ML20197F915
| ML20197F915 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 03/24/1983 |
| From: | Knighton G Office of Nuclear Reactor Regulation |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML20197F919 | List: |
| References | |
| FOIA-86-489 NUDOCS 8304010001 | |
| Download: ML20197F915 (1) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _
'c UNf TED STATES
! yg,, [,}
NUCLEAR REGULATORY COMMISSION
- .f g s./
e WASHINGTON. D. C. 20555 S,,'[
s..,4 i f/AE 2 4 lhE'.
4 j
Docket Nos.:
50-275 and 50-323 MEMORANDUM FOR:
T. Bishop, Chief, Reactor Construction Projects Branch, Region V FROM:
G. W. Knighton, Chief, Licensing Branch No. 3, DL EUBJECT:
DIABLO CANYON UNIT 1 AND 2 SALP We have reviewed the draft of the Region V SALP evaluation. We reconsnend that the following changes be made:
1.
Section IV.2 Independent Design Verification Program (IDVP)
Add: The NRR evaluation of the design verification effort is provided in Section.VI.9.
2.
Section V.8 Licensing Activities Add: The NRR evaluation of licensing activities is provided'in Section VI.9.
3.
Section VI.9 Licensing Activities Repl ace:
See Attachment 1 (with Appendix) for the NRR evaluation and conclusion for all licensing activities, including those related to the design verification effort.
l.
/
/ ' h
. _,yggc.g4'N'.'Qf:v] BL' t[eorge W' Knighton,' Chief Licensing Branch No. 3 Division of Licensing 8
P3%M ool
?'
,.