Notice of Amend to Coc GDP-1 for Usec Portsmouth Gaseous Diffusion Plant (Ports),Piketon,Oh.Amend Involves Extension of Ports Compliance Plan Completion Date Re Removal of Residual Quantities of HEU from Cylinders
ML20198B013
Person / Time
Site: Portsmouth Gaseous Diffusion Plant
Issue date: 12/02/1998
From: Paperiello C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
References
NUDOCS 9812180034
Download: ML20198B013 (7)


Text

.

IM 19)A l

l 7590-01

' i U.S. NUCLEAR REGULATORY COMMISSION NOTICE OF AMENDMENT TO l CERTIFICATE OF COMPLIANCE GDP-1 FOR THE U.S. ENRICHMENT CORPORATION PORTSMOUTH GASEOUS DIFFUSION PLANT D$ N M 0h

  • UM I

% DEC -7 A10:37 The Director, Office of Nuclear Material Safety and Safeguards, has made a determination that the following amendment request is not significant in accordance with 10 CFR 76.45. In making that determination, the staff concluded that: (1) there is no change in the types or significant increase in the amounts of any effluents that may be released offsite; (2) there is no significant increase in individual or cumulative occupational radiation exposure; (3) there is no significant construction impact; (4) there is no significant increase in the potential for, or radiological or chemical consequences from, previously analyzed accidents; (5) the proposed changes do not result in the possibility of a new or different kind of accident; (6) there is no significant reduction in any margin of safety; and (7) the proposed changes will not result in an overall decrease in the effectiveness of the plant's safety, safeguards or security programs.

The basis for this determination for the amendment request is shown below.

The NRC staff has reviewed the certificate amendment application and concluded that it I 07 l

provides reasonable assurance of adequate safety, safeguards, and security, and compliance j

with NRC requirements. Therefore, the Director, Office of Nuclear Material Safety and Safeguards, is prepared to issue an amendment to the Certificate of Compliance for the

< [

Portsmouth Gaseous Diffusion Plant (PORTS). The staff has prepared a Compliance l

l Evaluation Report which provides details of the staff's evaluation.

l 9812180034 981202 l PDR ADOCK 07007002 C PM -

4 2

The NRC staff has determined that this amendment satisfies the criteria for a categorical exclusion in accordance with 10 ~CFR 51.22(c)(19). Therefore, pursuant to 10 CFR 51.22(b),

no environmental impact statement or environmental assessment need be prepared for this amendment.

USEC or any person whose interest may be affected may file a petition, not exceeding 30 -

pages, requesting review of the Directors Decision. The petition must be filed with the Commission not later than 15 days after publication of this Federal Register Notice. A petition for review of the Directofs Decision shall set forth with particularity the interest of the petitioner l and how that interest may be affected by the results of the decision. The petition should  !

specifically explain the reasons why review of the Decision should be permitted with particular reference to the following factors: (1) the interest of the petitioner; (2) how that interest may be affected by the Decision, including the reasons why the petitioner should be permitted a review of the Decision; and (3) the petitioners areas of concern about the activity that is the subject matter of the Decision. Any person described in this paragraph (USEC or any person wno filed j l

a petition) may file a response to any petition for review, not to exceed 30 pages, within 10 days after filing of the petition. If no petition is received within the designated 15-day period, the Director will issue the final amendment to the Certificate of Compliance without further delay, if a petition for review is received, the decision on the amendment cpplication will become final in 60 days, unless the Commission grants the petition for review or otherwise acts within 60 days after publication of this Federal Register Notice.

l

3 .

A petition for review must be filed with the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemakings and Adjudications Staff, or may be delivered to the Commission's Public Document Room, the Gelman Building,2120 L Street, NW, Washington, DC, by the above date.

For further details with respect to the action see (1) the application for amendment and (2) the Commission's Compliance Evaluation Report. These items are available for public inspection at the Commission's Public Document Room, the Gelman Building,2120 L Street, NW, Washington, DC, and at the Local Public Document Room.

Date of amendment request: October 14,1998 Brief description uf amendment: The amendment involves extension of the PORTS Comr,liance Plan completion date related to the removal of residual quantities of highly enriched uranium (HEU) (uranium enriched to 10 percent by weight U-235 or more) from cylinders and the cleaning of the emptied HEU cylinders from December 31,1998, to March 31,1999.' The amendment also involves extension of the PORTS Compliance Plan completion date, for transition of regulatory oversight responsibility from the Department of Energy (DOE) to the NRC, for the section of the X-705 decontamination building where HEU cylinder cleaning operations are ongoing, frorn January 31,1999, to April 30,2000. All Compliance Plan completion date changes require prior DOE approval. As such, USEC requested DOE approval for the above-mentioned date changes on September 25,1998. On October 13,1998 DOE approved the revision.

.- l 4 I 4

Basis for finding of no significance:

1 4

1. The proposed cmendment will not result in a change in the types or significant increase in 1

the amounts of any effluents that may be released offsite. 1 l

l The proposed amendment, which involves extensions of the PORTS Compliance Plan completion dates, does not invcive any need for cleaning of additional HEU cylinders and therefore would not increase the amounts of any effluents that may be released offsite or result in any impact to the environment.

i l

2. The proposed e.mendment will not result in a significant increase in individual or cumulative occupational rad!ation exposure.  ;

The proposed amendment does not involve any need for cleaning of additiona! HEU cylinders.

Therefore, it will not significantly mcrease incividual or cumulative occupational radiation  ;

4 exposure.

3. The proposed amendment will not result in a significant construction impact.

i The proposed change will not resu!t in any construction, nor will this change effect any planned j or existing construction project, therefore, there will be no construction impact.

l 1

4. The proposed amendment will not result in a significant increase in the potential for, or I radiological or chemical consequences from, previously analyzed accidents. I l

l i

5 The p'roposed amendment does not involve any need for cleaning of additional HEU cylinders and will not result in a significant increase in the potential for, or radiological or chemical consequences from, previously analyzed accidents.

5. The proposed amendment will not result in the possibility of a new or different kind of accident.

The proposed amendment only involves extensions of the PORTS Compliance Plan completion dates. Therefore, this change will not result in the possibility of a new or different kind of accident.

6. The proposed amendment will not result in a significant reduction in any margin of safety.

The proposed amendment only involves extensions of the PORTS Compliance Plan completion dates. Therefore, the proposed change does not represent a reduction in any margin of safety.

7. The proposed amendment yN not result in an overall decrease in the effectiveness of the plant's safety, safeguards or security programs.

-Currently, at PORTS, the X-705 West Annex is the only area leased by USEC from DOE which hac not been certified by'he NRC. Based on the agreement signed between DOE and USEC on October 11,1995, the Regulatory Oversight Agreement between DOE and USEC is required to apply to all arcss ! eased by USEC from DOE hut not certified by the NRC. As such, operations in the X-705 West Annex will continue to be conducted under regulation of the ROA

4 ,

.- 1

. I 1

6 until the HEb cylinder cleaning operations have been completed and the X-705 West Annex is certified by the NRC. While the ROA is in effect, DOE staff has informed the NRC staff, that they will maintain regulatory staff in Oak Ridge, Tennessee, and a resident inspector at PORTS, to ensure that HEU cylinder cleaning is conducted in a safe and secure manner, in j i

addition, the NRC staff has also reviewed the controls in place in the X-705 West Annex, which l

are relied upon by USEC to prevent it from exceeding the NRC-possession limits by accidentally transferring significant quantities of HEU frorn the X-705 West Annex to NRC-certified areas. The NRC staff has determined these controls, as well as DOE's regulatory oversight of the X-705 West Annex operations, to be sufficient for preventing USEC from exceeding its possession limits in NRC-certifi d areas at PORTS. Therefore, the Compliance Plan date extensions will not result in undue risk to the public health and safety, common defense and security, or the environment.  ;

l l

Effective date: The amendment to GDP-2 will become effective upon issuance by NRC.

1 Certificate of Compliance No. GDP-2: This amendment will revise issue A.4 of the PORTS j l

Compliance Plan.  !

, . - i l

c ,,.. -l

c. ....

! - 4 L 7 l t

l- . -

I l l

l' Local Public Document Room location: Portsmouth Public Library,1220 Gallia Street, I" Portsmouth, Ohio 45662 '

i L

p.. u- Dated at Rockville, Maryland, this [ day of December 1998.

l ., FOR THE NUCLEAR REGULATORY COMMISSION jw s

}/[

Carl J. Papericllo, Director Office of Nuclear Material Safety and Safegt:ards i l