In Reply Refer To:
ggy i g g
Dockets: 50-313/86-13
50-368/86-13
Arkansas Power & Light Company
ATTN:
T. Gene Campbell
Vice President -
Nuclear Operations
P. O. Box 551
Little Rock, Arkansas 72203
Gentl emen:
This refers to the inspection conducted by Messrs. W. D. Johnson and
C. C. Harbuck of this office during the period April 1-30, 1986, of activities
authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,
Units 1 and 2, and to the discussion of our findings with Mr. J. M. Levine, and
other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included operational safety verification,
maintenance, surveillance, followup on licensee's response to selected safety
issues, followup on licensee event reports, and followup on IE Bulletins and
Information Notices. Within these areas, the inspecticn consisted of selective
examination of procedures and representative records, interviews with
personnel, and observations by the inspectors. The inspection findings are
documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
.
RIV:RP
Y
C: RAS
C:RPB
[if/g/86
JEGagliardo
g
MEMu p
g
DRHun
(/\\/86
g/ p/86
&
mes m%>
G
l
i
,
,.
Arkansas Power & Light Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
. iginal S gned Ey
@3 Wa
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1. . Appendix A - Notice of Violation
'2.
Appendix B - NRC Inspection Report
50-313/86-13
50-368/86-13
cc w/ enclosures:
J. M. Levine, Director
Site Nuclear Operations
-
~..
Arkansas Nuclear One
- _
P. O. Box 608
Russellville, Arkansas . 72801
~
'
. . _ .
Arkansas Radiation Control Program Director
bec to DMB (IE01)
l
bec-distrib. by RIV:
- RPB
- Resident Inspector
R. D. Martin, RA
- EP&RPB
- Section Chief (RPB/B)
- D. Weiss, LFMB (AR-2015)
- RIV File
E. H. Johnson, DRS&P
- MIS SYSTEM
- RSTS Operator
- w/766-
i