ML20198C867

From kanterella
Jump to navigation Jump to search

Forwards Notice of Withdrawal of Application for Amends to Licenses Re Withdrawal of 970505 Request for Amends to FOLs DPR-44 & DPR-56.Amends Would Have Involved USQ & Replaced Suction Strainers for ECCS
ML20198C867
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/15/1998
From: Thadani M
NRC (Affiliation Not Assigned)
To: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20198C873 List:
References
TAC-M98684, TAC-M98685, NUDOCS 9812220199
Download: ML20198C867 (3)


Text

-. _

l December 15, 1998 Mr. Garrett D. Edwards Director-Licensing, MC 62A-1 l

PECO Energy Company l

Nuclear Group Headquarters Correspondence Control Desk P.O. Box No.195 Wayne, PA 19087-0195

SUBJECT:

EMERGENCY CORE COOLING SYSTEM PUMP SUCTION STRAINER UNREVIEWED SAFETY QUESTION - WITHDRAWAL OF AN AMENDMENT REQUEST, PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (TAC NOS. M98684 AND M98685) l

Dear Mr. Edwards:

By letter dated May 5,1997, as supplemented by letters dated August 22 and September 26, 1997, PECO Energy Company applied for amendments to Facility Operating License Nos.

DPR-44 and DPR-56 for Peach Bottom Atomic Power Station, Units 2 and 3. The proposed change would have involved an unreviewed safety question (USQ) and modified the facility, as described in the Updated Final Safety Analysis Report, by replacing the suction strainers for emergency core cooling system. Subsequently, by letter dated December 11,1998, the licensee withdrew the amendment request.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendments to Facility Operating Licenses with the Office of the Federal Register for publication. The associated TAC Nos. M98684 and M98685 are being closed.

Sincerely, original signed by:

Mohan C. Thadani, Senior Project Manager

$R O

O 0277 Project Directorate 1-2 p

PDR Divis, ion of Reactor Projacts - 1/II Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278

Enclosure:

Notice of Withdrawal cc w/ encl: See next page DISTRIBUTION g

Docket File MO'Brien g\\

PUBLIC OGC c.14, y* O D

i l

PDI-2 Reading ACRS JZwolinski CAnderson, RGN-1 RCapra MThadani

.A/

POf k/[k OFFICE P

PDl-2/D i'

f l /,/ lv-'

gys NAME MThadani:rb iMO'Brien -

RCapra

/% /6/98 O/ / $8 12 / 35/9 8 DATE

/

OFFICIAL RECORD COPY DOCUMENT NAME: PB98684.WDR

} } } f

'f " ' f f{

    • %q p

t UNITED STATES s

}

NUCLEAR REGULATORY COMMISSION i

( [* %* #g WASHINGTON, D.C. =anaam anni i

December 15, 1998 1

Mr. Garrett D. Edwards Director-Ucensing, MC 62A-1 PECO Energy Company 4

Nuclear Group Headquarters Correspondence Control Desk P.O. Box No.195 Wayne, PA 19087-0195

SUBJECT:

EMERGENCY CORE COOLING SYSTEM PUMP SUCTION STRAINER UNREVIEWED SAFETY QUESTION - WITHDRAWAL OF AN AMENDMENT REQUEST, PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3

{

(TAC NOS. M98684 AND M98685)

Dear Mr. Edwards:

i l

By letter dated May 5,1997, as supplemented by letters dated August 22 and September 26, t

1997, PECO Energy Company applied for amendrnents to Facility Operating Ucense Nos.

DPR-44 and DPR 56 for Peach Bottom Atomic Power Station, Units 2 and 3. The proposed i

change would have involved an unreviewed safsty question (USQ) and modified the facility, as described in the Updated Final Safety Analysis Report, by replacing the suction strainers for emergency core cooling system. Subsequently, by letter dated December 11,1998, the licensee withdrew the amendment request.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendments to Facility Operating Ucenses with the Office of the Federal Register for publication. The 2

associated TAC Nos. M98684 and M98685 are being closed.

Sincerely, Mohan C. Thadani, Senior Project Manager Project Directorate 1-2 Division of Reactor Projects-t/ll Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278

Enclosure:

Notice of Withdrawal cc w/ encl: See next page

Mr. Garrett D. Edwards PECO Energy Company Peach Bottom Atomic Power Station, Units 2 and 3 cc:

J. W. Durham, Sr., Esquire l

Sr. V.P. & General Counsel Chief Division of Nuclear Safety l

PECO Energy Company PA Dept. of 2301 Market Street, S26-1 Environmental Resources Philadelphia, PA 19101 P.O. Box 8469 Harrisburg, PA 17105-8469 PECO Energy Company

' ATTN: Mr. J. Doering, Vice President Peach Bottom Atomic Power Station Board of Supervisors 1848 Lay Road Peach Bottom Township Delta, PA 17314 R. D. #1 Delta, PA 17314 PECO Energy Company ATTN: Regulatory Engineer, A4-SS Public Service Commission of Maryland Peach Bottom Atomic Power Station Engineering Division 1848 Lay Road Chief Engineer i

Delta, PA 17314 6 St. Paul Centre Baltimore, MD 21202-6806 Resident inspector U.S. Nuclear Regulatory Commission Mr. Richard McLean Peach Bottom Atomic Power Station Power Plant and Environmental P.O. Box 399 Review Division Delta, PA 17314 Department of Natural Resources B-3, Tawes State Office Building Regional Administrator, Region I Annapolis, MD 21401 U.S. Nuclear Regulatory Commission --

i 475 Allendale Road Dr. Judith Johnsrud

~'

~

King of Prussia, PA 19406 National Energy Committee Sierra Club Mr. Roland Fletcher 433 Orlando Avenue Department of Environment State College, PA 16803

- 201 West Preston Street Baltimore, MD 21201 Manager-Financial Control & Co-Owner Affairs A. F. Kirby, lll Public Service Electric and Gas Extemal Operations - Nuclear Company P.O. Box 236

. Delmarva Power & Light Company - -

Hancocks Bridge, NJ 08038-0236 P.O. Box 231 Wilmington, DE 19899 Manager-Peach Bottom Licensing,

PECO Energy Company PECO Energy Company Plant Manager Nuclear Group Headquarters Peach Bottom Atomic Power Station Correspondence Control Desk P.O. Box No.195 1848 Lay Road Delta, PA 17314 Wayne, PA 19087-0195 l

- --