Georgia Power Company 333 Piedmont Avenue Atlanta Georgia 30308 Telephone 404 526-6526 Maihng Address:
Post Office Bcx 4545 Atlanta, Georg'a 30302 b
Georgia Power L T. Gucwa Manager Nuclear Safety and Licensing 0513C May 9,1986 Director of Nuclear Reactor Regulation Attention: Mr. D. Muller, Project Director BWR Project Directorate No. 2 Division of Boiling Water Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 OUTSTANDING SUBMITTALS LIST Gentlemen:
Enclosed please find an updated listing of those items of correspondence with the NRC to which a written' response is expected.
The enclosure is tabulated chronologically by Georgia Power Company's (GPC) submittal date.
GPC is prepared to promptly address any questions you might have regarding these licensing issues.
GPC acknowledges and appreciates the recent NRC efforts to complete licen::ing action on our submittals related to:
licensed operator requalification program and continued operation of Unit 1 with a core spray sprager clamp installed.
If you have further questions, please contact this office at any time.
Sincerely, d
L. T. Gucwa HJBlackwood/lc Enclosure c: Mr. J. P. O'Reilly Mr. J. T. Deckham, Jr.
0p}
Mr. H. C. Nix, Jr.
Dr. J. N. Grace (NRC-Region II) j Senior Resident Inspector l(g GO-NORMS 8605190061 860509 PDR ADOCK 0 gi
Pcgo No.
1 05/08/86 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC LETTER UNIT SUBJECT DATE O APPROVAL OF ITEM REQUIRED FOR UPCOMING OUTAGE C ITEM CLOSED SINCE LAST REPORT N ITEM ADDED SINCE LAST REPORT 01/26/77 321 PROPOSED CHANGES TO INTEGRATED LEAK RATE TESTING 08/30/77 321 PROPOSED TECHNICAL SPECIFICATIONS - ALLOW USE OF MODIFIED CRANE TO LIFT SPENT FUEL CASK 10/03/78 321 PROPOSED TECHNICAL SPECIFICATIONS - CIIANGE PSW, DIESEL REQUIREMENTS TO REFLECT SWING STATUS OF D/G 1B 03/05/79 321 PROPOSED TECHNICAL SPECIFICATIONS - REMOVE REFERENCE TO OUTDATED VERSION OF APPENDIX J 09/27/82 366 PROPOSED TECHNICAL SPECIFICATIONS - BUILDING SETTLEMENT SURVEILLANCE - SUBMIT UPDATED TABLE 04/15/83 321,366 GENERIC LETTER 82 REQUIREMENTS FOR EMERGENCY RESPONSE CAPABILITY 04/23/84 366 PROPOSED TECHNICAL SPECIFICATIONS - ATWS RPT LCO CLARIFICATIONS 09/05/84 366 PROPOSED TECHNICAL SPECIFICATIONS - PRIMARY CONTAINMENT ISOLATION OF PURGE AND VENT ON III RAD 09/12/84 321 PROPOSED TECHNICAL SPECIFICATIONS - OPERABILITY DEFINITION 09/19/84 366 FRACTURE MECIIANICS ANALYSIS PER GENERIC LETTER 81 FEEDWATER NOZZLE 11/09/84 321,366 DIESEL GENERATOR TECHNICAL SPECIFICATIONS 01/10/85 366 REQUEST TO RESCIND CONFIRMATORY ORDER ON REACTOR COOLANT SYSTEM STAINLESS STEEL PIPE 01/17/85 321 PROPOSED FIRE PROTECTION TECIINICAL SPECIFICATIONS -
MODIFICATION TO TIIE NUMBER AND LOCATION OF FIRE DETECTORS 05/06/85 321,366 PROPOSED MODIFICATIONS AND SCIIEDULE FOR REACTOR WATER LEVEL INSTRUMENTATION IMPROVEMENTS - GENERIC LETTER 84-23 05/13/85 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEISMIC SPECTRA BROADENING
,~,
n.~
n..a
..a i.an..
~
..a.
L
1 Pcgo No.
2
. 05/08/86 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC LETTER UNIT SUBJECT DATE l
06/03/85 321,366 REQUEST FOR ADDITIONAL INFORMATION GENERIC LETTER 83,
SALEM' EVENT - SCRAM-BREAKER FAILURE 1
- 06/25/85 321,366 INSERVICE TESTING - INSERVICE INSPECTION PROGRAMS UPDATE
}07/26/85321 REQUEST TO REVISE TECHNICAL SPECIFICATIONS - ADD SPECIFICATION AND TABLE ADDRESSING COMPONENT CYCLIC AND TRANSIENT LIMITS j 08/22/85 321 C REQUEST FOR APPROVAL OF ANOTHER CYCLE WITH CORE SPRAY SPARGER CLAMP 1
l 08/20/85 321 PROFOSED CHANGES TO THE TECHNICAL SPECIFICATIONS FOR HIGH j
RADIATION ISOLATION OF PURGE' AND VENT VALVES
'DOCR 85-20 09/13/85 321,366 REQUEST TO REVISE TECHNICAL SPECIFICATIONS - SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVE CLOSURE TIME i
I 09/24/85 321,366 C REVISED LICENSED OPERATOR REQUALIFICATION PROGRAM
! 01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - DELETE CONTROL j
BUILDING CO2' FIRE SUPPRESSION SYSTEM - DOCR 85-16 l01/06/86321 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - DELETE FIRE j
HOSE STATIONS FROM TABLE DOCR 85-14 i'
01/06/86 366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - DELETE REQUIREMENT FOR HYDROGEN RECOMBINERS i 01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - 45 SECONDS ON SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVE CLOSURE TIME I
l 01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIPI'ATIONS - SHIFT OVERTIME C
l REQUIREMENTS-j 01/07/86 321 APPENDIX G AND H TECHNICAL-SPECIFICATIONS - REACTOR PRESSURE VESSEL MATERIAL SURVEILLANCE CAPSULES AND FRACTURE TOUGHNESS 1
i ANALYSIS 4
01/07/86 321 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - AUTOMATIC ISOLATION OF PURGE AND VENT ON HIGH RADIATION SIGNAL 01/27/86 321,366 REVISION TO GASEOUS EFFLUENT TECHNICAL SPECIFICATIONS -
SAMPLING REQUIREMENTS AFTER A POWER LEVEL CHANGE, TRITIUM j
i 01/31/86 321,366 GENERIC LETTER 83 SALEM ATWS - CLOSURE OF ITEMS 3.1.3 AND 3.2.3
~~,
l
.a uh4,w d h i v
-.w h,'i$sidaAU,, xA&MNdiM50 J,-
. m, k.
1
.. ~
+
l Pcge No.
3 05/08/86 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC LETTER UNIT SUBJECT DATE
~
l 02/07/86 321,366 RFAI INSERVICE INSPECTION PROGRAM 02/17/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - REORGANIZATION
- RESPONSIBILITY FOR RADIOLOGICAL ENVIRONMENTAL MONITORING, i
ENVIRONMENTAL TECHNICAL SPECIFICATIONS, MET' TOWER LOCATION, J
QA-RECORDS, DELETE'EPDD, ETS PROCEDURE APPROVAL 02/28/86 321,366 PROPOSED LICENSE EXTENSION TO 40 YEARS FROM OPERATING LICENSE VICE CONSTRUCTION ~ PERMIT 03/03/86 321 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - PRIMARY CONTAINMENT ISOLATION SYSTEM LISTING CORRECTIONS 03/07/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - TO ALLOW MINI TEST FOR HYDROGEN WATER
- CHEMISTRY 03/13/86 321,366 REQUEST FOR ADDITIONAL INFORMATION - MODIFICATION OF VACUUM BREAKERS ON MARK 1 CONTAINMENTS GENERIC LETTER 83-08 1
) 03/27/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - EQUALIZING REACTOR-PROTECTION SYSTEM SPECIFICATIONS BETWEEN UNITS j 03/31/86 321,366 PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS - EMERGENCY J
POWER - DIESEL GENERATOR TESTING - GENERIC LETTER 84-15 04/04/86 366 REITERATION OF PROPOSED DELETION OF BUILDING SETTLEMENT TECHNICAL SPECIFICATIONS WITH INCORPORATION OF SETTLEMENT CRITERIA FROM OUR 12/1/78 LETTER INTO PLANT PROCEDURES
' 04/15/86 321,366 N PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS - FUEL STORAGE i
REQUIREMENTS, FUEL ASSEMBLY DESIGN, MAPLHGR LIMITS, ROD l
WORTH MINIMIZER, ROD SEQUENCE CONTROL, BANKED POSITION WITHDRAWAL SEQUENCE, EDITORIAL CHANGES l
1 1
I l'_<.=
'f 6-
, J4.w M Y%As esu m 4An -
.n 4 -- -
ue'y 4WlWeete&.ng4&<.rus r&j.) q~-l,Joh.
w.>.-
r