power decrease at 1100 on
- due to the solid state-protection systen being inoperable. The unit-was held at approximately 60% power and started power esculation at 1410 and reached:100% full power. at 2113.
At.1028 on 4/29 the unit started a load decrease due to'"B" steam generator PORV leaking.
Power esculation began at 1045 at 100% full power was reached at 1088, s
a
'71 -
itc V
- - -7 l
rPrepared by:
N. C. Sinsons Telephone:
704 373-8559 i..
i.
l:j-L
!L N
1 MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name:_ligGuire.
Unit 1 2.
Scheduled next refueling shutdown: March 1993 3.
Scheduled restart following refueling: June 1993 THE PROJECT l'JJ1AGER HAS DEEN ADVISED BY SEPARATE COMMUNICATION OF
=ANY T.S.
CHANGE - OR LICENSE AMENDMENT.
THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED T.N THIS REPORT.
4.-
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
-5.
Scheduled-date(s) ~ for submitting proposed -licensing action and supporting information.
6.
Important. licensing considerations (new.or different design or supplier,- unreviewed design or performance analysis
- methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 12,1 (b) in the spent fuel pool: 519 8.
.Present licensed fuel pool capacity: 1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated - by present licensed capacity: March 2006 DUKE POWER COMPANY DATE:
Eiv 15, 1992 Name of Contact;.
R.
A.
Williams Phone:
704-373-5987 L.
- \\.
OPERATING DATA REPD1T COCKET ND 50-370 DATE ! Lay,15. 1992 DPERATING STATUS COMPLEirD St _,l A Williaes TELEPH0hE 704-373-5987
). Unit Name McGoire 2
- 2. Reporting feriod: April 1, 1992-April 30, 1992 2 3. Licensed Thereal Poser (MWt): -
3411-S
=
.4. Naseplate Rating (Bross MWels 1305*-
Notes *Naseplate Rating
- 5. Design Electrical Patir; (Net MWe):
!!B0 (6ross MWel calculated as
~ 6. Manteus Dependable Capacity 19 tost MWe):
1171 1450.000 h'VA x.90 power
- 7. Maxieus tependable Capacity _(Net MWe): _ '1129 factor per Fage iii, 8.;!f. Changes 0ccur in Capacity Ratings (!tess Nusber 3 Through 7) Since Last
-Resort.GiveReasons:
l N'JRE6 0020.
1 A
- 9. Power Level To Which Restricted, If Any (Net MWe):
10.ReasonForRestrictionsiIfany:
s.
9 This MontL Yr.-to-Date Cuaulative 11.' Hours in Reperting Period 719.0 e903.0-71591.0
- 12. Nueber Of Hours Rea:;or Was Critical 704.2 1285.0 5%B6.4 '
"13. Reacter Reserve Shutdown Hours
--0--
--0--
--0--
.1 0 Hours Generator On-Line.
700.9 1234.7 53587.6
-15. Unit Reserve Shutdown Hours-
--0--
--0--
--0--
Ll6._ Gross Thersal Energy Benerated (MWH1-2321028 3796157 174812587
- 17. Gross Electrical Energy Generated (MWHI B15622 13349s 61167011
-18. Net Electrical Energy Generated (MWH) 724707 1263345 58643756
,19. Unit Service factor-97.5 42.5-74.8
- 20. Unit Availability Facter' 97.3 42.5 74.B
'21. Unit Capacity Factor (Using MDC Net) 96.7
'8.6 71.5
- 22. Unit Capacity Factor tusing DER Net)
'92.5 36.9 69.4 l23. Unit Forced Outage Rate 2.5 5.4 0.0
.24. Shutdenn Scheduled Over Next 6 Months (Tw e, Date, and Duration of Each):
None
'25. If Shut-Down At End Of Report Period. Estimated Date of Startupt
- 26. Units.In Test Status (Prior to-Consercial Operationi Forecast Achieved
!NITIAL CRITICAll1Y~
INITIAL ELECTRICITY COMMERCIAL 0FERAT10N
N 9
4 y
1
-OPERAllNGDATA. REPORT, 7.g o
DOCLET NO
$0-370 l'WII McGuire 2
.DATEMay 15. 1992 COMPLETED BT,_., R. A. Willim TELEPHONE 704-373-5937
- MONTH
'Act11. 1992.
' Pfl_
!AVEPAGE DAILY POWER LEVEL
[Al AVERAGE DAILY F0WER LEVEL (P.We-Nat)
(MWe-Net) 1-1159 17
!!56
- 2 --
1159
-19 1156 L3-
-1158 17 1155
- (
1159-20 1155 5'
1159 21 1156
.6
- 1159 22.
I156
.7 1159 23 1155
.8' 1159 '
' 24 1155
.i
- ?i
-615' 25 1154 l
.- 10
-122
. 26 1149 Lil 911 27
!!52 12 1155 20 1151 713-'-
+1151 29
- 1152, J
~ 14 -
'1155
' 30
~1156
'15
~
1155-16 -
1154 4
\\
DOCKET NO.
50-370 l
l UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME nCuulub z DATE vo/lo/9z l
COMPLETED BY N.
C.
61mmons REPORT MONTH April 1992 TELEPHONE (fu4)-Jea-udov f
(1)
(2)
/3)
(4)
(5)
R NET-E HOD T
A OF LICENSE CA9SE AND CORRECTIVE Y
S SHUT EVENT SYS-ACTION TO P
DURATION O
DOWN REPORT TEM COMPONENT PREVENT RECURRENCE N
DATE E
HOURS
'N R/X NO.
CODE CODE O
AUTOMATIC TRIP DUE TO A LOSS OF BOTH FEEDWATER PUMPS ON LOSS OF HH INSTRU 8
92 9 F
'. 8.12 A
3 CONDENSATE PUMPS WHEN A VALVE ii TRANSMITTER FAILED HG XXXXXX CHEMISTRY B
START SECOND TEEDWATER PUMP 9-P 92-4-10 F
HB PUMPXX NUCLEAR INSTRUMENTATION CALIBRATION H
10-P 92-4-11 F
IA INSTRU B
HEATER DRAIN TANK PUMPS IN 11-P 92-4-11 F
HB PUMPXX PLACE
'C' SERVICE H
12-P 92-4-11 F
(4) i (3) ethod:
Exhibit G - Instructions (1)
(2)
M for Preparation of, Data 1-Manual Ent U Sneets For Licensee Peason*
F Forced A-Equipment FailureB-Maintenance or test (Explain) 2-Manual Scram (NUREG-0161))
Event Report (LER S Scheduled 3-Automatic Scram 4-Other (explain)
File C-Refueling D-Regulatory RestrictionLicense Examination (5[xhibit I - Same Source E-Operator Training &
e F-Administrative H-Other (Explain) (Explain)
G-Operator Error
-z:
t UNIT: McGuire 2 DATE:
5/13/92 NARRATIVE
SUMMARY
MONTH: April,1992
- McGuire Unit 2 began the month of April operacing at 100% full power.
- At 1304 on 4/9 the unit automatically tripped due to loss of both feedwater-pumps on loss of condensate pumps.
The unit started power
- esculation at 0711 on 4/10 and held at 10% from 1307 to.0125 on 4/11 for chemistry.
Uni.. was held at approximately 35% from 0235 to'0410 to
. start afsecond'feedwater pump. -Unit was held at approximately 40% for
- nuclear-instrumentation calibration and at 63* from 0720 to 0830 to place.the "C" heater drain tank pumps in service. The unit reached 100%
full-power at 1928. The unit operated the rest of the month at 100%
-full power.
P
\\'-
d
-3_.
L Prepared by:
N. C. Simmons Telephone:
704-373-8559 b
b
=
m--
e w
e
/
lipNTHLY REFUELING INFORMATION REOUEST
-1.
Facility name: McGuirs.
Un_Lt;_l 2.
Schaduled next refueling shutdown: June 1993 3.
Scheduled restart following refueling: September 1993 THE PROJECT MANAGER HAS BEEN ?.DVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, har reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(c) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or
- supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 241 8.-
Present licensed fuel pool capacity: 1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: p_ecember 2003 DUKE POWER COMPANY DATE:
May 15. 1992 Name of
Contact:
R.
A. Williams Phone:
204-373-5987
(