ML20197B937
| ML20197B937 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 10/22/1986 |
| From: | Oconnor P Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20197B943 | List: |
| References | |
| TAC-60977, NUDOCS 8610310072 | |
| Download: ML20197B937 (7) | |
Text
.
gf UNITED STATES y
3 g
NUCLEAR REGULATORY COMMISSION D
-l WASHINGTON. D. C. 20555
%,...../
VAhSAS GAS 8 ELECTRIC COMPANY KANSAS CITY POWER AND LIGHT COMPANY KANSAS ELECTRIC POWER COOPERATIVE, INC.
WOLF CREEK GENERATING STATION DOCKET NO.
50-482 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 2 License No. NPF-42 1.
The Nuclear Regulatory Conmission (the Consission) has fouid that:
A.
The application for amendment to the ' Wolf Creek Generating Station (the facility) Facility Operating License No. NPF-4? filed by Kansas Gas and Electric Corrpany acting for itself and Kansas City Power and Light Company and Kansas Electric Power Cooperative, Inc., (licensees) dated March 4, 1986 as revised July 29 and September 18, 1986, com-plies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Conmission's regulations as set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Consission; C.
There is reasonable assurance: (1) that the activities authorized by this amendrrent can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Consission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this license amendment will not be inimical to the corson defense and security or to the health and safety of the public; E.
The issuance of this arrendirent is in accordance with 10 CFR Part 51 of the Conrnission's regulations and all applicable requirements have been satisfied.
0610310072 861022 PDR ADOCK 05000402 P
. 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. NPF-42 is hereby amended to read as follows:
2.
Technical Specification The Technical Specifications contained in Appendix A, as revised through Amendment No.
2, and the Environmental Protection Plan containeil in Appendix B, both of which are attached hereto, are hereby incorporated into the license.
KG8E shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION k
Paul W. O'Connor, Project Manager PWR Project Directorate No. 4 Division of PWR Licensing-A
Attachment:
Changes to the Technical Specifications Date of Issuance: October 22, 1986 Sk f
OGC Bythesda PWR#4/DPWR-A PR WR-A PWR#4/DPWR-A 3
M0un a /mac P0'Connor
.Xq mq h BJYoungblood 10/lO/86 10/l0/86 10//
8 2
10/2 186 0
W Afr an y
ATTACHMENT TO LICENSE AMENDMENT NO.
2 OPERATING _ LICENSE N0. NPF-42 DOCKET NO. 50-482 Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by amendment number and contain marginal lines indicating the area of change.
The corresponding overleaf page is also provided to maintain document completeness.
AMENDED PAGE OVERLEAF PAGE 6-3 6-4 6-10 6-9 ee I
i 1
.o I
C O
t*
M O
s A
B Cz
+4 PRESIDENT AND H
{---
FOR MATTERS OF AN IMMEDIATE NATURE. THE CHAIRMAN OF THE BOARD I
VICE PREIDENT - NUCLE AR COMMUNICATES l
l DlHECTLY WITH THE PRESIDENT AND CHAIRMAN OF THE BOARD.
l GROUP I
VICE PRESIDENT l
TECHNICAL SERVICES l
1 l
l L _ _.
VICE PRESIDENT NUCLEAR 1
NUCLEAR SAFETY REVIEW COMMITTEE (NSRC) 1 m
i I
La I
I DIRECTOR DIRECTOR ENGINEERING AND DIRECTOR NUCLEAR TECHNICAL SERVICES QUALITY OPERATIONS I
I I
I I
I I
I MANAGER MANAGER SUPT.
MANAGER MANAGER MANAGER PROCUREMENT MANAGER N
EAR NUCLEAR PLANT MANAGEMENT OUALITY OUALITY ADMINISTRATIVE CONSTRUCTION 1
& MATERIAL NUCLEAR OPERATIONS ENGINEERING SYSTEMS CONTROL ASSURANCE SERVICES MANAGER TRAINING SUPPORT I
MANAGER O
PLANT MANAGER ENGINEERING MANAGER SUPER 1 OR MANAGER NUCLEAR
& TECHNICAL SUPPLIER I
PLANS SERVICES SERVICES QUALITY l
fD
& SCHEDULE WCGS SUPPORT O
1 z
O MANAGER LICENSING to FIGURE 6.2-1 OFFSITE ORGANIZATION
I e
G n
E Plant Manager i
E 4
i
-Supt. of Technical
-Supt. of Regulatory, Quality
-Supt. of Maintenance
-Supt. of Operations Support
-Supt. of Plant Support and Administrative Services
-Maint Service Supv
-Ops Coord - Ops #
-Reactor Engineering
-Fire Protection'
-Documerit Control
-Instrument Er Controls
-Security *
- Administratinn
-Maint Support Supv
- hift Supenisor
-Mechanical
-Electrical
-Supervising Opr
-Chemistry
-Results Engineering
-Compliance
-Reactor Opr
-Station Operator
-Health Physics *
-Emergency Planning
-Medical
-Utility Helper
-Ops Coordinator -
Projects and Planning
-Engr / Specialist
-Surveillance Coord
- For technical matters of an immediato nature the respective individua! report g
directly to the Plant Manager.
a E.
- This position requires an SRO
- License, on Z
FIGURE 6.2-2 UNIT ORGANIZATION o
l l
ADMINISTRATIVE CONTROLS RESPONSIBILITIES (Continued) k.
Review of changes to the PROCESS CONTROL PROGRAM, the OFFSITE DOSE CALCULATION MANUAL and the Radwaste Treatment Systems, and 1.
Review of any accidental, unplanned, or uncontrolled radioactive release including the preparation of reports covering evaluation, recommendations, and disposition of the corrective action to prevent recurrence and the forwarding of these reports to the Plant Manager and to the Nuclear Safety Review Committee.
6.5.1.7 The PSRC shall:
Recommend in writing to the Plant Manager approval or disapproval a.
of items considered under Specification 6.5.1.6a. through d. above, b.
Render determinations in writing with regard to whether or not each item considered under Specification 6.5.1.6a. through e. above constitutes an unreviewed safety question, and c.
Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Director Nuclear Operations and the Nuclear Safety Review Committee of disagreement between the PSRC and the Plant Manager; however, the Plant Manager
{
shall have responsibility for resolution of such disagreements
\\
pursuant to Specification 6.1.1 above.
RECORDS 6.5.1.8 The PSRC shall maintain written minutes of each PSRC meeting that, at a minimum, document the results of all PSRC activities performed under the responsibility provisions of these Technical Specifications.
Copies shall be provided to the Director Nuclear Operations and the Nuclear Safety Review Committee.
6.5.2 NUCLEAR SAFETY REVIEW COMMITTEE (NSRC) l FUNCTION 6.5.2.1 The NSRC shall function to provide independent review and audit of designated activities in the areas of:
a.
Nuclear power plant operations, b.
Nuclear engineering, c.
Chemistry and radiochemistry, d.
Metallurgy, e.
Instrumentation and control, f.
Radiological safety, WOLF CREEK - UNIT 1 6-9
ADMINISTRATIVE CONTROLS FUNCTION (Continued) g.
Mechanical and electrical engineering, and h.
Quality assurance practices.
The NSRC shall report to and advise the Vice President-Nuclear on those areas of responsibility specified in Specifications 6.5.2.7 and 6.5.2.8.
COMPOSITION 6.5.2.2 The NSRC shall be composed of at least the following:
Chairman:
Manager Nuclear Services Member:
Director Engineering and Technical Services Member:
Manager Quality Assurance (Home Office)
Member Director Nuclear Operations Member:
Manager Licensing Member:
KCP&L Senior Director of Nuclear Affairs Member:
Manager Nuclear Safety Additional members and Vice Chairman may be appointed by the Chairman.
ALTERNATES 6.5.2.3 All alternate members shall be appointed in writing by the NSRC Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in NSRC activities at any one time.
i CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the NSRC Chairman to provide expert advice to the NSRC.
MEETING FREQUENCY l
6.5.2.5 The NSRC shall meet at least once per calendar quarter during the initial year of unit operation following fuel loading and at least once per i
6 months thereafter.
QUORUM 6.5.2.6 The quorum of the NSRC necessary for the performance of the NSRC review and audit functions of these Technical Specifications shall consist l
of the Chairman or his designated alternate and at least two-thirds of the NSRC members including alternates.
No more than a minority of the quorum shall have line responsibility for operation of the Unit.
WOLF CREEK UNIT 1 6-10 Amendment No. 2
-- -